FK General Technology
We are a technology company involves in supply and installation of general electrical and IT systems
21/02/2025
๐ ๐ฃ๐ผ๐๐ฒ๐ฟ๐ถ๐ป๐ด ๐ฆ๐๐๐๐ฎ๐ถ๐ป๐ฎ๐ฏ๐ถ๐น๐ถ๐๐ ๐ฎ๐ ๐๐พ๐๐ฎ๐ป๐ฎ ๐๐ฎ๐ฐ๐๐ผ๐ฟ๐! โ๏ธโก
Weโve installed a 498kWp hybrid solar system at Aquana Water & Beverages Factory, integrating solar, battery storage, and diesel generators for efficiency, reliability, and sustainability. A step towards a cleaner, greener future! ๐
Installation of hybrid solar system by FK General Technology ๐ฃ๐ฟ๐ผ๐ท๐ฒ๐ฐ๐ ๐ข๐๐ฒ๐ฟ๐๐ถ๐ฒ๐This project represents a milestone in sustainable energy integration, combining solar power with advanced hybrid technology t...
28/12/2023
Check out our solar project in our YouTube channel ๐๐๐
54 Kw power with 40kwh storage solar project by FK General Technology Project detailsolar panels 108*500W = 54kwBattery capacity = 10kwh*4 = 40kwhInverter power = 4*12kw = 48kw
24/08/2023
2020 Refurbished Lenovo ThinkPad T460
โ
14 Inch Full HD 1080p
โ
Core i5-6300U up to 3.0GHz
โ
RAM 16GB DDR3, Storage 512GB SSD
โ
Graphics Intel HD 520
โ
FP Reader, Wi-Fi, HDMI
โ
Windows 10 Pro
only $350
24/08/2023
Cargo lift (elevator) installation by FK General Technology. For similar projects such as cargo lift or passenger lift don't hesitate to contact us through our WhatsApp or tele 0924 965 858 / +211980305981
12/01/2023
Installation of 40kw solar panels with storage of 144kwh LifePO4 batteries. The project is completed on Jan 5 2023 in partnership with Solarka energy (solarikaenergy.com).
22/10/2022
Installation of 10kw solar panels with storage of 48kwh gel batteries at wau teaching hospital. The project is completed on 19/10/2022 in partnership with Solarka energy (solarikaenergy.com).
22/10/2022
Installation of 2.4kw solar panels and 1.4kw Submersible pump with automatic level control using floater switch at wau teaching hospital. The project is done on 10/17/2022 in partnership with Solarka energy (solarikaenergy.com)
22/10/2022
Rewiring of Direct online (DOL) starter for 5kw 3 phase compressor done on 9/27/2022.
22/10/2022
Installation of 100 kw 3 phase motor for water treatment done on 5/2/2022
22/10/2022
Fire detection and suppression system in SCADA room solar power plant installed on 8/19/2022
Click here to claim your Sponsored Listing.
Category
Website
Address
Juba
Opening Hours
| Monday | 09:00 - 17:00 |
| Tuesday | 09:00 - 17:00 |
| Wednesday | 09:00 - 17:00 |
| Thursday | 09:00 - 17:00 |
| Friday | 09:00 - 17:00 |
| Saturday | 09:00 - 17:00 |