Struggle Works
Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Struggle Works, Automotive Restoration Service, 30 Innis Avenue, Newburgh, NY.
07/16/2021
Got the gauge cluster all wired up tonight.
We think the GPS speedometer looks fantastic all lit up orange. Thanks again to everyone at SpeedHut for helping us to get this looking great.
·
·
·
07/09/2021
Fog light brackets ✅
The front-end is coming together. Would like some period lights but these were free-99 so they're perfect. Now to wire them up...
·
·
·
03/20/2021
Test fitting some new shoes on
We’re liking this look a lot. Now for some rubber.
·
·
·
02/13/2021
We got the GPS speedometer installed into the gauge cluster today.
It’s ready to be wired up... once the weather lets us get back to wiring This damn cold needs to let up.
There’s a few finishing touches left to do on this, filling some small gaps In the plastic and gun bluing the hardware for the reset button, but we’re super pleased with how it came out.
Thanks to the people at SpeedHut for letting me take the artwork for myself and get it perfect to match the OEM cluster.
·
·
·
02/10/2021
New GPS Speedometer for Thanks to for being amazing and working through the artwork to get this done. Very excited to install this in the cluster and get it wired up!
·
·
·
02/01/2021
*Final* rendering of the center console for
Using some dope Nano vents for their Cyclone AC system.
Under that the plan is to use an Radio/OBC bezel with the HVAC controls chopped off to house the radio and Flux Capacitor (angled toward the drive of course).
Below that will be a simple storage bin.
Now if this weather would get warmer so we can finish wiring the and get to building this out!!
·
·
·
09/29/2020
The Cyclone Air Conditioning and Heater system is all mocked in with our custom made overkill bracket. 😂😂😂
Now on to the wiring the whole dang car.
·
·
·
09/29/2020
Early this morning we installed a bulkhead for the AC and heater lines. This will keep the firewall a bit more tidy and also keep the inside of the car separate from the engine bay.
Then we spent the rest of what will probably be our last warm day getting the engine bay in color.
Next up we'll mount the Cyclone system and then run the wiring for everything.
The to-do list is very long but a HUGE part of is finished.
·
·
·
09/29/2020
08/13/2020
Made some grounds for the front and back of the new wiring harness.
We used the spots for the huge M14 bumper bolts and after cutting and tapping holes for some M8 bolts that got the guillotine, we have some grounds ready for grounding things.
·
·
·
@ Newburgh, New York
08/04/2020
Another picture of from the murder room for
·
·
·
08/01/2020
is finally in paint - been a looooong road.
Next up AC install, route the wiring, then paint the engine bay.
·
·
·
Click here to claim your Sponsored Listing.
Category
Website
Address
30 Innis Avenue
Newburgh, NY
12550