Jeff Hack Construction
Construction, home and commercial improvements, repair and maintenace
03/03/2020
220 volt spa electric installed.
New main panel breaker installed.
Garage sub panel installed.
220 volt electric car charger circuit added.
Conduit ran from front side of home down the side and over to the middle of the rear yard.
Trenches rented at The Home Depot to allow schedule 80 conduit to be properly buried.
Spa delivery is after landscaping is performed.
03/03/2020
Custom built barbeque.
Dual sided eating/drinking bars.
Tile walls.
Marble stone countertop.
Granite stone floor tiles set into synthetic turf.
And finally.... a spa to relax in set on paving stones.
03/03/2020
Removed tub/shower combination.
Set new solid surface shower pan.
GoPanel wall system.
Ceramic tile shower surround.
Safety grab bars.
Bypass shower doors.
Click here to claim your Sponsored Listing.
Category
Contact the business
Telephone
Website
Address
Henderson, NV
89011