MME Engineering Services

MME Engineering Services

Share

We offer quality mechanical (ref and air-con), electrical, plumbing, and construction services within Aurora Province and nearby provinces.

22/07/2019

Almost finished. Just doing finishing touches!

Photos from MME Engineering Services's post 22/05/2016

Finished project 2016, Aura Marina Sands Beach Resort, Sitio Diguisit, Baler, Aurora. Thank you for patronizing MME Engineering Services!😊

Photos from MME Engineering Services's post 20/08/2015

on-going project, at Diguisit, Baler

Photos from MME Engineering Services's post 15/05/2015

Consultancy - 320,000 Bags Onion Cold Storage, Palayan City

Photos from MME Engineering Services's post 15/05/2015

Gas Line Installation with Alarm System at Costa Pacifica Hotel, Baler, Aurora

Photos from MME Engineering Services's post 15/05/2015

Fire pump and variable speed drive water system at Costa Pacifica Hotel, Baler, Aurora

15/05/2015

Maraming salamat po sa pag-like sa MME Engineering Services page. God bless po!:-)

Photos from MME Engineering Services's post 15/05/2015

NFA, Suklayin, Baler project (finished)

15/05/2015

List of Recently Finished Projects

1. Computer Shop P 350,000.00
Quezon St. Brgy. Suklayin, Baler, Aurora

2. Water System and Generator Set Metal Gates Fabrications P 157,000.00
Costa Pacifica Hotel, Baler, Aurora
Owner – SSVI/Sen. Angara
November 2013

3. Domestic Water and Fire Pump Systems Installation P 2,900,000.00
Costa Pacifica Hotel, Baler, Aurora
Owner – SSVI/Sen. Angara
June 2013

4. Gas Line Installation P 480,000.00
Pavilion, Costa Pacifica Hotel, Baler, Aurora
Owner – SSVI/Sen. Angara
July 2013

5. Heat Pump and Water Return Pipe Installation P 115,000.00
Cluster 30, 40, & Pavilion, Costa Pacifica Hotel, Baler, Aurora
Owner – SSVI/Sen. Angara
August 2013

6. Heat Pump Water Return Line P 1,000,000.00
Costa Pacifica Hotel, Baler, Aurora
Owner – SSVI/Sen. Angara
September 2013

7. Air-conditioning Units Installation P 68,000.00
Cluster 00, Costa Pacifica Hotel, Baler, Aurora
11 ACCU/FCU units
Owner – SSVI/Sen. Angara
September 2013

8. Air-conditioning Units Installation P 400,000.00
Bahia II Hotel, Baler, Aurora
28 ACCU/FCU Units
Owner – SSVI/Sen. Angara
February 2012

9. Gas Line Installation P 75, 000.00
Bahia I Hotel, Baler, Aurora
Owner – SSVI/Sen. Angara
August 2012

10. Air-conditioning Units Installation P 50,000.00
Costa Pacifica Hotel, Baler, Aurora
17 ACCU/FCU units
Owner – SSVI/Sen. Angara
August 2014

11. AURELCO Multi-Purpose Gym P 2,803,000.00
Brgy. Reserva, Baler, Aurora
Owner – Aurora Electric Cooperative
February – May 2014

12. CONTRUCTION OF FARM TO MARKET ROAD P 198,000.00
Brgy. Diaman, Maria Aurora, Aurora
October 2014

13. RENOVATION OF E-BINGO P 1,050,000.00
Paseo De Carmona, Carmona Cavite
Owner – EGOGEN4 Corp./ Mr. Alex Uson
October 2014

14. RENOVATION OF E-BINGO P 180,000.00
Puregold Anabu, Imus Cavite
Owner – EGOGEN4 Corp./ Mr. Alex Uson
October 2014

15. REDLIGHT AND COMMISSARY PROJECT- (Electrical Works) P 230,000.00
Makati Ave., Makati City
Owner – Mothership Enterprise./ Mr. JP Hernandez & Erwan Heussaff
January 2015

16. ITALIAN RESTAURANT- (Electrical Works) P 100,000.00
Resorts World, Pasay City
January 2015

17. BAIT’S RESTAURANT- (Electrical and DuctingWorks) P 475,000.00
Signa Residences, Rufino, Makati City
Owner – Mothership Enterprise./ Mr. JP Hernandez & Erwan Heussaff
January 2015

18. SABAO RESTAURANT- (Ducting Works) P 150,000.00
Signa Residences, Rufino, Makati City
Owner – Mothership Enterprise./ Mr. JP Hernandez & Erwan Heussaff
January 2015

List of On-Going Projects

1. CONSTRUCTION OF NFA MAIN GATE/DRIVEWAY P 243,000.00
Brgy. Suklayin, Baler, Aurora
On-going

2. CONTRUCTION OF FARM TO MARKET ROAD P 198,000.00
Brgy. Diaman, Maria Aurora, Aurora
On-going

3. WAREHOUSE PROJECT (Electrical works) P 375,000.00
Valenzuela City
Owner – Infinity Agriculture Inc. / Mr. Albert Uson
On-going

4. ALFOX PRINTING SHOP (Electrical works) P 280,000.00
Quezon City
Owner – Abigail Lim
On-going

5. MONTECITO RESIDENCES (Electrical works) P 100,000.00
Resorts World
On-going

6. IMUS RESIDENCES (Electrical works) P 60,000.00
Imus Cavite
On-going

List of Finished and On-Going Projects (CCTV Works)

1. REDLIGHT AND COMMISSARY P 120,000.00
Makati Ave., Makati City
Owner – Mothership Enterprise./ Mr. JP Hernandez & Erwan Heussaff
November 2014

2. BAIT’S RESTAURANT P 120,000.00
Signa Residences, Rufino, Makati City
Owner – Mothership Enterprise./ Mr. JP Hernandez & Erwan Heussaff
January 2015

3. SABAO RESTAURANT P 120,000.00
Signa Residences, Rufino, Makati City
Owner – Mothership Enterprise./ Mr. JP Hernandez & Erwan Heussaff
January 2015

4. SPROUT P 100,000.00
Signa Residences, Rufino, Makati City
Owner – Mothership Enterprise./ Mr. JP Hernandez & Erwan Heussaff
On-going

5. BRGY. CCTV SYSTEM P 126,000.00
Brgy. San Vicente, Sta. Maria, Bulacan
January 2015

Consultancy Jobs:

320,000 Bags Capacity Titan Onion Cold Storage Plant
P 92,0000,000.00
Refrigeration System
Palayan City
Philippines

Want your business to be the top-listed Engineering Company in Baler?
Click here to claim your Sponsored Listing.

Website

Address


Baler
3200