It is August and still green! Thankful for all the rain!
05/15/2022
It’s all coming together. Almost 2 years living in the RV! Super excited to see the exterior getting some paint finally!
02/15/2022
Moving forward. Plumbing HVAC and electrical rough all complete! Next up insulation and drywall.
01/14/2022
Day 42 of framing. Labor shortages, and Mon-Fri work at best. We have made some major modifications to our floor plan from the original floor plan, but bottom right gives the hint of what our little farm house should look like when we can finally move in.
12/01/2021
Exciting day at the farm today! First wall going up on our new home/“corporate office” for CW5-Farm!! 😂😁
11/09/2021
Foundation inspection has passed! They are scheduled to pour concrete on Friday!
10/20/2021
We found out yesterday, that our white farmhouse will require an exterior paint job in order to get the look we want. Who knew that white brick and white mortar was hard to match. We ended up selecting a cheaper brick since it will be painted. Here goes the budget!
10/15/2021
What is chemical injection/soil injection? Soil Injection uses non-toxic, water soluble chemicals (potassium salts and ammonium ions) that are injected into the ground under your building. These chemicals inhibit a soil’s ability to absorb water so that your soils do not swell up; sometimes referred to as soil stabilization.
Now that we have filled this 21,000 gallon tank 3 times, hoping by Monday(our 4th time filling) we are done with pre slab work and our form boards will be set shortly once this process has been completed.
So ready to get our home building process moving along here at the farm!