Bormal Engineering
Bormal Engineering Sdn Bhd (Co. No. 132643-P)
Since 1985
Smart designs, strong execution, done right.
21/07/2026
๐ฃ๐ผ๐๐ฒ๐ฟ๐ถ๐ป๐ด ๐๐ต๐ฒ ๐ก๐ฒ๐
๐ ๐๐ต๐ฎ๐ฝ๐๐ฒ๐ฟ ๐ผ๐ณ ๐๐ฒ๐ฑ๐ผ๐ป๐ด
Every major development begins with the infrastructure required to support it.
Bormal Engineering is proud to have commenced works on the ๐๐ฒ๐ฑ๐ผ๐ป๐ด ๐ฏ๐ฏ๐ธ๐ฉ ๐ฆ๐๐ฏ๐๐๐ฎ๐๐ถ๐ผ๐ป ๐ฎ๐ป๐ฑ ๐ฝ๐ผ๐๐ฒ๐ฟ ๐ฑ๐ถ๐๐๐ฟ๐ถ๐ฏ๐๐๐ถ๐ผ๐ป ๐ป๐ฒ๐๐๐ผ๐ฟ๐ธ, together with the associated power distribution connection from the Serian 33kV Substation โ strengthening the electrical infrastructure that will help support the continued growth of Gedong and its surrounding areas.
Gedong itself is entering an exciting period of transformation. The planned Gedong Isthmus has been envisioned as a new strategic growth hub, alongside wider improvements in connectivity and future developments spanning commercial, educational, community and economic activities.
We may be building the substation and cable connections today, but the infrastructure we deliver will support opportunities and communities for many years to come.
03/07/2026
๐ฉ๐ฎ๐น๐๐ฒ ๐๐ป๐ด๐ถ๐ป๐ฒ๐ฒ๐ฟ๐ถ๐ป๐ด: ๐ ๐ฎ๐
๐ถ๐บ๐ถ๐๐ถ๐ป๐ด ๐ฉ๐ฎ๐น๐๐ฒ, ๐ก๐ผ๐ ๐๐๐๐ ๐ ๐ถ๐ป๐ถ๐บ๐ถ๐๐ถ๐ป๐ด ๐๐ผ๐๐
When people hear Value Engineering (VE), they often assume it simply means reducing project costs.
๐ก ๐๐ถ๐ฑ ๐๐ผ๐ ๐ธ๐ป๐ผ๐?
The objective of Value Engineering isn't to find the cheapest solutionโit's to achieve the best value throughout the life of a project.
In construction, Value Engineering is a structured process of evaluating different design, material, construction and procurement options to improve project performance while maintaining the required levels of ๐พ๐๐ฎ๐น๐ถ๐๐, ๐๐ฎ๐ณ๐ฒ๐๐, ๐ฟ๐ฒ๐น๐ถ๐ฎ๐ฏ๐ถ๐น๐ถ๐๐ ๐ฎ๐ป๐ฑ ๐ณ๐๐ป๐ฐ๐๐ถ๐ผ๐ป๐ฎ๐น๐ถ๐๐.
Effective Value Engineering can help:
(1) Improve constructability and simplify installation
(2) Reduce lifecycle operation and maintenance costs
(3) Optimise material and resource utilisation
(4) Minimize project risks and unnecessary rework
(5) Deliver better long-term value for project owners
The greatest opportunities for Value Engineering arise during the ๐ฝ๐น๐ฎ๐ป๐ป๐ถ๐ป๐ด ๐ฎ๐ป๐ฑ ๐ฑ๐ฒ๐๐ถ๐ด๐ป ๐๐๐ฎ๐ด๐ฒ๐, where changes can be evaluated before construction begins. Once construction is underway, design changes become progressively more expensive and disruptive to implement.
When applied effectively, it creates solutions that benefit not only the contractor, but also our clients, end users and the communities the infrastructure serves.
Because successful engineering isn't measured by ๐ต๐ผ๐ ๐บ๐๐ฐ๐ต ๐๐ผ๐ ๐๐ฝ๐ฒ๐ป๐ฑโit's measured by ๐๐ต๐ฒ ๐๐ฎ๐น๐๐ฒ ๐๐ผ๐ ๐ฐ๐ฟ๐ฒ๐ฎ๐๐ฒ.
