Valde Pavement Solutions LLC
Be proud of your parking lot.
This Memorial Day, we pause to remember and honor the courageous men and women who gave their lives in service to our nation.
We thank God for their sacrifice and are grateful for the freedoms they protected.
05/11/2026
π§π§NOW HIRING: Dump Truck Driver
We are looking for candidates with at least 5 years of experience who are reliable and take pride in getting the job done safely!
To apply, please send your resume to [email protected].
04/24/2026
Weβre proud to have been part of this project in Brandon.
Our team at Valde Pavement Solutions completed the sidewalk improvements and handrail installations to help enhance accessibility and safety in the area.
Thank you to Brandon Main Street Association for sharing this update β we appreciate the opportunity to contribute to projects that support and improve our local communities.
Itβs the little things that make a big difference! The new railing is up along the improved sidewalk outside Waggoner Engineering and Burgers Blues Barbecue - Brandon, and itβs already elevating both safety and style downtown.
More to come on the other side, plus additional pedestrian safety improvements ahead. Thank you City of Brandon, Miss. for continuing to invest in a downtown that families can enjoy with confidence!
04/10/2026
We are continuing to add to our team!
If you or someone you know may be interested in joining our growing crew, we'd love to hear from you!
To apply, please send your resume to [email protected].
04/05/2026
He is risen.
04/03/2026
π§ Now Hiring: Field Support Technician
β£
Valde Pavement Solutions is seeking a dependable, motivated individual to join our team. This position offers the opportunity to work on a variety of projects while developing valuable, hands-on experience in the industry.
β£
To apply, email your resume to [email protected].
πΆπΎβππΎ πΌπππΎππΎπ½ πππΊπ πππππ ππ
πΊπππππ ππ πΊππ½ πππΎ π½ππΏπΏπΎππΎππ ππππΎπ ππΏ ππππππβπππ ππ π―πΊππ π₯, ππΎβππΎ π»ππΎπΊππππ π½πππ πππΊπ ππΊπππΎππ πππΎπ ππβπ πππ π½πππΎ πΌππππΎπΌππ
π.
β£
πΆππΎπ πππππ ππ
πΊπππππ ππ ππππππΎπ½, πΌπππΌππΎππΎ π½πΎπΌππ½πΎπ πΏππ ππππΎπ
πΏ...πΊππ½ πΌπππΌππΎππΎ ππ πππ ππππΊππΎπππΌ.
β£
π’πππππ πΏπΊππ
πππΎπ ππΎ ππΎπΎ πππΎπ ππππππ πΊππΎπβπ πππππΎππ
π ππ
πΊπππΎπ½:
β£
β
π±πΊππ½ππ πΌππΊπΌππππ πΊπΌππππ ππΊππΎπ
π
β
π’ππππΎπ π»ππΎπΊππ
β
π²ππΊπ
π
πππ (πΎπ½ππΎπ πΌπππππππ πΊππΊπ)
β
π΄ππΎππΎπ ππ
πΊπ»π πΏπππ ππππ
ππππΎππΎππ
β
πΆπΊππΎπ πππππππππ πππΊπ πΊπΌπΌπΎπ
πΎππΊππΎπ π½πΊππΊππΎ
β£
πΆπππ πΎπππΊπππππΎ πΈπΊπππ πΌπ
πΊπ πΊπ πππ π¬ππππππππππ ππππ
, πππΎ ππππ πππΌππΎπΊππΎπ π½ππΊππΊπππΌπΊπ
π
π.
β£
π³ππΎ ππππ
ππππΎπ.
π³ππΎ ππ
πΊπ» ππΎπΊπΌππ.
β£
πΆππππππ πππππΎπ ππππππππ, πΏπΊππ
πππΎ ππΊπππΎππ πΏπΊπππΎπ πππΊπ ππππ πππππΎπππ ππππΎππ πΎπππΎπΌπ.
β£
π³ππΎ π΅πΊπ
π½πΎ π―πΊππΎππΎππ ππΎπΊπ πΊπππππΊπΌππΎπ πΎππΎππ πππππΎπΌπ ππππ πΊ πΏππΌππ ππ ππ
πΊπππππ πΏππππ β π»πΎπΌπΊπππΎ πππΊπ ππΊπππΎππ π»πΎπΏπππΎ πππΎ ππππ ππ πππΊπ π½πΎππΎπππππΎπ π
πππ-ππΎππ ππΎππΏππππΊππΌπΎ.
π»ππππ πππππ ππ ππππ ππππππππ? π»πππβππ πππ ππππππππ. π»πππβππ ππππππππ.
β£
There are several types of joints used in concrete paving:
β£
β
Control Joints β Guide where cracks will form
β
Expansion Joints β Allow room for movement
β
Construction Joints β Connect separate pours
β
Isolation Joints β Separate pavement from structures
β£
Each one serves a purpose.
β£
In areas like Mississippi β especially with Yazoo clay β choosing the right type of joint and placing it correctly can mean the difference between pavement that lastsβ¦ and pavement that fails early.
β£
Good paving isnβt just about pouring concrete.
Itβs about planning for movement before it ever happens.
03/04/2026
Concrete cracks. That's a fact.
The real question is: Does it crack where it's supposed to?
β£
At Valde Pavement Solutions, we don't just pour concrete - we plan it.
β£
Joint planning is the intentional design of where concrete will crack as it cures and moves. Without it, concrete will crack randomly, leading to premature damage, trip hazards, and costly repairs.
β£
Here in Mississippi, this matters even more.
β£
Our region is known for Yazoo clay β a highly expansive soil that swells when wet and shrinks during dry spells. That constant movement puts stress on pavement.
β£
If joints arenβt planned correctly, the ground movement can cause:
β’ Random cracking
β’ Corner breaks
β’ Separation
β’ Surface failure
β£
Proper joint planning controls the movement β instead of letting the movement control the pavement.
β£
And thatβs the kind of thinking we bring to every job.
02/23/2026
This would be a great opportunity for a recent high school graduate looking for a career path.
Weβre proud to provide professional tree care services across Mississippi, helping homeowners and property owners with safe, reliable tree removal, pruning, and cleanup. Our focus has always been on doing quality work, operating safely, and building lasting relationships with our customers.
As we continue to expand, weβre currently hiring a Tree Care Apprentice to join our team.
This full-time, entry-level position is a great opportunity for someone who enjoys working outdoors, takes pride in their work, and wants to learn a skilled trade with long-term career potential.
If youβre interested β or know someone who would be a great fit β please contact us!
Click here to claim your Sponsored Listing.
Contact the business
Telephone
Website
Address
PO Box 187
Madison, MS
39130
Opening Hours
| Monday | 7:30am - 4:30pm |
| Tuesday | 7:30am - 4:30pm |
| Wednesday | 7:30am - 4:30pm |
| Thursday | 7:30am - 4:30pm |
| Friday | 7:30am - 4:30pm |