LINQX

LINQX

Share

Welcome to the official LINQX Facebook channel—your go‑to source for digital transformation in oil & gas.

We use AI, advanced analytics, and decades of expertise to revolutionize well construction—from design and drilling through cementing & fracture. Welcome to the official LINQX facebook—your go‑to source for digital transformation in the oil and gas industry. We leverage AI, advanced data analytics, and decades of expertise to revolutionize well construction and stimulation—from design and drilling through cementing, fracture logging, and production optimization.

08/13/2026

Cementing problems rarely appear all at once.

A pressure change. A shift in ECD. A change in flow rate. Small signals can become bigger problems when they aren’t visible soon enough.

CEMPRO Live gives engineers a real-time view of critical cementing parameters, with simulation and automated alerts to help identify changes while the job is underway.

See how it works in our upcoming webinar:

👉 Register here:
https://na2.hubs.ly/H079M680

08/06/2026

💡 Great conversations drive great ideas.

Our team with LogistixIQ recently came together over lunch to discuss strategy, share perspectives, and align on priorities. Bringing teams together strengthens collaboration, encourages new ideas, and helps us continue moving forward with a shared vision.

Real-Time Monitoring in Well Cementing: Improving Visibility During Critical Operations - LINQX 07/30/2026

👀 What if the most important part of a cement job is the part you can't see?

The critical events that determine long-term well integrity happen thousands of feet below the surface.

As wells become more complex and pressure windows continue to narrow, understanding downhole conditions while the job is in progress is becoming increasingly important.

In our latest blog post, we explore:

✔ Why real-time visibility matters
✔ The limitations of post-job analysis
✔ How engineering models and live operational data improve operational awareness

📖 Read the blog: https://na2.hubs.ly/H06YPNR0

Real-Time Monitoring in Well Cementing: Improving Visibility During Critical Operations - LINQX Cement sheath failure in injection wells remains one of the oil and gas industry’s most costly and persistent well integrity risks. It’s not a new challenge—but it is becoming more severe. As mature fields transition into EOR programs and CO₂ storage expands, the conditions cement was origin...

07/28/2026

What does greater visibility across the cementing workflow look like in practice?
Our latest video takes a closer look at how CEMPRO Live helps engineers gain deeper insight into cementing operations—from planning and simulation to post-job evaluation and real-time decision support. See how CEMPRO Live helps teams make more informed decisions, reduce uncertainty, and improve cementing performance.

🎥 Watch the video:
https://na2.hubs.ly/H06WHYz0

Interested in seeing how CEMPRO Live can support your workflows? Request a personalized demo with our team: https://na2.hubs.ly/H06WJ7v0

07/24/2026

Building stronger collaboration across the organization starts with strong connections across our teams.

As we celebrate one year together under one roof, our pickleball event was an opportunity to strengthen relationships, encourage cross-functional collaboration, and continue building the culture that supports innovation at LINQX.

Over the past year, we’ve grown as one team—bringing together diverse expertise, experiences, and perspectives to advance the solutions we deliver to the industry.

We’re proud of the team behind LINQX and look forward to continuing to grow together.

07/23/2026

How much of what's happening downhole can you actually see during a cementing job?
Surface data only tells part of the story.

Our latest case study shows how CEMPRO Live helps engineers compare measured and calculated pressure, monitor bottomhole and fragile-zone ECD, and identify potential risks before they impact operations.

See how real customer feedback validated the results—and why real-time engineering is changing the way cementing decisions are made.

📄 Read the full case study: https://na2.hubs.ly/H06QHh70

Have you started using real-time engineering to support your cementing operations?

07/21/2026

Cementing is changing.

For years, engineers have relied on post-job analysis to understand what happened during a cementing operation.

Now, what if you could see changing conditions while the job is still happening?

CEMPRO Live brings real-time cementing simulation and operational visibility together—helping engineers better understand operations, monitor key performance indicators, and make informed decisions in the moment.

The future of cementing is not just analyzing results. It’s having the visibility to understand what is happening, as it happens.

📩 Schedule a personalized demo: [email protected]

📄 Explore the latest CEMPRO Live capabilities:
https://na2.hubs.ly/H06Nz7Q0

07/20/2026

Are you confident in your CO₂ injection workflow?

Join us tomorrow to see how CEMLife 4.0 helps evaluate downhole conditions, cement integrity, and well performance—all in one workflow.

🎟️ Reserve your spot before registration closes:
https://na2.hubs.ly/H06MBdd0

The Integrity Risk Operators Can’t Ignore in CCUS and EOR Wells - LINQX 07/16/2026

A well can produce for decades… but can its cement barrier last just as long?

As operators move toward CCUS and CO₂-EOR, one challenge continues to demand attention:

How do we ensure well integrity today for conditions the well may face years from now?

Cement is designed to provide long-term zonal isolation—but pressure changes, temperature cycles, and CO₂ exposure can challenge even the strongest barriers over time.

Understanding where failures begin is the first step toward preventing them.

In our latest blog, we explore:
🔹 Why cement integrity can deteriorate over the life of a well
🔹 How CO₂ injection changes downhole conditions
🔹 Why predictive simulation is becoming an important part of well integrity planning

💬 What do you think is the biggest challenge for long-term well integrity in CCUS projects?

Read the full blog: https://na2.hubs.ly/H06Jqqf0

The Integrity Risk Operators Can’t Ignore in CCUS and EOR Wells - LINQX Hydraulic fracturing is a complex, highly variable process. No two formations behave exactly the same, and a fluid that works well in one stage can underperform in another. Choosing the right frac fluid is about more than viscosity—it’s about understanding formation characteristics, fluid proper...

Want your business to be the top-listed Equipment Service in Houston?
Click here to claim your Sponsored Listing.

Telephone

Address


2050 W Sam Houston Parkway S, Suite 1750
Houston, TX
77042

Opening Hours

Monday 9am - 6pm
Tuesday 9am - 6pm
Wednesday 9am - 6pm
Thursday 9am - 6pm
Friday 9am - 6pm