04/05/2026
๐๐ต๐ผ๐ผ๐๐ถ๐ป๐ด ๐๐ต๐ฒ ๐ฅ๐ถ๐ด๐ต๐ ๐ฃ๐ฟ๐ผ๐ท๐ฒ๐ฐ๐ ๐๐ฒ๐น๐ถ๐๐ฒ๐ฟ๐ ๐ ๐ผ๐ฑ๐ฒ๐น: ๐ฃ๐ ๐ ๐๐ ๐๐ฃ๐
In infrastructure and construction projects, selecting the right delivery model can significantly influence risk allocation, project speed, cost certainty and overall accountability.
Two common approaches are ๐ฃ๐ ๐ (Project Management Consultancy) and ๐๐ฃ๐ (Engineering, Procurement & Construction) โ and while both aim to deliver successful projects, they fundamentally operate very differently.
Under the ๐ฃ๐ ๐ model, the client retains greater control and flexibility, while the PMC acts as the client's representative to coordinate designers, contractors, procurement and project ex*****on.
Under an ๐๐ฃ๐ model, the contractor assumes a larger role โ taking responsibility for design, procurement, construction and often commissioning under a single contract.
Neither model is universally better. The right choice depends on factors such as project complexity, timeline expectation, budget certainty and client's preferred level of involvement. Nevertheless, in the end, successful projects are not defined by the model chosen โ but by how well that model aligns with the project goals.
27/04/2026
๐ฃ๐ผ๐๐ฒ๐ฟ๐ถ๐ป๐ด ๐๐ฟ๐ผ๐๐๐ต ๐๐ฒ๐๐ผ๐ป๐ฑ ๐๐ต๐ฒ ๐๐ฟ๐ถ๐ฑ
Behind every growing community, expanding commercial hub and new healthcare facility is one thing people often don't see โ reliable infrastructure.
At Bormal Engineering, we're proud to have played a role in delivering substations that support Sarawak's growing needs.
โก ๐ฝ๐๐ฉ๐ช๐ ๐๐ฌ๐ ๐ฏ๐ฏ๐ ๐ ๐๐ช๐๐จ๐ฉ๐๐ฉ๐๐ค๐ฃ
Completed, this project continues to support the growing demand from the expanding Batukawa area, including developments around Pine Square and surrounding communities.
โก ๐ฝ๐๐ฉ๐ช ๐๐๐ฃ๐ฉ๐๐ฃ๐ ๐ฏ๐ฏ๐ ๐ ๐๐ช๐๐จ๐ฉ๐๐ฉ๐๐ค๐ฃ
Commissioned earlier this week, this substation plays a critical role in supporting the upcoming ๐๐๐ ๐ง๐ถ๐บ๐ฏ๐ฒ๐ฟ๐น๐ฎ๐ป๐ฑ ๐๐ผ๐๐ฝ๐ถ๐๐ฎ๐น, ensuring reliable power for healthcare services that will serve many in the years ahead.
Substation may not always be visible to the public โ but their impact is everywhere. They energize businesses, support hospitals and enable communities and create the foundation for future growth.
We're proud to build infrastructure that powers more than electricityโ we help power progress.
07/04/2026
๐จ๐ป๐ฑ๐ฒ๐ฟ๐๐๐ฎ๐ป๐ฑ๐ถ๐ป๐ด ๐๐ป๐๐ฒ๐ฟ๐ถ๐บ ๐ฃ๐ฎ๐๐บ๐ฒ๐ป๐ ๐๐ฒ๐ฟ๐๐ถ๐ณ๐ถ๐ฐ๐ฎ๐๐ถ๐ผ๐ป (๐๐ฃ๐) ๐ถ๐ป ๐๐ผ๐ป๐๐๐ฟ๐๐ฐ๐๐ถ๐ผ๐ป
In construction projects, progress is not only measured on site, it is reflected through structured payment processes.
