Ali Malik Riaz
Entrepreneur
17/09/2026
Bahria Town - A place where design, comfort, and location come together...
Experience a home made for better views, better moments, and a better way of living!
The Breathtaking Beauty of Bahria Town Karachi! A Masterpiece Community.
Bahria Town Karachi stands as a remarkable example of modern living, where stunning architecture, beautifully landscaped surroundings, wide roads, and thoughtfully planned spaces come together to create a truly distinctive community.
Bahria Town — A vibrant community connected by shared spaces, familiar faces, and moments that turn neighborhoods into homes... Where every frame captures a sense of belonging that goes beyond the everyday. This is community living, thoughtfully reimagined.
11/09/2026
Jummah Mubarak
09/09/2026
Master your tactical swing at Rayhan Hills Golf Club, a premier destination in Bahria Golf City Karachi. Enjoy unparalleled facilities and views.
08/09/2026
Humanitarian and Public Appeal by Bahria Town for immediate intervention to protect the life savings, homes, livelihoods and incomplete projects of the general public.
From glowing streets to late-night vibes, every corner feels like a scene worth capturing. Where the lights shine brighter, the nights last longer, and the city never really sleeps.
Bahria Town Karachi after dark — a whole different kind of magic.
On this Defence Day, we honour the valour and sacrifice of our Armed Forces and every Pakistani who has contributed to the safety and strength of our nation.
September marks another milestone in WAADA’s journey, as we continue to turn vision into reality through steady progress across the masterplan.
• Masjid-e-Rafi: Slabs for the Imam’s house first floor and mosque mezzanine have been cast.
• Altura: Shoring, piling and excavation at Altura 1 are complete, while foundation, waterproofing and raft works advance at Altura 2.
• Villas: Foundation, mock-up villas and water tank works are progressing across the 4-bedroom semi detached and 6-bedroom villas.
• Townhouses: Concrete casting for the first-floor and roof slabs, ground-floor and first-floor column works, and internal finishing works for the mock-up are all in progress.
• Cascada 1: Zone A raft works are underway, with the first tower crane now installed.
• Show Apartments: The 2-bedroom show apartment is complete, while the studio, 1 and 3-bedroom mock-ups progress at the Dubai South Sales Center.
Across the masterplan, WAADA continues to move forward, one milestone at a time.
Click here to claim your Sponsored Listing.
Category
Website
Address
Dubai
Alerts
Be the first to know and let us send you an email when Ali Malik Riaz posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.