29/10/2026

In operation since 1958, Roman Laminor has gone through its most extensive transformation to date. It is one of the most demanding projects our team has delivered: a full EPC modernisation on the same site, rebuilt in stages under load. Temporary HV configurations kept power flowing without interruption to the industrial area around Roman and to more than 36,000 customers in Roman and 111 surrounding localities, through every phase of the works.

What changed in the substation:
•⁠ ⁠20 × 110 kV bays with new primary equipment: circuit breakers, disconnectors, instrument transformers
•⁠ ⁠110 kV busbar systems rebuilt in a more compact layout
•⁠ ⁠32 × 20 kV bays in a new containerized MV section, with vacuum switchgear
•⁠ ⁠2 x reactive power compensation reactors
•⁠ ⁠both 25MVA power transformers relocated onto new foundations and reconnected
•⁠ ⁠a new control center with decentralized protection and control
•⁠ ⁠AC and DC auxiliary supplies
•⁠ ⁠SCADA integration for remote monitoring and control

Thank you, , for your trust and for the close cooperation at every stage. Congratulations on your investment programme in Moldova’s distribution grid. Substations like Roman Laminor mean more reliable supply, room for new consumers and prosumers, and a network ready for what comes next.

Thank you to the whole ETHGroup team and everyone who worked on site over these two years.

PowerDistribution GridModernisation ModernisationFund Romania

22/10/2026
09/10/2026

Our Bucharest cabinet factory has passed Factory Acceptance Testing with Transelectrica, Romania’s national Transmission System Operator.

The tests covered the 220 kV control, protection and SCADA system we built for the Ghizdaru 220/110/20 kV substation: bay protection and control cabinets, SCADA cabinets, autotransformer auxiliary monitoring and AC/DC distribution, all communicating over IEC 61850. Ghizdaru still runs on control systems designed in 1974. After modernization, it will be operated remotely from Transelectrica’s Bucharest control center. Site works are already underway.

Here’s why it matters. 👇

For the Ghizdaru Substation, we prepared the detailed design, built the cabinets, tested them with the operator, and will install and commission them on site.

When one team owns the chain from drawing board to energization, issues are solved at the test bench, not in a live substation.

03/09/2026

ETHGroup a finalizat reconstrucția stației Roman Laminor, una dintre cele mai mari din rețeaua de distribuție din România și continuă modernizarea altor stații din regiune, fiind implicată în proiecte strategice precum autotransformatorul de 400 MVA de la Mintia, care va evacua puterea de la viitoarea centrală pe gaze și o bobină de compensare de 400 kV la Porțile de Fier, pentru stabilitatea tensiunii pe rețea.
În paralel, grupul își extinde capacitatea internă prin două unități de producție a dulapurilor electrice și prin dezvoltarea unor noi sucursale regionale.
🎤 Într-un pentru , Raul Popa, director general al companiei, prezintă proiectele în derulare, principalele direcții de dezvoltare și schimbările tehnologice care vor defini piața în următorii ani.
🔗 https://www.agendaconstructiilor.ro/stiri/energie-si-eficienta/ethgroup-isi-extinde-capacitatea-de-executie-pentru-proiecte-energetice-complexe

Photos from Boovie's post 30/07/2026
29/07/2026
23/07/2026

At Colacu, Dâmbovița, we are delivering the complete electrical infrastructure for a hybrid solar plant with 50.6 MW / 200.6 MWh of integrated storage. Our scope covers the 63 MVA 110/20 kV substation, full BESS installation and 110 kV grid connection, from engineering and design through civil works and full electrical ex*****on.

All 40 BESS containers and the STS units are on their foundations. Next up: electrical connections, MV cabling and substation works.

20/07/2026

Sunt puțini oameni care lasă o urmă reală în echipa din care fac parte. Cezar, tu ești unul dintre ei.

Ți-ai început drumul în energie alături de noi, în cadrul grupului. 18 ani mai târziu, deciziile și proiectele prin care ai trecut au un ecou care se va auzi ani de acum înainte, atât în ETHGroup, cât și dincolo de noi.

Astăzi, capitolul pe care l-ai început acum 18 ani la nivelul grupului se închide. Nu pentru că s-a terminat o poveste, ci pentru că începe una nouă.

Cezar, îți mulțumim pentru toți acești ani. Ai fost alături de noi umăr la umăr și în cele din urma ca lider, pe un drum care ne-a trecut prin dezvoltare, peste momente de criză, încercări și care în cele din urmă ne-a adus în calea succesului, a bunelor practici și a proiectelor bine făcute în industria energetică.

Îți urăm mult succes în tot ceea ce urmează.

Echipa ETHGroup

Other Energy Companies in Bucharest

Show All
  • Amtenvo

    Amtenvo

    Bucharest

    Instalații electrice, automatizări, mentenanță, materiale

  • OSCAR Downstream

    OSCAR Downstream

    Strada Mihai Eminescu Nr. 108/112, Bucharest 020082

    OSCAR este cea mai mare companie independentă distribuitoare de carburant din România.

  • C.M. Termoenergetica București

    C.M. Termoenergetica București

    Strada Cavafii Vechi Nr. 15, Bucharest 030167

    Compania Municipală Termoenergetica București S.A. (CMTEB)

  • Newntide Romania

    Newntide Romania

    Bucuresti, Sector2, Strada Delea Veche Nr24, Corp A, Etaj6, Modul M1, Bucharest

    A leading AIR SOURCE HEAT PUMP manufacturer in the world.

  • Welcome to the Axel Electrical Solutions company page. It is a company founded in 2021, specialized in complete electrical installation and automation solutions, design and ex*****...

  • Transelectrica

    Transelectrica

    Strada Olteni Nr 2-4, Bucharest 030786

    We lead the power!

  • SWI SOLAR

    SWI SOLAR

    Bucuresti, Sector2, Strada Delea Veche Nr24, Corp A, Etaj6, Modul M1, Bucharest

  • Andrem Strategy

    Andrem Strategy

    Piata Presei Libere, Casa Presei Libere, Nr. 1, Corp C, Etj. 2, Bucharest 013701

    ANDREM STRATEGY SRL este o societate relativ tânără apărută pe piața locală și zonală.

  • Alfa Energetic

    Alfa Energetic

    Bvd. Theodor Pallady, Nr. 287, Cladirea IOR 2, Etaj 6, Bucharest

    Casa Verde AFM: Alfa Energetic Esco | peste 1500 de Sisteme Fotovoltaice Casnice și Industriale

  • Alive Capital

    Alive Capital

    Strada Gara Herastrau 2-4, 6th Floor, Corner Office Building, Bucharest 020334

    Alive Capital is a Romanian company founded in 2013, by specialists with decades of experience.

Alerts

Be the first to know and let us send you an email when ETHGroup posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Subscribe

We will notify you when anything happens in Bucharest.