CLLA GROUP
CLLA Group performs concrete work also excavation, clearing trees and building or enlarging ponds.
06/25/2026
Great insights from our sister company, Venus Construction, on why early utility planning is critical to successful project delivery. It's another example of the value a turnkey team like Venus Construction, Tierra X Excavation, and CLLA GROUP bring to every development ๐ช
๐งฉ The Utility Puzzle โ Venus Construction Why Coordination Matters in Land Development When people think about infrastructure, they often picture pipes in the ground, crews in trenches, and equipment moving dirt. What many don't see is the coordination required to make all those systems work together.
06/21/2026
Happy Father's day from the CLLA Group family.
06/17/2026
๐๐๐ ๐ฌ๐ข๐จ ๐๐ก๐ข๐ช ๐ก
Before any concrete is poured on a large development project, thousands of feet of forms and rebar have already been put in place.
Forms establish the layout, elevation, and shape of the pavement, while rebar provides the strength needed to help concrete handle heavy loads and resist cracking over time.
When it comes to long-term performance, whatโs beneath the surface matters just as much as the finish. ๐
ยทยทยทยทยทยทยทยทยท
๐๐๐๐ ๐๐ฅ๐ข๐จ๐ฃ
๐๐ฎ๐๐ถ๐ป๐ด ๐๐ต๐ฒ ๐๐ผ๐๐ป๐ฑ๐ฎ๐๐ถ๐ผ๐ป ๐ผ๐ณ ๐ก๐ผ๐ฟ๐๐ต ๐ง๐ฒ๐
๐ฎ๐.โข
๐ cllagroup.com
๐ง [email protected]
โ๏ธ (817) 477-2050
06/10/2026
๐๐ฒ๐๐๐ถ๐ป๐ด ๐๐ต๐ฒ ๐ฑ๐ฒ๐๐ฎ๐ถ๐น๐ ๐ฟ๐ถ๐ด๐ต๐ ๐ฏ๐ฒ๐ณ๐ผ๐ฟ๐ฒ ๐ฐ๐ผ๐ป๐๐๐ฟ๐๐ฐ๐๐ถ๐ผ๐ป ๐ฏ๐ฒ๐ด๐ถ๐ป๐.
These mockups are part of the planning process for an upcoming municipal paving project in Irving. We're working alongside the client and the City to fine-tune the design and ensure everything is ready before crews mobilize.
Good projects start with good planning.
ยทยทยทยทยทยทยทยทยท
๐๐๐๐ ๐๐ฅ๐ข๐จ๐ฃ
๐๐ฎ๐๐ถ๐ป๐ด ๐๐ต๐ฒ ๐๐ผ๐๐ป๐ฑ๐ฎ๐๐ถ๐ผ๐ป ๐ผ๐ณ ๐ก๐ผ๐ฟ๐๐ต ๐ง๐ฒ๐
๐ฎ๐.โข
๐ cllagroup.com
๐ง [email protected]
โ๏ธ (817) 477-2050
06/04/2026
Every road, slab, parking lot, and sidewalk starts the same way:
๐ช๐ถ๐๐ต ๐ฝ๐ฒ๐ผ๐ฝ๐น๐ฒ ๐๐ต๐ผ ๐ฐ๐ฎ๐ฟ๐ฒ ๐ฎ๐ฏ๐ผ๐๐ ๐๐ต๐ฒ ๐ผ๐๐๐ฐ๐ผ๐บ๐ฒ.
At CLLA Group, our people are the foundation of everything we buildโand together, they're helping lay the foundation of North Texas every single day.
ยทยทยทยทยทยทยทยทยท
๐๐๐๐ ๐๐ฅ๐ข๐จ๐ฃ
๐๐ฎ๐๐ถ๐ป๐ด ๐๐ต๐ฒ ๐๐ผ๐๐ป๐ฑ๐ฎ๐๐ถ๐ผ๐ป ๐ผ๐ณ ๐ก๐ผ๐ฟ๐๐ต ๐ง๐ฒ๐
๐ฎ๐.โข
๐ cllagroup.com
๐ง [email protected]
โ๏ธ (817) 477-2050
05/25/2026
Today, we pause to honor the heroes who made the ultimate sacrifice for our freedom. Wishing everyone a meaningful Memorial Day.
05/20/2026
We recently completed work at the historic Longhorn Ballroom in Dallas, Texas โ a venue thatโs been part of Texas music history since 1950. From its roots as Bob Willsโ Ranch House to becoming one of Dallasโ most iconic performance venues, itโs a project with plenty of legacy behind it. Proud to play a role in work at a place with that kind of history.
