Valentine Corporation is a diversified general engineering contractor, specializing in a wide range of infrastructure construction projects and FRP.

Photos from Valentine Corporation's post 06/05/2026

Posting some phase I bridge abutment torque down pile driving (or screwing) progress photos of the Bermuda Drive bridge replacement for the City of San Mateo. Yes, heavy walled 18” steel pipe piles torsionally screwed into the earth with amazing hydraulic equipment courtesy of specialty subcontractor, Foundation Constructors.
Structure concrete abutment and bridge concrete on deck for this summer!

Photos from Valentine Corporation's post 06/05/2026

Some pictures of Valentine Corporation working for CalTrans on golden Tower Bridge over the Sacramento River in downtown Sacramento. This is an “unusual and difficult “ project to remove and replace traveling electrical cables, perform sheave modifications and replace electrical appurtenances for the lift span of the bridge….your tax dollars hard at work (in high places) 💪🦺

Photos from Valentine Corporation's post 05/04/2026

Valentine Corporation has been busy with the Bermuda Drive bridge replacement project, a tight access complicated job for the City of San Mateo.!
Picture dump of sheet pile abutment shoring, aquadam cofferdam (think giant water balloon dams) ,channel bypass piping installation, and load testing of torque down bridge piling 💪

Photos from Valentine Corporation's post 07/17/2025

Valentine Corporation, busy in Napa County!

Photos of two different retaining wall slide correction projects for CallTrans on Highways 128 and 121 🚧 🦺

Photos from Valentine Corporation's post 02/10/2024

Photo dump from a full week’s worth of emergency work for The County of Marin to re-open Panoramic Highway on Mt. Tam after the 2/4/24 cyclonic storm.
My hat is off to to the Valentine team that bust their butts make it happen 🎩 👏

Photos from Valentine Corporation's post 01/30/2024

More unique and difficult construction challenges for the Valentine team — Berth 2 hydraulic cylinder replacements for the Golden Gate Bridge District, Larkspur Ferry Terminal 🏗️

Photos from Valentine Corporation's post 01/30/2024

Sharing some photos of Valentine crew that is hard at work in our home town — Southern Heights Retaining Walls, City of San Rafael 💪

03/02/2023

Valentine crew setting soldier piling for secant wall construction 🏗️
Emergency slide repairs for CalTrans, Highway 128 near Maacama Creek, Sonoma County

Photos from Valentine Corporation's post 10/21/2022

Valentine crew hard at work on the underground portion of new booster pump station construction for the City of Tracy, John Jones Water Treatment Plant 🏗 🦺 💪🏻

Photos from Valentine Corporation's post 04/29/2022

Project: City of Fairfield, Nelson Hill Reservoir

This is where your drinking water would normally be stored . Sharing Photos of Valentine crew busy installing a manifold mixing system inside the underground reservoir, and replacing the 30” & 36” inlet and outlet valve works for the tanks.

Your tax dollars, hard at work 💪🏻

Want your business to be the top-listed Engineering Company in San Rafael?
Click here to claim your Sponsored Listing.

Telephone

Address


111 Pelican Way
San Rafael, CA
94901

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm