TES Rentals
T.E.S. Rentals sets a new standard in equipment rental with reliable machines, our Up-Time Guarantee, and a focus on customer success.
Contractors, land pros, and homeowners across North Florida trust us to deliver equipment that keeps projects moving.
06/12/2026
The machine that fits the job can still sink the access path.
June in North Florida means rain.
The site might be ready. The access path might not.
Wet clay holds water long after the rain stops.
Right-sized equipment can still struggle with site access. Getting on and off the property is its own problem..
Deep ruts.
That's the part most people don't think about until delivery day.
Before you schedule, walk the full path. Not just the work area.
Consider how many passes that path will take. Delivery, pickup, and any repositioning during the job.
Each pass on saturated ground adds risk.
Machine weight is a factor before the first bucket goes in the ground.
If the path looks soft, it probably is.
This is worth thinking through before you call, not after the truck shows up.
Save this for when you're planning your next delivery during rainy season.
06/11/2026
Some jobs are too deep for a mini. Not deep enough to justify a full-size machine.
That's the gap the John Deere 50G fills.
Footers. Deep drainage. Stump removal. Pond work.
Jobs where a smaller excavator runs out of reach before you run out of work.
The 50G digs to 11 feet 7 inches. Reach stretches to 20 feet 6 inches.
That's a different category of capability.
Zero tail swing keeps the machine working in tighter conditions without sacrificing digging force.
Bucket digging force comes in at 8,267 lbs.
Still compact.
But built for real depth.
If you're deciding between machine classes, the job scope should drive the decision. Not the daily rate.
Undersize the machine and the job takes longer. Sometimes a lot longer.
Not sure if the 50G is the right fit? Call us and tell us what you're working on.
Call us at (904) 452-0888. We'll help you figure out the right machine before you commit.
06/10/2026
June in North Florida doesn't give you much margin.
Rain rolls through on its own schedule.
When it clears, the window to work ground opens fast.
Contractors and property owners in Bradford, Union, and Clay counties know this rhythm.
You plan around the weather, not against it.
Dry window opens.
The job either moves or it doesn't.
That's where equipment availability matters.
A machine that's maintained and ready when the window opens is different from one that isn't.
We keep our equipment serviced and available so your dry days don't get eaten up waiting.
North Florida's building season doesn't pause for logistics.
What are you working on this summer? Drop a comment and tell us where you're at.
06/09/2026
Not every job has room for a wide swing.
Most excavators swing the counterweight wide when they rotate.
On an open site, that's fine.
Within feet of a fence, wall, or utility line, it becomes a problem.
The John Deere 50G is zero tail swing.
When it rotates, the rear of the machine stays within its own footprint.
Perfect for tight access.
It changes what you can safely do on a constrained site.
Think about residential footers near a property line.
Trenching beside an existing structure.
Excavating close to a retaining wall.
On those jobs, a conventional machine may not fit the swing radius you actually have.
Zero tail swing wins.
The 50G also carries real dig depth and reach for its size.
It's not a compromise machine.
It's the right machine when the site demands it.
Before you rent, walk your site and note what's within ten feet of your work zone.
That one check changes which machine you should be calling about.
Working a tight site soon? Drop a comment and tell us what you're up against.
06/08/2026
That stump isn't going away on its own.
Tree removal leaves the hard part behind. The stump.
Old stumps are tripping hazards and mowing obstacles. They make your yard look bad..
Manual removal is slow work.
Grinding is faster and cleaner.
The Barreto 37SG runs 37 HP and weighs 1,900 lbs.
Compact enough for most residential backyards.
Fits through standard gate openings.
If a tree just came down on your property, the stump doesn't have to wait.
Call us at . Tell us where the stump is. We'll help you figure out the right fit.
06/07/2026
Digging near an existing structure changes everything about machine selection.
A standard excavator swings wide on a tight job.
That tail swing can put you into a wall, a footer, or a fence line.
The ZX135 runs reduced tail swing.
You get full digging force without the clearance problem.
Close quarters.
23,380 lb bucket digging force. 19 ft 11 in of dig depth. 28 ft 7 in of reach.
That is a serious machine for serious footer and utility work.
Hydraulic thumb and backfill blade are included.
No upsizing to get the right setup.
If you are working tight to a building, the machine has to fit the constraint.
Not the other way around.
Tell us what you are working on. Call (904) 452-0888 and we will help you confirm the right machine before you schedule.
06/06/2026
Joe left a 5-star review that's worth reading in full.
He rented a John Deere 317G to root rake and rough grade a new lot.
He had questions about machine fit and attachments before the job started.
Zeb worked through it with him.
Right machine.
Right attachments.
Drop-off was on time. Zeb walked him through operation before leaving.
Joe called our gear the cleanest he had ever rented. That is the standard we hold every rental to..
Clean equipment. Correct fit. No surprises on the job.
Working on a grading or land clearing project? Drop a comment and tell us what you're tackling.
05/30/2026
Choose your mini excavator size based on your job scope, not just the daily rate
Most mini excavator budget overages happen because of unforeseen delays. Not equipment selection mistakes.
We spend time upfront making sure the right machine shows up. The real cost drivers are things like discovering unmarked utilities or hitting unexpected clay layers.
A one day drainage project turns into three days. Material shortages delay the timeline. Underground cables require careful work around them.
When customers call frustrated about costs, it's rarely the machine choice. It's usually project complications they couldn't predict.
Plan extra time in your budget. Most excavation projects take longer than expected.
What unexpected challenges have you run into on dig projects?
Click here to claim your Sponsored Listing.
Category
Contact the hotel
Telephone
Website
Address
2000 N Temple Avenue
Starke, FL
Opening Hours
| Monday | 7:30am - 5pm |
| Tuesday | 7:30am - 5pm |
| Wednesday | 7:30am - 5pm |
| Thursday | 7:30am - 5pm |
| Friday | 7:30am - 5pm |