Carmichael Development LLC

Carmichael Development LLC

Share

We build from the ground up on a foundation of integrity by developing community through construction

Photos from Carmichael Development LLC's post 06/17/2026

Breaking ground in Kingston.

We're on site for the new RaceTrac gas station and convenience store, handling the early sitework that gets a project like this moving in the right direction.

Right now, erosion control is in place and the team is beginning the mass grading phase, working through changing site conditions while keeping safety, productivity, and progress at the forefront.

More details from this project coming in Friday’s video.
•••

06/15/2026

Ego has no place on our sites.

No one person completes a project on their own. It takes operators, labourers, foremen, leadership, trade partners, and every person willing to step in and do their part.

That’s how real progress happens: when we check our egos at the door, put personal pride aside, and focus on succeeding together.

One team. One goal. Build it right.
•••

Photos from Carmichael Development LLC's post 06/12/2026

This is who we are. This is what we do.

Show up, do the work, and do it the right way.

We Are Carmichael.
•••

06/11/2026

SITE UPDATE | Atlanta, Georgia

Carmichael Development is making steady progress on a 90,000 SF industrial warehouse project.

With mass grading complete and approximately 55,000 CY of dirt moved, our team is now focused on the underground utility scope. Storm drain and sanitary sewer installation are nearly complete, with water utility work set to begin next.

This phase is all about preparing the site for what comes next: proper grading, drainage, and utility infrastructure that supports the build from the ground up.

Proud to keep things moving safely and efficiently alongside Duffey Southeast.
•••

Photos from Carmichael Development LLC's post 06/08/2026

Progress in Atlanta.

Our team has been working through the site development phase on this industrial warehouse project, with mass grading now complete and underground utility work continuing to take shape.

Storm and sanitary sewer installation are nearly wrapped up, with water utility work up next. Like any sitework project, changing field conditions come with the job, but steady communication, safe ex*****on, and a strong crew keep things moving forward.

Site video coming Wednesday.
•••

Photos from Carmichael Development LLC's post 06/03/2026

BOOTS ON THE GROUND IN NEWNAN

The machines move the dirt, but it takes a whole lot more than iron to keep a job like this moving.

These photos show the other side of sitework. The crew on the ground, working by hand, and making sure each piece is ready for the next one.
•••

06/01/2026

Our team. Our work. Our standard.

Every jobsite is built by the people who show up, stay sharp, and take pride in doing the work right.

We Are Carmichael.
•••

Photos from Carmichael Development LLC's post 05/29/2026

Employee of the Month: Steven Chourio

This month, we are excited to recognize Steven Chourio as our Employee of the Month. Steven serves in HR Management Operations and brings an incredible amount of energy, positivity, and dedication to the Carmichael team every day. There is truly never a dull moment with Steven. His strong work ethic, joyful attitude, and ability to lift the mood wherever he goes make a lasting impact on those around him.

Steven represents Carmichael’s values of humility, integrity, and wisdom in the way he works, supports others, and carries himself each day. We are grateful to have him on our team and can’t wait to see all the great things he continues to accomplish in the future.
•••

05/27/2026

Every site tells a story.

A story of planning, teamwork, grit, and ex*****on. At Carmichael Development, our capability is shown in the way our crews move, the way our projects progress, and the way we continue building with purpose.

Want your business to be the top-listed Contractor in Woodstock?
Click here to claim your Sponsored Listing.

Telephone

Address


Woodstock, GA
30188