Atara, our brand new development offers ultra modern living spaces, with breathtaking ocean views.
02/07/2026
Final preparations are underway at Villa B5, with lighting tests being carried out to ensure all systems are functioning correctly.
The kitchen is scheduled for installation next week, marking one of the final stages before handover. We’re looking forward to completing the remaining finishing touches and handing over another high-quality home.🏡😁🔑
26/06/2026
Progress continues well on Kala Kiri villa project. We’ve recently completed a series of fascia and eaves design upgrades, creating a cleaner, more contemporary appearance while still maintaining the traditional architectural character of the home.
The lighter, modern colour palette has given the villa a fresh new look and significantly enhanced its overall street appeal.
Alongside these improvements, we’re continuing with the internal and external finishing works as we move closer to completion. ✅👷🏽♂️👌🏼🏡
11/06/2026
Villa B5 is almost ready for handover, with only the final finishing touches and quality checks remaining.
Everything is coming together well, and the villa is looking great. 🏡👷🏽♂️✅
08/06/2026
Villa A2 has now been successfully handed over to the client. We’re delighted with the finished result, and most importantly, the client is extremely happy with their new villa. Thank you to everyone involved for helping make the project a success. 🔑 🏡 🌴 😎
12/05/2026
Maenam villa project is now back on track after a brief pause, with strong progress continuing across all areas. 📋✅😎🌴☀️
Current works include finishing details, eaves and soffits installation, air conditioning works, skim coating, and painting as the project moves closer towards completion. 👷🏽♂️🔨🧱
25/04/2026
One Bophut project continues to progress well, with the swimming pool and surrounding terraces now complete, including the new concrete structure and sandwash floor beautifully finished.
Villa 3, the formation of new door and window openings has been successfully completed, and works are now moving into the next phase, including ceiling installation, skim coating, undercoat preparation, and tiling works.👷🏽♂️🧰🪚🛠️
16/03/2026
Villa 9–10 at One Bophut are progressing well, with the main interior works now largely complete. The feature floating staircase with glass balustrades has been installed, while flooring, wall finishes, and kitchen cabinetry are now in place. The villas are moving into the final stage of lighting, fittings, and finishing details ahead of handover. 👌🏼🔑🏠
25/02/2026
One Bophut is progressing strongly, with Villas 9–10 now nearing handover.
The pool terrace structure has been completed, and works are moving forward onto the surrounding pathways as we enter the final stages.
Meanwhile, progress continues steadily on Villas 7–8, bringing the overall project closer to completion with each milestone achieved. ✅📋👷🏽♂️
25/02/2026
Atara B5 is progressing well, with installation of the glass balustrades now underway, enhancing both the safety and the clean, modern aesthetic of the design.
At the same time, final stages of the swimming pool works are being completed.
The villa is steadily moving closer to completion as these key detailing elements come together.🌴😎🔑🏠
21/02/2026
Atara A2– Final phase of rockwork installation, beng completed 🪨 😎 🏡