Symphony Azima AI

Symphony Azima AI

Share

Symphony IndustrialAI is the emerging leader of artificial intelligence-based monitoring, analysis,

It’s 2020. Let’s Stop Saying “IoT.” (Part II) 01/27/2020

By using sensors, cloud services, & edge computing, & by understanding the context in which these assets operate, we can shift the responsibility of decision making involved in operating these assets from people to machines.

It’s 2020. Let’s Stop Saying “IoT.” (Part II) A printer and a smart building can't both be called "IoT." It's time to refresh our IoT terminology. Part II of "It's 2020, Let's stop saying "IoT".

Google Inks Huge Corporate Solar-Plus-Storage Deal in Nevada 01/26/2020

“Corporations have long used wind or solar to go ‘100 percent green,’ but there is a new effort to actually time-match consumption rather than just buying an offsetting amount of kilowatt-hours,” said Finn-Foley. http://ow.ly/Xf8750xXks2?

Google Inks Huge Corporate Solar-Plus-Storage Deal in Nevada Google and Nevada utility NV Energy have joined up on an energy supply agreement to power an under-construction data center outside Las Vegas, with future capacity that rivals the largest corporate solar power purchase agreement so far announced in the U.S.

It’s 2020. Let’s Stop Saying “IoT.” (Part II) 01/25/2020

Now we understand this world of connected assets a bit differently. The ability to capture & send the data is moving from being a novelty to being commoditized. Today IoT's significant benefit is the data, not the sensors.

It’s 2020. Let’s Stop Saying “IoT.” (Part II) A printer and a smart building can't both be called "IoT." It's time to refresh our IoT terminology. Part II of "It's 2020, Let's stop saying "IoT".

Germany shuts nuclear plant as it phases out atomic energy 01/25/2020

Under Germany's “energy transition” plan, the country aims to replace fossil fuels with renewable energy sources over the coming decades. The government agreed earlier this year to stop producing electricity from coal-fired plants by 2038 at the latest.

Germany shuts nuclear plant as it phases out atomic energy Germany is shutting down one of its seven remaining nuclear power plants as part of a planned phase-out of atomic energy production by the end of 2022.

It’s 2020. Let’s Stop Saying “IoT.” (Part I) 01/25/2020

For such instances in which we need to create a complete loop & control an asset, work offline, or can only afford very low latency, Edge Computing devices come into play. Such devices go beyond being simple data sensing, collecting, & sending mechanisms.

It’s 2020. Let’s Stop Saying “IoT.” (Part I) From telemetry to edge computing, is IoT still a thing?

Google Inks Huge Corporate Solar-Plus-Storage Deal in Nevada 01/24/2020

Google & Nevada utility NV Energy have joined up on an energy supply agreement to power an under-construction data center outside Las Vegas, with capacity that rivals the largest corporate solar power-purchase agreement announced to date in the U.S.
http://ow.ly/vdPZ50xXkfI?

Google Inks Huge Corporate Solar-Plus-Storage Deal in Nevada Google and Nevada utility NV Energy have joined up on an energy supply agreement to power an under-construction data center outside Las Vegas, with future capacity that rivals the largest corporate solar power purchase agreement so far announced in the U.S.

2019’s Solar Top Ten 01/24/2020

Solar and Batteries start to replace gas plants: The local utility in Glendale, California backed off a proposed $500 million gas plant and instead proposed using batteries.

2019’s Solar Top Ten Last year I wrote that I was a climate optimist. Confronted by another year of droughts, floods, and wildfires, it can be difficult to maintain this optimism, but in 2019, our industry deployed renewables faster than anyone anticipated.

Germany shuts nuclear plant as it phases out atomic energy 01/24/2020

https://www.foxbusiness.com/markets/germany-shuts-nuclear-plant-as-it-phases-out-atomic-energy

Germany shuts nuclear plant as it phases out atomic energy Germany is shutting down one of its seven remaining nuclear power plants as part of a planned phase-out of atomic energy production by the end of 2022.

It’s 2020. Let’s Stop Saying “IoT.” (Part I) 01/23/2020

The dry definition of "Sensors and actuators embedded in physical objects that are linked through wired and wireless networks" doesn't quite capture the potential of IoT.

It’s 2020. Let’s Stop Saying “IoT.” (Part I) From telemetry to edge computing, is IoT still a thing?

How The U.S. Navy Remains The Masters Of Modular Nuclear Reactors 01/23/2020

The U.S. Navy has been operating and perfecting SMRs for 75 years. In 1955, the first nuclear-powered submarine, the USS Nautilus, put to sea. By 1962, the U.S. Navy had 26 operational nuclear-powered submarines with 30 more under construction.

How The U.S. Navy Remains The Masters Of Modular Nuclear Reactors America’s Nuclear Navy is one of the oldest and largest nuclear organizations in the world, and has the world’s best safety record of any industry of any kind. There are over a hundred nuclear reactors, which are actually small modular reactors, that power 86 submarines and aircraft carriers.

Xconomy: DTx Pharma Raises $10.6M to Advance New Way to Deliver RNA Drugs 01/22/2020

The startup aims to improve upon existing delivery systems for drugs that target RNA, which could allow the medicines to be more widely circulated and more easily pe*****te tissues and organs.

Xconomy: DTx Pharma Raises $10.6M to Advance New Way to Deliver RNA Drugs RNA medicines can treat some diseases by hitting targets otherwise considered “undruggable” by small molecules and biologics, but protecting the nucleic

Want your business to be the top-listed Computer & Electronics Service in Woburn?
Click here to claim your Sponsored Listing.

Telephone

Address


Woburn, MA

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm