04/10/2026

๐๐š๐ฆ๐ฉ๐š๐ง๐ ๐š ๐ฃ๐ฎ๐ฌ๐ญ ๐ ๐จ๐ญ ๐š ๐ฐ๐ก๐จ๐ฅ๐ž ๐ฅ๐จ๐ญ ๐›๐ซ๐ข๐ ๐ก๐ญ๐ž๐ซ! โ˜€๏ธ

๐’๐ฎ๐œ๐œ๐ž๐ฌ๐ฌ๐Ÿ๐ฎ๐ฅ ๐’๐จ๐ฅ๐š๐ซ ๐๐š๐ง๐ž๐ฅ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง ๐ข๐ง Lubao, ๐๐š๐ฆ๐ฉ๐š๐ง๐ ๐š. โ—
๐“๐ก๐ข๐ฌ ๐ฌ๐ž๐ญ๐ฎ๐ฉ ๐œ๐š๐ง ๐ฌ๐š๐ฏ๐ž๐ฌ ๐ฎ๐ฉ ๐๐Ÿ0,๐Ÿ“๐ŸŽ๐ŸŽ ๐จ๐ง ๐ฒ๐จ๐ฎ๐ซ ๐ฆ๐จ๐ง๐ญ๐ก๐ฅ๐ฒ ๐ž๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ ๐๐ข๐ฅ๐ฅ! ๐Ÿ‘
Thank you to ๐’๐ข๐ซ Erwin for trusting our product and services!

10kW Hybrid Inverter. โœ…
A total of 10kWP Solar Panels with complete protective devices and mounting sets.โœ…
Guarantee of 25 Years Linear Solar Power๐Ÿ’ฏ

Back up power Battery ready for maximum power saving! โ˜€๏ธโšก๏ธ

Lets harness what is ๐…๐‘๐„๐„ from the sun.โ˜€๏ธ
Package starts at ๐Ÿ๐Ÿ‘๐ŸŽ๐ค ๐Ž๐ง๐ฅ๐ฒ with ๐…๐‘๐„๐„ CCTV!

๐๐ฎ๐š๐ฅ๐ข๐ญ๐ฒ ๐ข๐ฌ ๐จ๐ฎ๐ซ ๐๐ซ๐š๐ง๐ ๐Ÿ’ฏโœ…

๐…๐จ๐ซ ๐ข๐ง๐ช๐ฎ๐ข๐ซ๐ข๐ž๐ฌ:
โ˜Ž๏ธ๐ŸŽ๐Ÿ—๐Ÿ๐Ÿ—๐Ÿ”๐Ÿ–๐Ÿ”๐Ÿ’๐Ÿ‘๐Ÿ”๐Ÿ‘/ ๐ŸŽ๐Ÿ—๐Ÿ—๐Ÿ’๐Ÿ๐Ÿ‘๐Ÿ–๐Ÿ’๐Ÿ๐Ÿ๐Ÿ“/ ๐ŸŽ๐Ÿ—๐Ÿ๐Ÿ—๐ŸŽ๐Ÿ”๐Ÿ๐ŸŽ๐Ÿ•๐Ÿ—๐Ÿ—
๐Ÿ“ง๐ฌ๐š๐ฅ๐ž๐ฌ.๐ž๐ฌ๐ญ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ“@๐ ๐ฆ๐š๐ข๐ฅ.๐œ๐จ๐ฆ

30/08/2026

IMPORTANT SAFETY ADVISORY OF SOLAR SYSTEM โš ๏ธ
POWER-OFF PROCEDURE DURING SEVERE WEATHER & FLOODING

Phase 1: Before the Flood (If Safety Permits)
Follow this exact sequence to isolate current and prevent dangerous arc flashes:

1. Turn OFF the Main AC Grid Breaker: Switch off the main AC breaker in your distribution box (DB panel) or the external AC isolator to disconnect grid power feed.โœ…

2. Turn OFF the Solis Integrated DC Switch: Locate the red/yellow rotary DC switch located on the bottom/side of the Solis inverter casing and rotate it to the OFF (0) position.โœ…

3. Turn OFF the External DC Isolator (If Installed): Switch off any additional external DC disconnect switches between the solar array and inverter.โœ…

4. Turn OFF Battery Disconnect (For Hybrid Solis Systems): If your Solis unit is connected to energy storage (e.g., Solis Hybrid series with lithium/lead-acid batteries), switch off the dedicated battery DC breaker or isolator switch.โœ…

5. Turn OFF Backup / Load Breakers: Turn off any Critical Load / Backup (EPS) circuit breakers connected to the inverter.โœ…

Phase 2: During the Flood

1. DO NOT Touch Equipment: Never touch or submerge hands/tools near the Solis inverter, battery bank, or connected wiring while standing in water or on damp ground.โœ…

2. Assume Solar Cables are LIVE: Solar panels (PV modules) generate lethal DC voltage as long as daylight is present, even if the Solis inverter is switched off or submerged.โœ…

3. Evacuate the Area: If floodwaters enter the inverter or battery room, evacuate immediately. Water mixed with mud or salt conducts high-voltage electricity rapidly.
Phase 3: After Floodwaters Recede
CRITICAL: Do NOT attempt to turn the Solis inverter or breakers back on immediately, even if the unit appears clean and dry on the outside.โœ…

1. Keep All Breakers OFF: Leave all AC, DC, and battery switches completely turned off.โœ…

2. DO NOT Wash the Inverter: Never use tap water, high-pressure hoses, or cleaning liquids to spray silt or mud off wet/damaged electronics.โœ…

3. Inspect for Physical Damage: Check from a safe distance for signs of mud line height, burnt terminals, or mechanical damage.โœ…

4. Call a Certified Technician for Testing: Have a qualified installer perform required safety checks before re-energizing:โœ…

o Insulation Resistance (Megger Test): To verify no DC ground faults or insulation breakdowns exist in the PV strings.โœ…

o Internal PCB & Component Inspection: Moisture trapped inside the inverter enclosure can cause catastrophic short circuits or component explosions when energized.โœ…

o Terminal & Cable Corrosion Check: Ensure no moisture or mud residue remains inside connection ports or MC4 connectors.โœ…

5. Inspect Battery Storage Separately: Flooded lithium batteries present a high risk of internal short circuits and delayed thermal runaway days or weeks after the event. They must be professionally inspected or replaced.โœ…

1.Shutdown Order (Before Flood):Follow strictly in order to avoid arc flashes.
1. Turn OFF Main AC Grid Breaker.
2. Turn OFF Solis DC Rotary Switch (OFF / 0).
3. Turn OFF Battery Breaker / Disconnect (if hybrid).
4. Turn OFF Backup / Critical Load Breakers.

2.Post-Flood Power Restoration: Mandatory safety verification.
1. Keep all AC and DC breakers OFF.
2. Do NOT hose down or spray water on equipment.
3. Require a certified technician to run a Megger / insulation test.
4. Only re-energize after receiving official technical clearance.

Keep SAFE Everyone!

30/08/2026

IMPORTANT SAFETY ADVISORY OF SOLAR SYSTEM โš ๏ธ
POWER-OFF PROCEDURE DURING SEVERE WEATHER & FLOODINGโš ๏ธ

Phase 1: Before the Flood (If You Have Warning)
Perform a Emergency Shutdown (Rapid Shutdown):โœ…

Grid/AC Breaker: Switch off the main AC circuit breaker connecting the grid to the Deye inverter.โœ…

DC Disconnect / PV Isolator: Turn off the DC switch on the side/bottom of the Deye inverter or the external PV isolator to stop incoming power from the solar panels.โœ…

Battery Breaker: Switch off the circuit breaker or disconnect switch on your lithium or lead-acid battery bank.โœ…

Load/EPS Breaker: Switch off the breaker supplying power to your home load / back-up loads.โœ…

2.Disconnect Battery Cables (If Safe): If time and safety permit, disconnect the physical battery cables starting with the negative (-) terminal, assuming the system is completely switched off.โœ…

3. Protect or Elevate Equipment: If portable or low-mounted (such as ground-mounted batteries), move them to higher ground. Ensure the lower ports of wall-mounted Deye units are sealed if water level is expected to reach them.โœ…

Phase 2: During the Flood

1. DO NOT Touch the Inverter or System: Never submerge or touch any part of the Deye inverter, battery bank, or connected wiring while standing in water or wet ground.โœ…

2. Assume All Wires are Live: Solar panels (PV modules) generate DC voltage whenever there is daylight, even if the inverter is turned off or submerged. Submerged PV cables can electrify surrounding water.โœ…

3. Evacuate the Area: If floodwaters enter the room where the inverter, main switchboard, or batteries are installed, evacuate immediately and avoid contact with the water.โœ…

Phase 3: After the Floodwaters Recede

1.CRITICAL: Do NOT attempt to turn the Deye inverter, batteries, or solar breakers back on immediately after a flood, even if the unit appears dry on the outside.โœ…

2. Keep Power OFF: Leave all AC, DC, and battery breakers completely switched off.โœ…

3. Inspect for Damage visually from a safe distance: Check for visible signs of mud, silt, water intrusion inside the cabinet, or burnt/corroded terminals.โœ…
Do NOT Wash Internal Components: Do not use tap water, pressure washers, or liquid cleaners to wash silt or mud off the inverter or batteries.โœ…
Call a Certified Solar Technician / Electrician:โœ…

Have a licensed professional inspect the internal circuit boards (PCB), insulation resistance (Megger test), and terminal connections.โœ…

Internal components (capacitors, relays, microcontrollers) damaged by water can short-circuit or catch fire when re-energized.โœ…

5.Inspect the Battery System Separately: Lithium batteries exposed to floodwaters pose a high risk of internal short circuits and thermal runaway days or weeks after the flood. They must be professionally tested or replaced.โœ…

6. Check Grounding (Earthing): Ensure the earthing system and surge protection devices (SPDs) were not damaged or displaced by water movement.โœ…

Shutdown Order (Before Flood)
Follow strictly to avoid arc flashesโœ…

1.Turn OFF Main AC Grid Breaker.

2.Turn OFF Deye DC/PV Isolator Switch.

3.Turn OFF Battery Breaker / Switch.

4.Turn OFF Backup/Load Circuit Breakers.

Post-Flood Power Restorationโœ…
Do not bypass these safety checks

1. Ensure the area around the equipment is completely dry.

2. Keep all breakers OFF.

3. Schedule a certified technician for insulation & continuity testing.

4. Only turn on power after receiving official professional clearance.

10/08/2026

A T T E N T I O N JOB SEEKERS โ—โ—โ—โœ…๐Ÿ”Ž๐Ÿ”

Photos from MMC Solar and Security Solutions's post 09/08/2026

Completed CCTV PROJECT โœ…๐Ÿ’ฏ

Core Performance and Surveillanceโœ…
Dual-Illumination & Color Night Visionโœ…
Pan and Tilt Controlโœ…
Active Defense: โœ…

Smart AI and Connectivityโœ…
AI Detectionโœ…
Two-Way Talkโœ…
Wireless Setupโœ…

06/08/2026

Solar Plan โœ…๐Ÿ’ฏ

04/08/2026

๐๐š๐ฆ๐ฉ๐š๐ง๐ ๐š ๐ฃ๐ฎ๐ฌ๐ญ ๐ ๐จ๐ญ ๐š ๐ฐ๐ก๐จ๐ฅ๐ž ๐ฅ๐จ๐ญ ๐›๐ซ๐ข๐ ๐ก๐ญ๐ž๐ซ! โ˜€๏ธ
๐’๐ฎ๐œ๐œ๐ž๐ฌ๐ฌ๐Ÿ๐ฎ๐ฅ ๐’๐จ๐ฅ๐š๐ซ ๐๐š๐ง๐ž๐ฅ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง ๐ข๐ง ๐๐จ๐ซ๐š๐œ, ๐๐€๐Œ๐๐€๐๐†๐€. โ—
๐“๐ก๐ข๐ฌ ๐ฌ๐ž๐ญ๐ฎ๐ฉ ๐œ๐š๐ง ๐ฌ๐š๐ฏ๐ž๐ฌ ๐ฎ๐ฉ ๐๐Ÿ๐ŸŽ,๐Ÿ“๐ŸŽ๐ŸŽ ๐จ๐ง ๐ฒ๐จ๐ฎ๐ซ ๐ฆ๐จ๐ง๐ญ๐ก๐ฅ๐ฒ ๐ž๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ ๐๐ข๐ฅ๐ฅ! ๐Ÿ‘
Thank you to ๐’๐ข๐ซ ๐Œ๐š๐ซ๐ค for trusting our product and services!
10kW Ongrid Inverter. โœ…
A total of 10.0kWP Solar Panels with complete protective devices and mounting sets. โœ…
Guarantee of 25 Years Linear Solar Power๐Ÿ’ฏ
Net Metering ready for maximum power saving! โ˜€๏ธโšก๏ธ
Let's harness what is ๐…๐‘๐„๐„ from the sun. โ˜€
Package starts at ๐Ÿ๐Ÿ‘๐ŸŽ๐ค ๐Ž๐ง๐ฅ๐ฒ with ๐…๐‘๐„๐„ CCTV!
๐๐ฎ๐š๐ฅ๐ข๐ญ๐ฒ ๐ข๐ฌ ๐จ๐ฎ๐ซ ๐๐ซ๐š๐ง๐ ๐Ÿ’ฏโœ…
๐…๐จ๐ซ ๐ข๐ง๐ช๐ฎ๐ข๐ซ๐ข๐ž๐ฌ:
โ˜Ž๏ธ๐ŸŽ๐Ÿ—๐Ÿ๐Ÿ—๐Ÿ”๐Ÿ–๐Ÿ”๐Ÿ’๐Ÿ‘๐Ÿ”๐Ÿ‘/ ๐ŸŽ๐Ÿ—๐Ÿ—๐Ÿ’๐Ÿ๐Ÿ‘๐Ÿ–๐Ÿ’๐Ÿ๐Ÿ๐Ÿ“/ ๐ŸŽ๐Ÿ—๐Ÿ๐Ÿ—๐ŸŽ๐Ÿ”๐Ÿ๐ŸŽ๐Ÿ•๐Ÿ—๐Ÿ—
๐Ÿ“ง๐ฌ๐š๐ฅ๐ž๐ฌ.๐ž๐ฌ๐ญ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ“@๐ ๐ฆ๐š๐ข๐ฅ.๐œ๐จ๐ฆ

25/07/2026

๐๐š๐ฆ๐ฉ๐š๐ง๐ ๐š ๐ฃ๐ฎ๐ฌ๐ญ ๐ ๐จ๐ญ ๐š ๐ฐ๐ก๐จ๐ฅ๐ž ๐ฅ๐จ๐ญ ๐›๐ซ๐ข๐ ๐ก๐ญ๐ž๐ซ! โ˜€๏ธ
๐’๐ฎ๐œ๐œ๐ž๐ฌ๐ฌ๐Ÿ๐ฎ๐ฅ ๐’๐จ๐ฅ๐š๐ซ ๐๐š๐ง๐ž๐ฅ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง ๐ข๐ง ๐Œ๐š๐›๐š๐ฅ๐š๐œ๐š๐ญ, ๐๐€๐Œ๐๐€๐๐†๐€. โ—
๐“๐ก๐ข๐ฌ ๐ฌ๐ž๐ญ๐ฎ๐ฉ ๐œ๐š๐ง ๐ฌ๐š๐ฏ๐ž๐ฌ ๐ฎ๐ฉ ๐๐Ÿ”,๐Ÿ“๐ŸŽ๐ŸŽ ๐จ๐ง ๐ฒ๐จ๐ฎ๐ซ ๐ฆ๐จ๐ง๐ญ๐ก๐ฅ๐ฒ ๐ž๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ ๐๐ข๐ฅ๐ฅ! ๐Ÿ‘
Thank you to ๐’๐ข๐ซ ๐„๐๐ฐ๐š๐ซ๐ for trusting our product and services!
6kW Hybrid Inverter. โœ…
200AH Batteryโœ…
A total of 7.2kWP Solar Panels with complete protective devices and mounting sets. โœ…
Guarantee of 25 Years Linear Solar Power๐Ÿ’ฏ
Net Metering ready for maximum power saving! โ˜€๏ธโšก๏ธ
Let's harness what is ๐…๐‘๐„๐„ from the sun. โ˜€
Package starts at ๐Ÿ๐Ÿ‘๐ŸŽ๐ค ๐Ž๐ง๐ฅ๐ฒ with ๐…๐‘๐„๐„ CCTV!
๐๐ฎ๐š๐ฅ๐ข๐ญ๐ฒ ๐ข๐ฌ ๐จ๐ฎ๐ซ ๐๐ซ๐š๐ง๐ ๐Ÿ’ฏโœ…
๐…๐จ๐ซ ๐ข๐ง๐ช๐ฎ๐ข๐ซ๐ข๐ž๐ฌ:
โ˜Ž๏ธ๐ŸŽ๐Ÿ—๐Ÿ๐Ÿ—๐Ÿ”๐Ÿ–๐Ÿ”๐Ÿ’๐Ÿ‘๐Ÿ”๐Ÿ‘/ ๐ŸŽ๐Ÿ—๐Ÿ—๐Ÿ’๐Ÿ๐Ÿ‘๐Ÿ–๐Ÿ’๐Ÿ๐Ÿ๐Ÿ“/ ๐ŸŽ๐Ÿ—๐Ÿ๐Ÿ—๐ŸŽ๐Ÿ”๐Ÿ๐ŸŽ๐Ÿ•๐Ÿ—๐Ÿ—
๐Ÿ“ง๐ฌ๐š๐ฅ๐ž๐ฌ.๐ž๐ฌ๐ญ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ“@๐ ๐ฆ๐š๐ข๐ฅ.๐œ๐จ๐ฆ

