Aztec Construction
Working hard to deliver high quality work
06/28/2019
Before and after photos. Here's a couple more photos from Our project in Swansea, MA. Stay tuned for the acoustic ceiling.
06/25/2019
Final product. Drywall installation, level 4 finish & Sanded.
06/18/2019
Our current project! Only installing drywall and compound finish. Metal stud framing was not done by us. Stay tuned for the finished product.
06/18/2019
Installed Drywall in a basement, walls only.
06/18/2019
Helped out at the Four Point Hotel in Wakefield MA. ONLY Drywall installation, drywall finish and paint was done by us. A total of 3 floors.
06/18/2019
Installed drywall, and drywall finish only l. Before and after photos
06/18/2019
More photos, from Boylston, MA.
06/18/2019
First project where we could show show off our skills, all of our services were provided in this project, located in Boylston, MA. The following was completed by us.
- metal stud framing
- drywall installation
- Drywall finish and sanding
- Paint, for ceiling in walls
- Frp installation
- And acoustic ceiling installation
03/12/2019
02/26/2019
Joint compound finish by us
Click here to claim your Sponsored Listing.
Category
Telephone
Website
Address
Worcester, MA
01607