Professional construction estimating services - BOQ preparation, rate build-up schedules, tender pricing and building plans.

Serving contractors across Kwazulu-Natal and rest of South Africa. Fast, Transparent and defensible pricing

11/05/2026

๐Ÿ—๏ธ This is What a Municipal Civil Contract Rate Build-Up Looks Like.
Not a guess. Not a benchmark pulled from thin air. Every single rate โ€” built from first principles. ๐Ÿ’ช

๐Ÿ“‹ Project: Completion of Civil Infrastructure Services
๐Ÿ˜๏ธ Location: ETafuleni, Ward 56 & 53 โ€” ~34km north of Durban CBD
๐Ÿ›๏ธ Client: eThekwini Municipality โ€” Deputy Director: Housing Engineering
๐Ÿ“„ Document Ref: RBS-36215-1H-Rev1 | May 2026
๐Ÿ‘ท Prepared by: Ndumiso Dubazane โ€” ProQuant Construction Estimators

This Rate Build-Up Schedule covers 9 full sections of civil infrastructure work โ€” every item broken down into MAT, LAB, PLT and CONS components, with 10% Overheads + 5% Profit applied consistently across all rates:
โš™๏ธ Section A โ€” Preliminaries & General
Formal contract sum ยท Sureties ยท Insurance ยท COIDA ยท Mobilisation ยท Engineer's office ยท Camp & store yard ยท Traffic control ยท Site staff ยท Contractor's superintendence โ€” 22 items fully built up
๐ŸŒฟ Section B โ€” Site Clearance
Strip topsoil ยท Bulk excavation ยท Tree removal ยท Import fill
๐Ÿ”๏ธ Section C โ€” Earthworks
Cut to spoil ยท Borrow pit material ยท Compaction layers ยท Subsoil drains ยท Geotextile
๐Ÿ›ฃ๏ธ Section D โ€” Roadworks
Road formation ยท Gravel wearing course ยท Layer works
๐Ÿ“ Section E โ€” Platforms
Engineered fill platforms for housing stands
๐Ÿ—๏ธ Section F โ€” Foundations
Strip and pad foundations for housing units
๐Ÿšฝ Section G โ€” Sewerage
Sewer reticulation, manholes and connections
๐Ÿ’ง Section H โ€” Water
Water reticulation, fittings and connections

๐Ÿ” What makes this RBS different:
โœ… Every rate built from MAT + LAB + PLT + CONS โ€” nothing lumped
โœ… Risk & Balance Allowance shown transparently on every item
โœ… Overheads and profit applied separately and consistently โ€” 10% + 5%
โœ… All rates benchmarked against 2025/2026 SA market pricing
โœ… Referenced to BOQ item numbers โ€” ready for tender submission
โœ… Compliant with eThekwini Municipality procurement requirements
โœ… Fully documented โ€” defensible in any contract dispute or adjudication

๐Ÿ’ก Why does a proper RBS matter on a municipal housing contract?
eThekwini, COGTA and Coega don't just want a price โ€” they want to know how you got there. A properly prepared Rate Build-Up Schedule tells the procurement officer, the engineer and the adjudicator exactly what is behind every rand you've claimed.
Without it, your variation claims get rejected. Your EOT prolongation costs have no foundation. Your final account gets disputed. ๐Ÿ˜ค
With it, you are protected from day one to final certificate. โœ…

This is the level of work I bring to every civil and municipal tender at ProQuant Construction Estimators. Working from home, servicing contractors nationally โ€” the same professional standard, without the corporate price tag. ๐Ÿ’ช
๐Ÿ“ฉ DM me for your next municipal, civil or housing tender.
๐Ÿ“ž 068 555 2435
๐Ÿ“ง [email protected]
๐Ÿ“ Durban, KZN โ€” Working remotely, servicing nationally

11/05/2026

โšก This is What a Properly Priced RFQ Looks Like.
No vague lump sums. No guesswork. No "we'll sort out the price on site."
Every item listed. Every hour costed. Every rand justified. ๐Ÿ’ช

๐Ÿ” Notice what makes this BOQ different:
โœ… Materials and labour separated clearly โ€” no hiding margin in a lump sum
โœ… Labour hours broken down per task โ€” 8hrs installation, 2hrs inspection, 3hrs commissioning
โœ… Hourly rate stated upfront โ€” R480/hr, no surprises
โœ… VSD unit prices noted as estimated market prices โ€” transparent caveat included
โœ… Every line item has a quantity, unit price and total โ€” nothing hidden
This is exactly the kind of pricing document that wins RFQs, satisfies procurement officers and protects you when the client questions your invoice. ๐Ÿ“„

๐Ÿ’ก The difference between winning and losing an RFQ is not always price โ€” it's presentation and transparency.
A procurement officer reviewing 5 quotes will always favour the one that shows its working. Yours should be that quote every single time.