25/07/2026

๐๐š๐ฆ๐ฉ๐š๐ง๐ ๐š ๐ฃ๐ฎ๐ฌ๐ญ ๐ ๐จ๐ญ ๐š ๐ฐ๐ก๐จ๐ฅ๐ž ๐ฅ๐จ๐ญ ๐›๐ซ๐ข๐ ๐ก๐ญ๐ž๐ซ! โ˜€๏ธ
๐’๐ฎ๐œ๐œ๐ž๐ฌ๐ฌ๐Ÿ๐ฎ๐ฅ ๐’๐จ๐ฅ๐š๐ซ ๐๐š๐ง๐ž๐ฅ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง ๐ข๐ง ๐’๐š๐ง ๐…๐ž๐ซ๐ง๐š๐ง๐๐จ, ๐๐€๐Œ๐๐€๐๐†๐€.. โ—
๐“๐ก๐ข๐ฌ ๐ฌ๐ž๐ญ๐ฎ๐ฉ ๐œ๐š๐ง ๐ฌ๐š๐ฏ๐ž๐ฌ ๐ฎ๐ฉ ๐๐Ÿ”,๐Ÿ“๐ŸŽ๐ŸŽ ๐จ๐ง ๐ฒ๐จ๐ฎ๐ซ ๐ฆ๐จ๐ง๐ญ๐ก๐ฅ๐ฒ ๐ž๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ ๐๐ข๐ฅ๐ฅ! ๐Ÿ‘
Thank you to ๐Œ๐š'๐š๐ฆ ๐€๐ง๐ง for trusting our product and services!
6kW Hybrid Inverter. โœ…
16kW Battery. โœ…
A total of 6.9kWP German Solar Panels with complete protective devices and mounting sets. โœ…
Guarantee of 25 Years Linear Solar Power๐Ÿ’ฏ
Net Metering ready for maximum power saving! โ˜€๏ธโšก๏ธ
Let's harness what is ๐…๐‘๐„๐„ from the sun. โ˜€
Package starts at ๐Ÿ๐Ÿ‘๐ŸŽ๐ค ๐Ž๐ง๐ฅ๐ฒ with ๐…๐‘๐„๐„ CCTV!
๐๐ฎ๐š๐ฅ๐ข๐ญ๐ฒ ๐ข๐ฌ ๐จ๐ฎ๐ซ ๐๐ซ๐š๐ง๐ ๐Ÿ’ฏโœ…
๐…๐จ๐ซ ๐ข๐ง๐ช๐ฎ๐ข๐ซ๐ข๐ž๐ฌ:
โ˜Ž๏ธ๐ŸŽ๐Ÿ—๐Ÿ๐Ÿ—๐Ÿ”๐Ÿ–๐Ÿ”๐Ÿ’๐Ÿ‘๐Ÿ”๐Ÿ‘/ ๐ŸŽ๐Ÿ—๐Ÿ—๐Ÿ’๐Ÿ๐Ÿ‘๐Ÿ–๐Ÿ’๐Ÿ๐Ÿ๐Ÿ“/ ๐ŸŽ๐Ÿ—๐Ÿ๐Ÿ—๐ŸŽ๐Ÿ”๐Ÿ๐ŸŽ๐Ÿ•๐Ÿ—๐Ÿ—
๐Ÿ“ง๐ฌ๐š๐ฅ๐ž๐ฌ.๐ž๐ฌ๐ญ๐Ÿ๐ŸŽ๐Ÿ๐Ÿ“@๐ ๐ฆ๐š๐ข๐ฅ.๐œ๐จ๐ฆ

Want your business to be the top-listed Home Improvement Business in Santa Rita?
Click here to claim your Sponsored Listing.

Website

Address


Santa Rita
2002

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 12pm

Alerts

Be the first to know and let us send you an email when MMC Solar and Security Solutions posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Subscribe

We will notify you when anything happens in Santa Rita.