Utron
Utron is a turn-key provider of automated parking solutions, with over 30 years of experience.
Unitronics automated parking solutions allows you to maximize parking revenue by providing excellent automated parking solutions in a turn-key approach, from system design, through installation and integration, to continuous maintenance and service.
09/28/2026
"What's your cost per space?" It is the first question we get about puzzle parking. It is also the wrong one.
Cost per space is an output, not an input. It falls out of 5 configuration decisions your architect makes at schematic design, long before anyone quotes a component.
Each one is fixed on a drawing months before a vendor is contacted. Each one is far cheaper to change at schematic than at construction documents.
The 5 decisions, the costs that never appear in an equipment quote, and how to compare supplier bids. Link in first comment.
Automation isn't about adding one smart machine.
It's about making the entire process work together.
In a hashtag environment, that can mean mechanical equipment, sensors, software, kiosks, mobile interfaces and service working as one system.
In a hashtag , it can mean AS/RS, conveyors, AMRs, sortation, controls and WMS connectivity working together.
The technology matters. But integration matters just as much.
When everything works together, you get fewer handoffs, smoother workflows, better visibility and a system that's easier to operate and scale.
That's the real value of automation: not more technology, but less friction.
What do a parking garage and a warehouse have in common?
Both need to:
✅ move efficiently
✅ use limited space
✅ retrieve the right item at the right time
✅ operate reliably
✅ coordinate mechanical + software systems
Different objects.
Surprisingly similar problems.
09/15/2026
We’re all about automation - and always have been.
09/07/2026
Happy Labor Day!
Today, we’re celebrating the people who turn plans into places.
✏️ The architects who imagine how people will experience a building before the first line is drawn.
🏢 The developers who balance vision, investment, and the realities of making a project work.
🏗️ The general contractors and construction teams who bring those plans to life, solving problems, coordinating countless details, and keeping projects moving.
🚙 And the Utron team-the engineers, designers, project managers, technicians, sales and support teams who work every day to make parking smarter, more efficient, and possible where space is limited.
Every successful project is the result of people working together.
09/03/2026
Arrival is where hospitality projects either work or create friction. Valet stacking in a porte cochere. Guests circling a ramp with luggage still in the car. A garage occupying ground floor frontage that could have been a restaurant.
Automated parking changes the arrival sequence.
The guest pulls into a bay room at grade. Leaves the car. Walks into the lobby. Retrieval is requested from the front desk, an app, or a kiosk, and the vehicle returns to the same bay.
Valet operations still function. They require less floor area to run, because attendants are not driving vehicles through levels of a garage.
For the design team, the effect shows up on the plan.
Ramps and drive aisles come out.
Circulation area drops.
Ground floor frontage stays available for revenue-generating program.
On constrained urban sites, parking is one of the few line items where footprint and arrival experience are addressed by the same decision.
08/24/2026
Our Puzzle parking online planner lets you configure a system layout and instantly see capacity and dimensions.
You input site parameters. The tool shows feasibility. You validate fit-and-function on your own schedule. No consultant meetings. No back-and-forth iterations.
For early feasibility studies. For schematic design decisions. For anyone who wants to test Puzzle fit before formal design engagement.
Test-and-validate on your timeline (link in first comment).
08/17/2026
One of the most expensive parking decisions can be made before the parking garage is even designed: Choosing the parking strategy too late.
By then, the project may already be built around a structural grid, ramps, circulation, MEP and other parking constraints.
At that point, parking isn't helping shape the design.
It's trying to fit into it.
The better approach is to ask early:
1️⃣ How much parking is actually needed?
2️⃣ When will demand peak?
3️⃣ How much space will circulation consume?
4️⃣ And what could the project gain if parking occupied less space?
Because the right parking strategy isn't just about storing cars.
It can change what you can do with the building.
How early does parking enter your design process?
hashtag hashtag hashtag hashtag hashtag
08/13/2026
Mixed-use parking is rarely a “one-size-fits-all” problem.
An office component may create a sharp morning peak as tenants arrive.
Retail brings variable occupancy and transient users throughout the day.
Different tenants may have completely different parking patterns - from predictable morning routines to irregular visits, short-term parking, and evening demand.
So the challenge isn’t simply: “How many parking spaces do we need?”
It’s: “How will different users actually use those spaces - and when?”
Parking design should start with understanding the building’s users and their patterns - not just counting spaces.
For architects and developers, that means considering:
• Peak arrival and departure periods
• Different tenant parking behaviors
• Transient vs. long-term users
• Entry, exit and queuing requirements
• Available building volume and footprint
• How parking impacts valuable retail, office or residential space
The right parking design can do more than satisfy a code requirement.
It can help make the entire mixed-use project work better.
08/10/2026
Retrofitting a parking system into an occupied building means coordinating around existing tenants. Loading zones. Lobby access. Utility routing. Revenue-generating ground floor operations.
Phases are planned to minimize disruption. Utilities are rerouted ahead of system installation. Loading access is maintained. Ground floor operations stay online.
Retrofit isn't demolition followed by new construction. It's surgical integration into an operating building.
Read how we successfully retrofitted The UCLA Medical Center (link in first comment).
Click here to claim your Sponsored Listing.
Telephone
Website
Address
401 Hackensack Avenue
Hackensack, NJ
07601