The ๐๐ป๐๐ฒ๐ฟ๐ถ๐บ ๐ฃ๐ฎ๐๐บ๐ฒ๐ป๐ ๐๐ฒ๐ฟ๐๐ถ๐ณ๐ถ๐ฐ๐ฎ๐๐ถ๐ผ๐ป (๐๐ฃ๐) plays a critical role in ensuring that contractors are paid fairly for work completed, while maintaining transparency and accountability between all parties.
A typical process involves:
- Contractor submitting a progress claim based on work completed
- Consultants/Clients reviewing and issuing the Interim Payment Certificate (IPC)
- Contractor then raising an invoice based on the certified amount.
This process ensures that payments are aligned with the actual progress, reduces disputes and maintains healthy project cash flow โ which is essential for sustaining ongoing works.
Understanding the IPC process is key โ not just for contractors, but for all stakeholders involved in project delivery.
27/03/2026
๐จ๐ป๐ฑ๐ฒ๐ฟ๐๐๐ฎ๐ป๐ฑ๐ถ๐ป๐ด ๐ฃ๐ฟ๐ฒ๐ณ๐ฎ๐ฏ๐ฟ๐ถ๐ฐ๐ฎ๐๐ฒ๐ฑ ๐ฉ๐ฒ๐ฟ๐๐ถ๐ฐ๐ฎ๐น ๐๐ฟ๐ฎ๐ถ๐ป๐ (๐ฃ๐ฉ๐) ๐ถ๐ป ๐๐ฟ๐ผ๐๐ป๐ฑ ๐๐บ๐ฝ๐ฟ๐ผ๐๐ฒ๐บ๐ฒ๐ป๐
๐๐ถ๐ฑ ๐๐ผ๐ ๐ธ๐ป๐ผ๐? Without ground improvement, soft clay can take years to fully settle โ but PVD can reduce this to months.
At our Tg. Bako 275/33/11kV Substation Project, ground improvement works are currently underway using ๐ฃ๐ฟ๐ฒ๐ณ๐ฎ๐ฏ๐ฟ๐ถ๐ฐ๐ฎ๐๐ฒ๐ฑ ๐ฉ๐ฒ๐ฟ๐๐ถ๐ฐ๐ฎ๐น ๐๐ฟ๐ฎ๐ถ๐ป๐ (๐ฃ๐ฉ๐) โ a critical method for accelerating consolidation in soft soils.
In areas with compressible clay, natural settlement can take years. PVD works by providing a shortened drainage path for pore water within the soil, allowing excess water pressure to dissipate more quickly under surcharge loading. This significantly reduces consolidation time and improves the ground's bearing capacity for future structures.
The process involves installing vertical drains into the ground using specialized mandrel rigs, followed by surcharge filling to induce settlement. As the water is expelled through the drains, the soil gradually consolidates and gains strength โ ensuring long-term stability of the foundation.
Careful planning of drain spacing, depth and surcharge levels is essential to achieving the required performance while managing settlement limits and timelines.
Ground improvement is often unseen once completed, but it forms the foundation of everything that follows โ quite literally.
๐๐ฆ๐ฒ๐น๐ฎ๐บ๐ฎ๐ ๐๐ฎ๐ฟ๐ถ ๐ฅ๐ฎ๐๐ฎ ๐๐ถ๐ฑ๐ถ๐น๐ณ๐ถ๐๐ฟ๐ถ๐
As the holy month of Ramadan comes to a close, we take this moment to reflect on the values of patience, gratitude and togetherness that guide us both in our work and in our lives.
At Bormal Engineering, we are grateful for the continued trust and support from our clients, partners and team members. It is through these relationships that we are able to grow, overcome challenges and deliver meaningful projects for the betterment of Sarawak.
Hari Raya is a time to connect โ with family, friends and one another โ and to appreciate the journey we share as a community.
