M.T. Engineering
Steel fabrication, agricultural engineering and machinery repairs
07/06/2026
It not just Big parts I machine. This particular job, an obsolete spool valve collet required a Micro boring bar and face grooving tool to be used. Nothings impossible, Everything can be replicated, it has already been made once before ππΌ
24/05/2026
I had a lot of comments on the original Lucas liner kit I made a few years back. Howβs this for an upgrade for the same customer, this time not only was it a brand new Lucas castor + 80R but the customer also wanted 5mm 450 HARDOX plate used as well as 8mm 450 HARDOX on the flywheel π₯΅ hopefully this will last a few years of 25 bales a day through her. The chute sections were also lined but unfortunately I lost the pictures. πΎπΎπ
04/05/2026
The second Stainless steel bottle pre wash table I have made for a local dairy π π₯
29/04/2026
JCB handler in for a headstock pivot line bore ππΌ
26/04/2026
This was a pretty cool project to be involved with. A Claas 850 forager which had to be cut down by 150mm either side before heading to its new home in Guernsey. This was not easy. The cab platforms, handrails, steps, step base platform all had to be cut down, the fuel filler re positioned and many panels had to be made from scratch to tie it all together nicely, these included the small infill strip behind the steps, the handrail panel on the step base platform, the lower door panel above the toolbox and as well as a whole new toolbox fabricated using a set of doors off a breaker machine. I was also asked to fabricate a set of additive drum holders for this machine.
18/04/2026
Internal splines cut into this aluminium pulley using the Butler slotting machine.
29/03/2026
I used swear words that I never even knew existed on this job but I got it done. Compensator Ram line bore, bottom bore had very little room to work and the top bore had even less room and was a blind hole π©
15/02/2026
Improvements to a Genie cherry picker boom linkage. 35mm wide bosses made and welded in line with existing pin holes. Bosses were machined undersize on the ID and line bored through after welding to ensure the pin alignment was spot on. π¨πΌβπ
08/02/2026
JCB handler in for a headstock pivot line bore last week as well as a new 40mm hydraulic cylinder rod made for a Kubota 2.7tonne digger.
07/02/2026
One I did back before Christmas: a 1m wide galvanised walkway, calculated to safely take over a tonne of weight per bay, this will allow for sandbags to be placed along the side of the clamp as it is un sheeted, all ready for when they are needed again for sheeting back down. Customer is fabricating the handrails themselves π ππΌ
Click here to claim your Sponsored Listing.
Category
Telephone
Website
Address
Exeter
EX5