๐Ÿ› ๏ธ Whether it's electrical, civil, building or mechanical โ€” if you have an RFQ to price, I'll build you a professional, itemised BOQ that gives you the best chance of winning.
๐Ÿ“ฉ DM me or drop your details below.
๐Ÿ“ž 068 555 2435
๐Ÿ“ง [email protected]
๐Ÿ“ Durban, KZN โ€” Working remotely, servicing nationally

11/05/2026

๐ŸŽจ Real Work. Real Deadlines. Real Accountability.
This is what a professional Construction Programme looks like โ€” and this is what I deliver for every client at ProQuant. ๐Ÿ’ช

๐Ÿ“‹ Project: Supply Materials, Labour and Paint
๐Ÿข Client: Ms. Alucia Ramatsa โ€” Rethabile Mmoho Trading (Pty) Ltd
๐Ÿ“ Site: Khauta West O&M Building
๐Ÿ“„ Contract Ref: RFQ/WBHOKSW-046-26
๐Ÿ“… Duration: 10 Working Days | 18 May โ€“ 29 May 2026

This programme was built activity by activity โ€” every task assigned, every responsibility named, every working day accounted for across two phases:
โš™๏ธ Phase 1 โ€” Mobilisation & Pre-Commencement
Safety file submission ยท HSE approval milestone ยท Site induction ยท Scope confirmation ยท Surface preparation ยท Welfare area establishment
๐ŸŽจ Phase 2 โ€” Painting Works
Internal walls โ€” primer, PVA coats, finishes ยท 2 painters + 1 labourer ยท Sequenced day by day to hit the 29 May completion date
๐Ÿ“Œ Special condition noted: Final internal coat applied ONLY after electrical commissioning โ€” captured directly on the programme, exactly as per the BOQ preamble.

This is the difference between a professional contractor and one who just pitches up on Monday morning hoping for the best.
โœ… Every activity has an ID
โœ… Every person has a responsibility
โœ… Every day has a task
โœ… Every milestone is tracked
โœ… Formatted and ready for client & principal agent submission
No guessing. No surprises. No disputes about who was supposed to do what and when.

๐Ÿ• Programmes like this delivered in 24โ€“48 hours.
"A project without a programme is a project planning to fail."
โ€” Ndumiso Dubazane, ProQuant Construction Estimators
๐Ÿ“ฉ DM me for a quote on your next project.
๐Ÿ“ž 068 555 2435
๐Ÿ“ง [email protected]
๐Ÿ“ Durban, KZN โ€” Working remotely, servicing nationally

04/05/2026

๐Ÿ“… Does Your Project Have a Plan โ€” or Just a Start Date?
Most contractors I speak to have a start date. A finish date. And nothing in between.
That's not a programme. That's a wish list. ๐Ÿ™
And when things go wrong โ€” a delayed delivery, a subcontractor who doesn't pitch, rain, municipal inspections โ€” a project without a proper programme falls apart fast. Delays cost money. Disputes follow. Clients lose confidence.
A Programme of Works changes everything.

๐Ÿ“‹ What ProQuant's Programme of Works includes:
โœ… Task-by-task activity schedule โ€” every trade, in sequence
โœ… Realistic durations based on actual productivity norms
โœ… Critical path identification โ€” know which delays actually matter
โœ… Resource & cash flow alignment โ€” spend money when you need to
โœ… Milestone & handover dates โ€” keep your client informed
โœ… Formatted for client & principal agent submission

โฑ๏ธ Why does it matter?
Under JBCC, GCC and NEC3 contracts, your programme is not just a planning tool โ€” it is a contractual document. Without an accepted programme:
โŒ Your EOT claims have no baseline to measure delay against
โŒ Your variation impact cannot be demonstrated
โŒ Your client can argue YOU caused the delay
A proper programme protects you before, during and after construction. ๐Ÿ’ช

๐Ÿ• Delivered in 24โ€“48 hours.
"A project without a programme is a project planning to fail."
โ€” Ndumiso Dubazane, ProQuant Construction Estimators
๐Ÿ“ฉ DM me or drop your details below for a quote.
๐Ÿ“ž 068 555 2435
๐Ÿ“ง [email protected]
๐Ÿ“ Durban, KZN โ€” Working remotely, servicing nationally

03/05/2026

You're a contractor building a **double-storey residential extension** in New Germany, Durban.

