We’ve purchased a new home in Schenectady’s Stockade — one that dates back to at least the middle of the 1700s. Follow our progress!
It has a ton of character and needs a lot of love.
05/30/2026
With our kitchen plans now finalized, we have finished our cross-bracing and begun to install the subfloor!!
05/29/2026
It's pretty cool to see major TV show shooting (again) a block away in our neighborhood. It's even cooler when it's a historic TV show the likes of The Gilded Age. And even more so that I was able to take these pictures today!
Cleaning off the original basement ceiling boards that were underneath the first-floor floorboards. This is literally 260 years of dust that fell through the cracks. No artifacts were found (except wood shavings).
05/09/2026
Testing strategies for removing paint on the plaster
04/26/2026
Finally that time!!
04/04/2026
The new patio survived the winter! Took advantage of the gorgeous day to start cleaning up the back yard.
02/16/2026
Some kitchen foundation top repointing. Getting ready for the subfloor!
01/25/2026
Getting ready for the snow!
12/27/2025
The fresh snow just kinda makes things pop.
12/16/2025
Had a little holiday gathering this past weekend, giving us the chance to deck out the house!