๐ฆ๐ฐ๐ผ๐ฝ๐ฒ ๐ถ๐ป๐ฐ๐น๐๐ฑ๐ฒ๐ฑ:
โ
3,957 SF of 5" concrete slab over 4" cushion sand
โ
323 LF of 1' wide x 5' deep grade beam excavation/prep
โ
571 LF of interior grade beam installation
โ
Six (6) F1 structural footings
โ
Four (4) F2 structural footings
โ
124 SF of 5" electrical room concrete slab
โ
Two (2) concrete stair sets
โ
One (1) ADA-compliant handicap ramp with retaining walls
โ
1,355 SF of 7" heavy-duty concrete truck parking stalls
From structural concrete and foundational work to accessibility features and heavy-duty paving, this project required precision and coordination across multiple components. Great work by the CLLA Group crew helping support the continued legacy of an iconic Dallas landmark. ๐
ยทยทยทยทยทยทยทยทยท
๐๐๐๐ ๐๐ฅ๐ข๐จ๐ฃ
๐๐ฎ๐๐ถ๐ป๐ด ๐๐ต๐ฒ ๐๐ผ๐๐ป๐ฑ๐ฎ๐๐ถ๐ผ๐ป ๐ผ๐ณ ๐ก๐ผ๐ฟ๐๐ต ๐ง๐ฒ๐
๐ฎ๐.โข
๐ cllagroup.com
๐ง [email protected]
โ๏ธ (817) 477-2050
05/19/2026
Fantastic team!
A strong first quarter starts long before crews hit the field. Recently, we took our ๐๐๐๐ถ๐บ๐ฎ๐๐ถ๐ป๐ด ๐ง๐ฒ๐ฎ๐บ to lunch at Meehan's Chophouse in Mansfield to celebrate their hard work and recognize the role they play in setting projects up for success.
Thank you to the team for all you do and for helping lay the groundwork for successful projects!
ยทยทยทยทยทยทยทยทยท
๐ง๐ฅ๐จ๐ฆ๐ง ๐ถ๐ ๐ผ๐๐ฟ ๐๐ฅ๐๐ก๐.
venusconstruction.com
05/13/2026
๐ฆบ ๐ฆ๐ฎ๐ณ๐ฒ๐๐ ๐๐๐ฎ๐๐ ๐ฎ ๐ฝ๐ฟ๐ถ๐ผ๐ฟ๐ถ๐๐ ๐ผ๐ป ๐ฒ๐๐ฒ๐ฟ๐ ๐ฝ๐ฟ๐ผ๐ท๐ฒ๐ฐ๐.
Appreciate Roger White, Safety Director at Venus Construction, leading a recent safety meeting with the CLLA Group team. ๐
ยทยทยทยทยทยทยทยทยท
๐๐๐๐ ๐๐ฅ๐ข๐จ๐ฃ
๐๐ฎ๐๐ถ๐ป๐ด ๐๐ต๐ฒ ๐๐ผ๐๐ป๐ฑ๐ฎ๐๐ถ๐ผ๐ป ๐ผ๐ณ ๐ก๐ผ๐ฟ๐๐ต ๐ง๐ฒ๐
๐ฎ๐.โข
๐ cllagroup.com
๐ง [email protected]
โ๏ธ (817) 477-2050
05/06/2026
๐แดสแดแดแดแดแด แดแดแดแดสแดแดแด:
๐ง๐จ๐ฅ๐ก ๐๐๐ก๐ ๐๐ฆ๐ง๐๐ฃ๐๐๐ก๐ฉ๐๐๐๐
We recently completed a Turn Lane project in Stephenville, Texas, focused on improving traffic flow, safety, and overall roadway function. This project required coordination across paving, striping, and traffic control to bring everything together the right way.
๐ฆ๐ฐ๐ผ๐ฝ๐ฒ ๐ถ๐ป๐ฐ๐น๐๐ฑ๐ฒ๐ฑ:
โ
Removal of existing curb, driveway, and striping
โ
Relocation of roadway signage
โ
Installation of new asphalt turn lane with flex base
โ
Pavement striping, thermoplastic markings, and RPMs
โ
Traffic control throughout construction
From the initial sawcut to final striping, this project took coordination and attention to detail to deliver a clean, functional result. Proud of the CLLA Group crew for getting it done right. ๐
ยทยทยทยทยทยทยทยทยท
๐๐๐๐ ๐๐ฅ๐ข๐จ๐ฃ
๐๐ฎ๐๐ถ๐ป๐ด ๐๐ต๐ฒ ๐๐ผ๐๐ป๐ฑ๐ฎ๐๐ถ๐ผ๐ป ๐ผ๐ณ ๐ก๐ผ๐ฟ๐๐ต ๐ง๐ฒ๐
๐ฎ๐.โข
๐ cllagroup.com
๐ง [email protected]
โ๏ธ (817) 477-2050
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
PO BOX 857
Midlothian, TX
76065