PanelDuct
Air distribution. Reimagined. Pre-insulated ducting for data centres and mission-critical environments.
30/04/2026
Join PanelDuct at Data Centre World Frankfurt on 6โ7 May at Messe Frankfurt.
Two days focused on innovation, efficiency, and the future of data centre infrastructure ๐
If youโre attending, leave us a comment and letโs connect and talk about smarter ducting solutions for next-generation facilities ๐ฌ
29/04/2026
โก๏ธ ๐ช๐ต๐ ๐๐ฒ ๐ฏ๐ฒ๐น๐ถ๐ฒ๐๐ฒ ๐ถ๐ป ๐ผ๐ณ๐ณ-๐๐ถ๐๐ฒ ๐บ๐ฎ๐ป๐๐ณ๐ฎ๐ฐ๐๐๐ฟ๐ถ๐ป๐ด ๐ณ๐ผ๐ฟ ๐ฐ๐ผ๐บ๐ฝ๐น๐ฒ๐
๐ฏ๐๐ถ๐น๐ฑ๐
Off-site manufacturing is at the heart of what we do at PanelDuct, and hereโs why! ๐ญ
On critical environment builds, programme pressure is real. Trades are competing for space. Timelines are tight. Traditional on-site duct fabrication adds to all of that.
The results speak for themselves:
โ๏ธ Up to 40% faster on-site installation
โ๏ธ One fix installation instead of three
โ๏ธ Less waste, less rework, less storage on site โ๏ธ Safer install environment
โ๏ธ Full Revit models available for clash detection and coordination
Thinking about off-site fabrication for your next project? Letโs talk!
๐ฉ [email protected] ๐www.panelduct.ie
24/04/2026
It might not be the most glamorous part of a building, but ductwork is one of the most important! ๐๏ธ
In critical environments, the duct system is what makes everything else work. Temperature control, pressure management and contamination control all depend on getting the air distribution right.
Get it wrong, and youโre dealing with hot spots, pressure failures and compliance headaches that are expensive to fix once the building is complete.
Thatโs exactly why we built PanelDuct the way we did. Pre-insulated, Class D airtight, fabricated off-site and installed in a single fix.
No three-stage installation process. No air leakage. No compromises on performance.
If youโre currently specifying or designing ventilation systems for a critical environment, weโd love to chat ๐ฉ Get in touch at [email protected]
23/04/2026
๐๏ธ Progress is well underway on this exciting data centre project in Germany, where precision, coordination, and performance are key at every stage. Itโs always rewarding to see a mission-critical environment take shape, with every detail contributing to long-term reliability, efficiency, and airflow performance.
17/04/2026
๐ผ ๐ช๐ฒโ๐ฟ๐ฒ ๐ต๐ถ๐ฟ๐ถ๐ป๐ด!
PanelDuct is seeking an experienced Production Manager to join the team and lead our manufacturing operations to the next level.
This is a key leadership role โ youโll oversee all manufacturing, logistics and product handling activities, drive continuous improvement, and play a direct role in shaping our long-term production strategy.
If you have a degree in Business Management, Engineering, Manufacturing, or Operations Management, at least 5 years of experience in manufacturing or production management, and are a strong leader who fosters accountability, safety, and culture, weโd love to hear from you!
๐ฉ Apply now, sending your CV to [email protected]
14/04/2026
๐ฏ ๐๐ถ๐ฝ๐ ๐๐ผ ๐ฒ๐ป๐ต๐ฎ๐ป๐ฐ๐ฒ ๐ฎ๐ถ๐ฟ๐ณ๐น๐ผ๐ ๐ฝ๐ฒ๐ฟ๐ณ๐ผ๐ฟ๐บ๐ฎ๐ป๐ฐ๐ฒ ๐
Efficient airflow is the backbone of every well-designed duct system, impacting energy use, comfort and operation efficiency.
Here are three proven ways in which you can improve airflow performance on your next project:
1๏ธโฃ Choose lightweight, low-leakage duct systems to reduce resistance and boost air velocity.
2๏ธโฃ Choose a Class D airtight ducting system to prevent leakage and maintain consistent pressure.
3๏ธโฃ Regularly inspect and clean airways to optimise system efficiency over time.
At PanelDuct, our pre-insulated ductwork systems are engineered to deliver maximum airflow efficiency with minimal energy loss.
โ๏ธSee how our technology is helping contractors and consultants achieve higher performance standards: https://panelduct.ie/projects
01/04/2026
๐
๐ ๐ฎ๐ฟ๐ฐ๐ต ๐ฎ๐ ๐ฃ๐ฎ๐ป๐ฒ๐น๐๐๐ฐ๐
From project milestones to team achievements, hereโs a quick look at what weโve been up to this month:
- The team attended Data Centre World in London
- We celebrated Engineers Week
- We completed the ICE Awards Interviews
- Progress in our project for a data centre in Frankfurt
Behind every project, weโre driven by one goal: creating smarter, more efficient ducting systems for modern buildings.
๐Stay tuned for next monthโs update.
27/03/2026
Across Europe, data centre development is accelerating at an incredible pace, driven by AI, cloud computing and everโgrowing processing demands.
Behind the scenes, HVAC systems are carrying a huge part of that load.
In our latest blog, we explore:
โ๏ธ How the boom is reshaping air distribution strategy and duct specification
โ๏ธ Why cooling efficiency now defines operational performance and compliance
โ๏ธ The role of Class D airtightness and preโinsulated systems like PanelDuct in achieving low leakage and fast installation
โ๏ธ What HVAC professionals need to do today to prepare for hybrid cooling and higher rack densities ahead
Whether youโre designing, specifying or managing a critical environment, this article breaks down the practical realities of building for the next generation of data centres.
๐ Read the full blog here: https://panelduct.ie/the-european-data-centre-boom-what-it-means-for-hvac-and-air-distribution
19/03/2026
A glimpse behind the scenes at our project in Frankfurt, where teamwork, precision, and dedication come together ๐ทโโ๏ธ๐ง
Our PanelDuct team is working hard on-site to deliver efficient, high-quality solutions that meet the ventilation demands of a data centre.
Proud of the effort and collaboration driving every stage of the work!
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Address
Breaffy Road
Castlebar
F23V832
Opening Hours
| Monday | 8am - 5pm |
| Tuesday | 8am - 5pm |
| Wednesday | 8am - 5pm |
| Thursday | 8am - 5pm |
| Friday | 8am - 5pm |