Midway through construction, the architect calls and says:

*"The client wants to change the kitchen layout, add a whirlpool bath on the first floor balcony and upgrade all windows to aluminium sliding folding doors."*

You say: *"No problem, we'll sort it out."* ๐Ÿค

You carry out the work. No written instruction. No signed variation order. No revised pricing.

Project completes. You submit your final account with an additional **R 187,000** for the variations.

The client responds:

*"We never agreed to that price. We're only paying the original contract sum."* ๐Ÿ˜ค

Does the contractor get paid for the variations โ€” and what should he have done differently?

No. In most cases, the contractor does NOT get paid** โ€” or faces a long, expensive legal battle to recover the money.

Here's why:

Under **GCC, JBCC and NEC3 contracts** โ€” the three most common standard forms used in South Africa โ€” a variation is only valid when:

โŒ It is **instructed in writing** by the principal agent or engineer
โŒ It is **priced and agreed** before the work is carried out
โŒ It is **captured on a signed Variation Order (VO)** with a revised contract value

The contractor carried out **R 187,000 of work on a verbal instruction.** Without a signed VO, the client's legal team will argue:

- The work was included in the original scope
- The price was never agreed
- No instruction was formally issued

**The contractor loses. Every time.** ๐Ÿ’ธ

---

๐Ÿ”‘ **THE LESSON:**

โœ… NEVER carry out varied work without a written instruction
โœ… ALWAYS price the variation BEFORE starting
โœ… ALWAYS get the VO signed by the principal agent AND the client
โœ… Keep a variation order register updated throughout the project

At **ProQuant Construction Estimators**, we price and document every variation order from first principles โ€” so you always have a number you can defend.

๐Ÿ“ฉ Got an unpaid VO claim? Call us before it's too late.
๐Ÿ“ž 068 555 2435 | ๐Ÿ“ง [email protected]

\

03/05/2026

You're a contractor tendering for a **proposed 8-unit residential apartment building** in Khayelitsha, Cape Town.

The developer hands you a one-page drawing and says:

*"Just give me a price โ€” ballpark is fine."*

You have **no BOQ, no specification, no trade breakdown.**

You quote **R 1,800,000** based on gut feel and past experience.

You win the tender. ๐ŸŽ‰

Construction starts. Three months in, your site foreman tells you:

โŒ The suspended first floor RC slab alone cost **R 106,000** in concrete, formwork and reinforcement.
โŒ The plumbing and drainage for 8 units came to **R 496,765.**
โŒ The masonry and brickwork hit **R 275,885.**
โŒ Roofing โ€” trusses, tiles, gutters, insulation โ€” **R 213,531.**

You're already at **R 1,092,181** and you haven't touched electrical, finishes, joinery, plastering or external works yet.

---

โ“ **THE QUESTION:**

**Where did it go wrong โ€” and how much did this contractor LOSE on this project?**

---

๐Ÿ’ฌ **DROP YOUR ANSWER BELOW** ๐Ÿ‘‡

---

โœ… **THE ANSWER:**

The fully priced BOQ for this exact project came to:

**R 2,274,286 (excl. VAT)**
**R 2,615,429 (incl. VAT)**

The contractor who quoted R 1,800,000 **lost a minimum of R 474,286 โ€” before VAT.**

That's nearly half a million rand. Gone. ๐Ÿ’ธ

**Why did it go wrong?**

Here's what a properly prepared BOQ would have revealed BEFORE tendering:

๐Ÿ“ **12 trade sections** โ€” from site clearance to external works
๐Ÿ“ **Every quantity measured** from the drawings
๐Ÿ“ **Every rate built up** from current 2026 market costs
๐Ÿ“ **No surprises** โ€” plumbing alone was R 496k, the single biggest cost driver

The contractor who said *"ballpark is fine"* didn't lose the tender.

**He lost the business.** ๐Ÿ˜”

---

๐Ÿ”‘ **THE LESSON:**

A BOQ is not a luxury. It is **financial protection.**

โœ… It tells you exactly what to build
โœ… It tells you exactly what it costs
โœ… It protects you against scope creep and variation disputes
โœ… It gives your bank, your developer and your client confidence

At **ProQuant Construction Estimators**, we price every project from first principles โ€” trade by trade, item by item, rand by rand.

