Progress is clearly visible at the East Greenbush site!
It's incredibly satisfying to see such a large site take shape, with 13MW of power being built to last. ☀️
Built for Northern Sun Energy
Foundations APA Solar Racking
Racking FLEXRACK by Qcells
03/24/2026
Let's give a big round of applause to the team that makes everything possible! 👏
A huge shoutout to this incredible group that brings our projects to life. This group photo captures just a small portion of the dedication and hard work they put in every day.
Every megawatt we install is a testament to their commitment. We often talk about "our" goals and "our" projects, but the truth is that our success wouldn't exist without the people in this photo. This team carries the load, solves problems, and gets the job done, no matter the circumstances.
Today, we take a moment to give credit where it's due. Much respect to the best crew in the business for turning our vision into reality, day in and day out!
Spring is here, and the fleet is ready to shine. These aren’t your typical “off-the-shelf” machines. We’ve custom built our own foundation and panel machines to handle the specific demands of our 2026 pipeline.
Quality machines = faster installs and higher precision
Our machines are prepped, our team is dialed in, and we’re ready to lay the foundations for a record breaking season. Let’s get to work!
Watching this machine in action never gets old!
We’re making great headway at the East Greenbush project. To date, we’ve successfully installed thousands of ground screws using our custom-built, multi-functional foundation machine.
This machine handles it all- from piles and screws to helicals and even rock drilling. The best part? Adaptability. Whether we’re swapping tooling to pivot from ground screws to piles or pre-drilling, we can do it all with one machine.
We don’t just build solar- we build foundations that last.
02/03/2026
January was a busy month for our team! Our crews hit the ground running, moving through every phase of the install process across multiple job sites.
From first post to final module, here’s how we spent the last 31 days:
⭐ Drilling & Foundations
Our machinery stayed busy this month. Between ground screws and piles, we are ensuring a rock-solid foundation for the racking assembly ahead.
⭐ Racking & Torque Tubes
Our assembly teams have worked in perfect coordination, installing thousands of purlins and torque tubes to prepare for the weight of the panels that will follow.
⭐ Panel Mounting
We’ve been "dropping glass" all month long, progressing through several megawatts of panel installation to get these sites closer to commissioning.
We’re built for the grind and ready to carry this momentum straight into February. Let’s keep building!
Nothing beats the sound of foundation progress! We are thrilled to have broken ground and kicked off operations for this 4.5 MW driven pile tracker we are building for Dynamic Energy! DMH will be performing the foundation, racking, and panel installation for this project and we can’t wait to see the project start to take shape.
Drilling and screw operations are actively progressing at the East Greenbush site, and we’re thrilled to share that we are nearing the 50% completion mark!
At DMH, we recognize that installing foundations with precision is crucial—it’s the backbone of every successful project. Whether you require a pounder, screw machine, drill rig, or all three, we’ve got you covered!
01/09/2026
We are starting off 2026 on the bright side! ☀️
Our team just wrapped up the first install of the year and it’s one for the books! This 2.5 MW fixed-tilt system is set on a previous landfill and will be repurposed to harness the power of the sun! Looking forward to 2026 and continuing to pave a greener future.
12/16/2025
Don’t let soft ground stall your schedule.
By utilizing mud mats, we create a stable working platform even in the most challenging soil conditions. This setup allows our machinery to operate safely and efficiently without sinking or creating a mess, keeping the project on track and the site clean.
12/08/2025
Safety & Security for the Win!
The best teams deserve the best protection. That's why we deployed our new security cameras across our jobsites, not just to protect our tools, but to look out for our people.
These cameras ensure:
- A safer environment for our crew.
- Rapid identification of any unauthorized activity.
- Peace of mind knowing our hard work is protected after hours.
We’re building better, together!
11/20/2025
Best office view of the week! Nothing beats a beautiful sunrise to start the day! The sky’s on fire, and so is our team as they wrap up panel installation on a local job to us in Fleetwood, PA
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Lebanon, PA
17112
Opening Hours
| Monday | 7:30am - 5pm |
| Tuesday | 7:30am - 5pm |
| Wednesday | 7:30am - 5pm |
| Thursday | 7:30am - 5pm |
| Friday | 7:30am - 5pm |