Laird + Smithers
Laird + Smithers is a structural and civil engineering firm located in Jackson, MS.
09/25/2019
It is exciting to see the CMU walls going up at the New Northwest Rankin High School. You can really begin to see the magnitude of the project as the structure takes shape.
Laird + Smithers is glad to be part of the team working alongside Thrash on this project.
- The CMU walls are going up at the all new Northwest Rankin High School.
Find more information about this project: http://ow.ly/FHfY50wn12k
09/12/2019
Laird + Smithers not only provides Structural Engineering services for new construction and historical projects, we also provide Civil Engineering services.
One of our projects currently under construction is the UMMC Center for Emergency Services. This 27,500 square foot building will house helicopters (in addition to a Helipad) for UMMC and other emergency vehicles used for statewide emergency response. It will also be used as a training facility for emergency personnel. This center will be a great asset to the state of MS in those unfortunate circumstances where time is of the essence.
Laird + Smithers provided civil engineering services for the approximately 9.5 acre site, including a 75 space parking lot and detention pond. Along with providing engineering services for grading, drainage, utilities and other typical site work items, the project includes a 375 foot long retaining wall which provides interstate frontage for UMMC.
09/05/2019
At Laird + Smithers, the past often collides with the present.
It’s an honor to be asked to look at the Eudora Welty House. The Eudora Welty House was built in 1925, by Eudora’s parents. Eudora Welty composed all of her writings in this house.
While Laird + Smithers always enjoys being a part of history, we also appreciate being a part of projects that will build the future.
The construction of the new Northwest Rankin High School is well underway. These buildings will be responsible for holding those that will be building young minds for the future.
08/08/2019
As school begins for most schools in the area this week, we were able to get a firsthand look at a couple of our school projects that are currently under construction.
08/05/2019
Where is Laird + Smithers? This photo was taken while on site recently. Does anyone have an idea of what this equipment is used for or where we are?
08/02/2019
With construction of the structure for the Children’s Hospital Expansion nearing completion, the construction of the 5 story parking garage is underway.
07/24/2019
An exciting day for all involved! We were fortunate to be present with other professionals who have been integral to this project’s success. The structure is mostly complete, so the building will be rapidly taking shape over the next several months.
Construction update on Northwest Rankin High School from the contractor, Thrash Commercial Contractors.
07/11/2019
A sneak peak at the new Northwest Rankin High School.
Here is a sneak peek at the new Northwest Rankin High School. For more information on this project or others in the district, visit our website at http://ow.ly/Igdt50uwmJw
Great video on the progress of work on the many buildings at Camp Kamassa. Glad to be a part of these projects for such a worthy cause.
07/11/2019
Much progress is being made on the buildings at Camp Kamassa.
03/01/2019
Laird + Smithers is proud to be working with Dean & Dean on numerous projects at Camp Kamassa.