PEPEP14
Petroleum Exploration and Production Engineering Program (PEPEP) - Class 2014
Faculty of Petroleum and Mining Engineering
Suez University
Egypt Logging - Pet.
Petroleum Exploration and Production Engineering Program (PEPEP) is established under the patronage of the Supreme Council of Egyptian Universities. English is the teaching language and credits point system is used. PEPEP study program: University requirements (20 credit hours), Faculty requirements (90 credit hours), Department requirements (51 hours) and elective courses (20 hours). Period of st
03/03/2016
One day we used to be together.
27/05/2015
The Ballooning Effect.
25/05/2015
Successful LCM results.
23/05/2015
Hole Cleaning
28/04/2015
STUCK PIPE
Stuck pipe may be due to Wellbore Geometry. In this case there are several mechanisms, one of them is called "Undergauge Hole".
Undergauge Hole Causes Stuck Pipe when drilling in to hard and abrasive formations. Drilling bit is undergauge because the abrasive formation wears a bit and stablizers, a hole size becomes smaller. When the new BHA is run in hole, the new bit/BHA gets sutck into the undergauge hole section.
To minimize this problem, driller hasn't to stag weight in order to pass the tight spots. The more weight you put on top, the harder to free the pipe.
10/08/2014
It's our Graduation Party!
09/08/2014
Involve Me !
21/06/2014
GeoBrain ..
20/06/2014
That Moment
Click here to claim your Sponsored Listing.
Category
Contact the university
Website
Address
Suez