Chopper Worx

Chopper Worx

Share

Specialised Helicopter Applications.

Chopper Worx is a leading provider of airborne resources, providing unique solutions for the development of electrical power infrastructure. Specialist aerial skills and services are utilised to provide safe and cost effective optimisation of overhead power line networks, which would be technically difficult and costly to execute conventionally.

06/01/2023

Concrete casting a while back on 765kV power line construction project near Ceres, Western Cape.

06/01/2023

High-voltage power line scanning in the Kingdom of Lesotho for a major EPC on the Highland Water Project (LHWP II) with our valued supplier.

Photos from Chopper Worx's post 05/01/2023

Concrete casting near Flagstaff in the Transkei, South Africa region. Working for EPC with our valued suppliers.

03/06/2021

It is with deep sadness to announce that Dirk vd Westhuizen, former Director and founding partner of Chopper Worx has passed away due to Covid-19. He will forever be missed, a man of immense intellect, drive and an ability to see solutions outside the box. He was brave and never feared to do things which was considered to be against the stream, or to speak his mind. He lived with his heart on his sleave. RIP tjomma.

16/01/2021

Aerial scanning with an Ofil UV camera in the 5-axis gimbal, capturing the corona emission

16/01/2021
16/01/2021

Aerial live work in Angola.

17/05/2020

Long line vertical reference slinging will always be our core activity

Ethiopia inaugurates Genale Dawa III hydroelectric power plant 02/03/2020

During the period March - July 2006, Chopper Worx provided the air crane solution for the geotechnical survey in the Dawa river near Genala in SE Ethiopia.

Today this has culminated in a 2.5 billion meter3 hydro dam with a generating capacity of 254MW.

Herewith same random pics operating from the extremely remote location.

Ethiopia inaugurates Genale Dawa III hydroelectric power plant Ethiopia has inaugurated the delayed Genale Dawa III hydroelectric power plant. The project has a total installed generating capacity of 254 MW.

Want your business to be the top-listed Contractor in Centurion?
Click here to claim your Sponsored Listing.

Address


Indigo Park, 221 London Lane, Knopjeslaagte
Centurion
00157