Sunmount Paving

Sunmount Paving

Share

Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Sunmount Paving, Contractor, 11801 Harmonson Road, Justin, TX.

Sunmount Paving is a leading civil construction and roadway paving company, proudly serving North Central Texas through the construction and maintenance of highways, airports, raceways, and transport infrastructure.

Photos from Sunmount Paving's post 06/09/2026

Last week, Sunmount brought together our paving and mechanical crews for a hands-on overview of our new CAT AP1055 Paver with support from the CAT representative.

The team had the opportunity to learn about the machine, test its features, and complete some trial paving before we begin production work. The excitement was evident as everyone wanted a chance to operate the new equipment.

Thank you to everyone who participated and helped make the training a success. We are excited to put our newest addition to work and continue delivering quality projects safely and efficiently. 🚧🚜👷‍♂️

06/05/2026

Join us in congratulating our team members who are celebrating anniversaries in June! Thank you for all of your hard work and dedication.

Congratulations:

[45 years]
John Rauer Jr.

Photos from Sunmount Paving's post 06/02/2026

We’re at SkillsUSA 2026! Come see us at booth 519 building B! Grab a pin and try out our simulator!

05/25/2026

Today, we remember and honor the heroes who gave their lives in service to our country. Their sacrifice will never be forgotten.

From all of us at VINCI Construction USA, we wish everyone a safe and meaningful Memorial Day.

05/14/2026

Our Justin office is wearing their GREEN in support of Mental Health Awareness Month!

Proud to wear green in support of mental health 💚 Let’s keep showing up for each other.

Photos from Sunmount Paving's post 05/01/2026

On Saturday, April 25, 2026, we gathered at Cedar Hill State Park for our annual Hike for Hope, bringing together 107 participants across 10 teams for a day centered on connection and purpose. The group completed a two-mile hike along the shoreline of Joe Pool Lake, taking in the scenery while supporting a meaningful cause. The event was made possible by the efforts of our Sunmount ELN team, who volunteered their time to organize and set up, ensuring a smooth and successful experience for everyone involved.

Following the hike, participants enjoyed a BBQ lunch and spent time connecting through activities like co****le and lawn Jenga. The energy throughout the day reflected the strength of our team and community, and the impact was significant—raising over $50,000 in support of the cause. Events like this continue to show what can be accomplished when people come together with a shared commitment to make a difference.

Photos from Sunmount Paving's post 04/23/2026

From packaging to pallet and wrapped up tight đź’Ş
Every batch of EZ Street Asphalt is prepped with care and ready to head out to our awesome customers.
Thanks for trusting us to deliver!

Photos from Sunmount Paving's post 04/21/2026

**VINCI Construction USA Regional Winners**

🚀 Innovation in action. Meet our VINCI Construction USA Regional Winners—driving smarter, safer, and more efficient ways to build.

👏 Joshua Briggs- Sunmount TX Paving

đź”§ After a 2024 incident in which asphalt was mistakenly discharged onto a truck cab due to a sensor misread at the loading bay, Sunmount Paving implemented a safer solution. Partnering with Stansteel, the team installed the Look, Lock & Load AI vision system, which only allows unloading when a truck bed is correctly positioned and safely identified, preventing similar incidents and equipment damage.

👏 Mike Perez- TPC

🔧This project reduced energy consumption and CO₂ emissions at two asphalt plants by transitioning from hot mix to warm mix asphalt production. In 2023, 260,872 tons of warm mix were produced at the Tampa and Lakeland plants, lowering target temperatures by 45°F and resulting in measurable reductions in energy use, fuel consumption, and emissions. The lower temperatures also significantly reduced fumes and visible emissions at both the plant and jobsite, improving working conditions while advancing long-term environmental performance goals.

This week, we will introduce all of our USA innovation award winners who will advance to be voted on at the Americas Oceania Conference on May 7th.

04/20/2026

đźš§ National Work Zone Awareness Week 2026 đźš§
This week, we recognize the men and women working in roadway construction zones—dedicated to keeping our infrastructure moving forward.

The 2026 theme, “Safe Actions Save Lives,” is a powerful reminder that the choices we make behind the wheel matter.

Slow down. Stay alert. Put the phone away.

Because every safe action helps ensure everyone gets home. đź’›

04/10/2026

The Road To Success Scholarship Program is now open for applications. Eligible dependent children or grandchildren (age 26 and under) of full‑time employees can receive a $500 renewable scholarship for undergraduate or vocational study.

📌Deadline: May 5, 2026 — 3:00 PM CT

📌Eligibility: 3.0 GPA, full‑time study, employee with 2+ years of service

📌Awards: 6 total — 2 each for Blythe (NC), Hubbard (FL), and Eurovia Atlantic Coast

For complete eligibility details, required documents, and the application link, please visit the scholarship page: https://loom.ly/6rA7s8k

Apply now to support your student’s future!

Want your business to be the top-listed Contractor in Justin?
Click here to claim your Sponsored Listing.

Category

Address


11801 Harmonson Road
Justin, TX
76247

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm