Welcome to Creel Development, where quality craftsmanship meets reliability.

From land clearing to full-scale construction, we’ve got the experience and equipment to bring your vision to life.

08/21/2026

We have finished the demo on the new orthodontist in Hattiesburg, Mississippi.

Up next, the plumbing and electrical and then metal stud framing, and sheet rock

08/18/2026

We have some jobs openings listed below

- Concrete Forman
- Concrete laborer
- Operator
-Estimator

Jayden Creel 601-917-1888
Greg Creel 601-917-1866

Must have valid drivers license and be able to pass a drug test

Photos from Creel Development's post 08/12/2026

Started the demo for a new orthodontist in Hattiesburg , Mississippi
:9

08/04/2026

These beautiful fence panels are up! Go check them out at Ann's Alleyway

08/01/2026

Looking for 2 more guys! Have some big work coming up.

Operator
Concrete Forman
Experience labor

Photos from Creel Development's post 07/30/2026

This one is officially complete.

We want to say thank you to every person who had a hand in this project. From the first day of excavation to the final grading and rock, it took a lot of hardworking people to get us here.

Thank you to every operator, laborer, concrete finisher, truck driver, and everyone else who contributed along the way.

We’re grateful for the opportunity and proud of the finished product. Looking forward to the next project.

Thank you from all of us at Creel Development.

:9

Photos from Creel Development's post 07/29/2026

Proud to be able to serve down town Meridian

Was able to come in dig out for a 12 inch wide footing

And then came back with nice beautiful concrete. Up Next replacing the fence and putting it on top of the curb

Photos from Creel Development's post 07/22/2026

Update on Mickens Clay Rd Bridge Rd. box cover

Hauled in some red dirt to build the road bed up, dressed up the sides and finish it off with some 57 stone.

Up Next hydroseeding and sod

07/20/2026

Creel Development

www.google.com

07/15/2026

Day we've been waiting for started the road bed for the bridge.

Up next 6inch of topping followed by 57 stone