๐ฆ๐ฒ๐น๐ฎ๐บ๐ฎ๐ ๐๐ฎ๐ฟ๐ถ ๐ฅ๐ฎ๐๐ฎ ๐๐ถ๐ฑ๐ถ๐น๐ณ๐ถ๐๐ฟ๐ถ, ๐ ๐ฎ๐ฎ๐ณ ๐ญ๐ฎ๐ต๐ถ๐ฟ ๐ฑ๐ฎ๐ป ๐๐ฎ๐๐ถ๐ป
May this festive season bring joy, peace and renewed strength to all.
09/02/2026
๐๐ป ๐๐๐ฒ๐ป๐ถ๐ป๐ด ๐ง๐ต๐ฎ๐ ๐๐ฒ๐น๐ฒ๐ฏ๐ฟ๐ฎ๐๐ฒ๐ ๐๐ต๐ฒ ๐๐ผ๐๐ฟ๐ป๐ฒ๐ ๐ช๐ฒ ๐ฆ๐ต๐ฎ๐ฟ๐ฒ
Our recent Company Annual Dinner was a meaningful pause from the pace of everyday work โ a chance to step back, reflect, and appreciate the people who walk this journey together.
At Bormal Engineering, progress isnโt just measured by milestones or projects completed. Itโs shaped by the relationships, trust, and shared experiences built along the way. The conversations, laughter, and moments shared that evening reminded us that this journey is never walked alone โ itโs carried forward by a team that supports, challenges, and grows together.
Away from the drawings, site works, and deadlines, nights like these allow us to reconnect beyond our roles and strengthen the bonds that carry us through both the demanding and rewarding parts of what we do.
Thank you to everyone who made the night special. Hereโs to the journey ahead โ and to the people who continue to walk it together.
๐
Santa delivers gifts once a year.๐
We deliver solutions year-round.
Wishing our clients, partners, and team a Merry Christmas and a another great year ahead!!
04/12/2025
๐ฆ๐ผ๐ณ๐ ๐ฆ๐ธ๐ถ๐น๐น๐ ๐ ๐ฎ๐๐๐ฒ๐ฟ ๐๐๐๐ ๐ฎ๐ ๐ ๐๐ฐ๐ต ๐ฎ๐ ๐ง๐ฒ๐ฐ๐ต๐ป๐ถ๐ฐ๐ฎ๐น ๐ฆ๐ธ๐ถ๐น๐น๐ ๐ถ๐ป ๐๐ป๐ด๐ถ๐ป๐ฒ๐ฒ๐ฟ๐ถ๐ป๐ด
In construction and EPCC delivery, we often talk about drawings, specifications, schedules and technical competence. But projects aren't built by calculations, documentation and simulations alone. They're built by people, and that's where ๐๐ผ๐ณ๐ ๐๐ธ๐ถ๐น๐น๐ make all the difference.
The team members that grow the fastest, solve problem better and build stronger project teams are the ones who communicate early, document diligently, manage their time well, collaborate openly and uphold professionalism in every interaction. These qualities don't appear on drawings or method statements, yet they directly influence progress, safety, quality and client relationships.
Technical knowledge builds structures.
๐ฆ๐ผ๐ณ๐ ๐๐ธ๐ถ๐น๐น๐ ๐ฏ๐๐ถ๐น๐ฑ ๐๐ฟ๐๐๐, ๐๐ฒ๐ฎ๐บ๐๐ผ๐ฟ๐ธ, ๐ฎ๐ป๐ฑ ๐น๐ผ๐ป๐ด-๐๐ฒ๐ฟ๐บ ๐๐๐ฐ๐ฐ๐ฒ๐๐.
As the industry becomes more complex, with tighter schedules, higher expectations and integrated EPCC delivery, the ability to think clearly, communicate confidently and work effectively with people becomes just as critical as ever.
Click here to claim your Sponsored Listing.
Telephone
Website
Address
5th Floor 'STALLION', Sublot 17, Rock Commercial Centre, 1 1/2 Mile, Jalan Rock
Kuching
93200
Opening Hours
| Monday | 08:00 - 17:00 |
| Tuesday | 08:00 - 17:00 |
| Wednesday | 08:00 - 05:00 |
| Thursday | 08:00 - 05:00 |
| Friday | 08:00 - 17:00 |
| Saturday | 08:00 - 12:30 |