CW-5 Farm

CW-5 Farm

Share

CW5 Farm

08/15/2025

It is August and still green! Thankful for all the rain!

Photos from CW-5 Farm's post 05/15/2022

It’s all coming together. Almost 2 years living in the RV! Super excited to see the exterior getting some paint finally!

02/15/2022

Moving forward. Plumbing HVAC and electrical rough all complete! Next up insulation and drywall.

Photos from CW-5 Farm's post 01/14/2022

Day 42 of framing. Labor shortages, and Mon-Fri work at best. We have made some major modifications to our floor plan from the original floor plan, but bottom right gives the hint of what our little farm house should look like when we can finally move in.

12/01/2021

Exciting day at the farm today! First wall going up on our new home/“corporate office” for CW5-Farm!! 😂😁

Photos from CW-5 Farm's post 11/09/2021

Foundation inspection has passed! They are scheduled to pour concrete on Friday!

Photos from CW-5 Farm's post 10/20/2021

We found out yesterday, that our white farmhouse will require an exterior paint job in order to get the look we want. Who knew that white brick and white mortar was hard to match. We ended up selecting a cheaper brick since it will be painted. Here goes the budget!

10/15/2021

What is chemical injection/soil injection? Soil Injection uses non-toxic, water soluble chemicals (potassium salts and ammonium ions) that are injected into the ground under your building. These chemicals inhibit a soil’s ability to absorb water so that your soils do not swell up; sometimes referred to as soil stabilization.

Now that we have filled this 21,000 gallon tank 3 times, hoping by Monday(our 4th time filling) we are done with pre slab work and our form boards will be set shortly once this process has been completed.

So ready to get our home building process moving along here at the farm!

Want your business to be the top-listed Food & Beverage Service in Van Alstyne?
Click here to claim your Sponsored Listing.

Category

Website

Address


2435 BUCKSNORT Road
Van Alstyne, TX
75495