Richardson Ridge Construction
Richardson Ridge Construction LLC
A little stone in the crawl space and we’re finished up with new foundation until it’s framed.
About finished up with this one, warmer temps have been a plus!
12/11/2025
Also got a sanitary point repair and water leak in as well as the waterline for the new construction were on. Weather permitting we’ll get finished up by Xmas 🎄
Derek’s about got the walls set to pour next week
11/20/2025
3 BR Presby repair field install on a pump system.
11/20/2025
Excavated and waterproofed the foundation along with a new perimeter drain
11/20/2025
3 BR Presby butterfly system for a new construction
11/20/2025
Foundation digout for footer and crawlspace
11/20/2025
Two BR Presby going in. Sometimes we have to go with a poly tank due to limited access.
11/20/2025
Extended a Presby system from a 3 to a 4 BR
11/20/2025
Cleaned up this property by removing an old garage, grading, installing two stone pads and a sewer hookup for an RV.
06/18/2025
Got this new perimeter drain in and the basement sealed up last week. The weather was not cooperative, with a total of 6 inches over the course of a couple of weeks, but we still got it done in a timely manner.
Click here to claim your Sponsored Listing.
Category
Telephone
Website
Address
8822 W Elwren Road
Bloomington, IN
47403
Opening Hours
| Monday | 7am - 7pm |
| Tuesday | 7am - 7pm |
| Wednesday | 7am - 7pm |
| Thursday | 7am - 7pm |
| Friday | 7am - 7pm |
| Saturday | 7am - 7pm |