Freeman Construction

Freeman Construction

Share

We specialize in concrete and masonry: Flatwork, Ornate Finishes, Stairs, Walls, Repairs, Demolition, Weather Proofing (sealing), etc.

06/13/2019

We finished the paver patio today...first time using blue stone but it came out great!

05/28/2019

Starting on our new project... A paver patio. Some good old fashioned shovel and wheelbarrow digging today. Glad it was cool out!

05/21/2019

Done! Concrete pad for cooler✅ handicap ramp✅ and we mixed and poured the sidewalk today!

Photos from Freeman Construction's post 05/15/2019

We’re also putting in a longer handicap ramp. We demolished the first one, set the forms, added crushed stone, and we’ll pour it tomorrow.
Lastly we’ll add a walkway.

Photos from Freeman Construction's post 05/15/2019

Putting in a concrete pad for a cooling unit behind Mikes Corner Store in North Andover. We dug it out, set the forms, added some crushed stone, and we’re ready to pour the concrete tomorrow.

Photos from Freeman Construction's post 04/30/2019

We made the forms, poured, and broom finished some dugout floors for the baseball fields in North Andover. We finished the first field. All that’s left on these ones are to cut some control joints and strip off the forms.

04/12/2019

The season for masonry work is back in full swing! Yesterday we fixed stone stairs that somebody had started a few years ago and stopped midway through.
Here is a before and after.

Photos from Freeman Construction's post 11/07/2018

Before and after... we added on to a pre existing concrete driveway and also put in another matching 18x18 concrete driveway in North Andover. Still have to remove forms and cut in control joints.

11/06/2018

We poured and finished them last week and finally had a chance to strip the forms, yesterday. They came out nice!

Photos from Freeman Construction's post 10/22/2018

Finished demolishing sidewalk. Moved all concrete to dumpster. We will put up forms and level it up tomorrow. Hopefully pour and finish on Weds.

10/17/2018

Doing a demolition of an existing sidewalk. Hopefully we will finish Friday or Monday and we will set up forms and pour/cut new ones.

Photos from Freeman Construction's post 10/12/2018

Floor poured, control joints cut in, forms removed, and it’s ready to go!

Want your business to be the top-listed Engineering Company in Methuen?
Click here to claim your Sponsored Listing.

Telephone

Address


72 West Street
Methuen, MA
01844