General contractor serving the bayarea since 1996
Another phase moving forward. From a space with no restrooms or plumbing to new drain lines, water lines, and a passed inspection, we’re now in the top out stage and pushing to get it finished on schedule.
Big project, tight timeline, and the CALGC crew is getting it done.
09/15/2026
Patio done, roof coming next. Another outdoor space upgraded by CALGC, with the roofing work finishing up soon.
09/13/2026
Another space completely remodeled and ready for its next chapter. New flooring, fresh finishes, upgraded restrooms, kitchen, and a cleaner, more functional layout by CALGC.
This is exactly why you need an editor!
How many years have we been in construction? Let's just say we have had a little practice. From 56 B.C. all the way to 2026, we still show up and get it done right. CAL GC General Contractors.
From demolition to framing, we take it one solid step at a time and do it right. This is what real progress looks like. CAL GC General Contractors, we build it the way it should be built.
08/10/2026
Whole patio cover was rotted through so we took it down today, rebuild starts next week.
08/03/2026
We Run the water lines and drains through this build, drywall goes on as soon as the rough in passes.
07/27/2026
Took the old washroom walls out of this commercial unit, cut the cast iron out and opened the whole space back up.