๐Ÿ“ฉ Don't quote blind. Call us first.
๐Ÿ“ž 068 555 2435 | ๐Ÿ“ง [email protected]
๐Ÿ“ Durban, KZN โ€” servicing nationally

\

03/05/2026

๐Ÿ“‹ Bill of Quantities | 8-Unit Residential Apartment Development
๐Ÿ“ ERF 29973 โ€” 35 Nxanxadi Street, Khayelitsha
ProQuant Construction Estimators has just completed a full, trade-by-trade Bill of Quantities for a proposed 8-unit residential apartment building โ€” priced from first principles, every line item measured and justified. ๐Ÿ’ช

Every quantity taken off from the drawings. Every rate built up from current 2026 market costs. Every section NHBRC, SANS 10400 and OHS Act compliant. This is what a properly prepared BOQ looks like. ๐Ÿ“
Whether you're a developer, contractor, bank or investor โ€” you need numbers you can trust before a single brick is laid.
๐Ÿ“ฉ DM us for your next residential, commercial or civil project.
๐Ÿ“ž 068 555 2435 | ๐Ÿ“ง [email protected]

03/05/2026

๐Ÿ”ฆ Rate Build-Up Schedule | Liberty Coal Operations โ€“ Mpumalanga
ProQuant Construction Estimators is proud to share our latest rate build-up submission for the Provision of Lighting Plant at Liberty Coal Mine, Steve Tshwete Local Municipality, Mpumalanga.
๐Ÿ“‹ Contract: RFQ-LC-2026-LIGHT-001
๐Ÿ“ Client: Liberty Coal (Pty) Ltd
๐Ÿ‘ท Prepared by: Ndumiso Dubazane โ€“ ProQuant Construction Estimators
Every rate in this schedule was methodically built up from first principles โ€” labour, plant, materials, depreciation allowances, overheads & profit โ€” covering three key sections:
โš™๏ธ Section A โ€“ Equipment Monthly Hire
Mobile 6.5kVA Silent Generator ยท 6m Telescopic Mast ยท LED Flood Lights ยท Trailer Chassis & more
๐Ÿš› Section B โ€“ Mobilisation & Demobilisation
Transport, site commissioning, decommissioning & reinstatement
๐Ÿ‘ท Section C โ€“ Operator Day Rates
Qualified Plant Operator ยท Standby Artisan ยท HSE Officer
At ProQuant, we don't estimate โ€” we build rates. Every rand is justified, every assumption documented, every submission MHSA & SANS compliant. ๐Ÿ’ช
๐Ÿ“ฉ Need accurate rates for your next mining, civil, or construction tender? Let's talk.

03/05/2026

๐Ÿ—๏ธ Exciting project on the boards at ProQuant!
We're currently estimating this stunning two-story addition & alteration at The scope includes a proposed first floor addition with 3 bedrooms, en-suite bathrooms, a kitchenette, balconies, and a dramatic double-volume entertainment space โ€” all tied together with beautiful aluminum folding stack doors and feature glazing.
At ProQuant, we don't just crunch numbers โ€” we understand the drawings, the spec, and what it takes to bring a vision like this to life. ๐Ÿ’ช

๐Ÿ“ Accurate estimates. Every time.
๐Ÿ“ฉ DM us or call to get your next project priced properly.

04/04/2026

๐Ÿ“Š This is what a professional Rate Build-Up Schedule looks like.
Not just a number โ€” a full breakdown of every single rand.
โœ… Materials, Labour, Plant & Other costs per item
โœ… 12% Overheads & 20% Profit calculated automatically
โœ… Notes explaining the rate basis & productivity norms
โœ… Defensible in front of any engineer or client
This is real work we did for the Mamelodi X6 Phomolong Infrastructure Project โ€” a multi-million rand civil works contract. ๐Ÿ’ผ
If you're pricing a tender and need rates you can stand behind โ€” this is what you need.
๐Ÿ’ฐ Rate Build-Ups from R 200
๐Ÿ“‹ Full BOQ from R 500
โฑ๏ธ Delivered in 24โ€“48 hours
๐Ÿ“ž 068 555 2435
๐Ÿ“ง [email protected]
ProQUANT Construction Estimators โ€” Durban, KZN ๐Ÿ—๏ธ

Want your business to be the top-listed Engineering Company in Durban?
Click here to claim your Sponsored Listing.

Website

Address


Durban
4066

Opening Hours

Monday 06:00 - 17:00
Tuesday 06:00 - 17:00
Wednesday 06:00 - 17:00
Thursday 06:00 - 17:00
Friday 06:00 - 17:00