Edgemont Home Repair

Edgemont Home Repair

Share

Home Repair and Remodeling services in Gallipolis, Ohio and the surrounding areas.

Photos from Edgemont Home Repair's post 09/24/2022

Wrapped up a tiling a shower yesterday. The colors and details make this shower look amazing. Contact me today if you are in need of a bathroom remodel.

Photos from Reach Out on Campus - Rio Grande Campus's post 06/11/2022

Had a great time serving the community and teaching others to work with their hands.

Photos from Edgemont Home Repair's post 12/28/2021

The table I started in November is done and it was a Christmas present for my grandmother. It started as a tree in her backyard that was removed 4 years ago. I milled the tree into boards and let them dry. This is some detail shots and the final product. If you are interested in custom furniture contact me for more information.

Photos from Edgemont Home Repair's post 12/15/2021

Had a good day to convert a deer stand to a playhouse. This was a fun project a I got to reuse some old playground equipment to make it even more fun.

11/16/2021

Started a bathroom refresh yesterday. Fixing damaged drywall the next few days then paint, new trim and new lighting.

Photos from Edgemont Home Repair's post 11/11/2021

Is your dryer not getting your clothes dry? Does it seem like it takes forever to dry your clothes? Your dryer vent maybe partially or fully clogged. Not only does this increase energy use, it is also a fire hazard. If you need your dryer vent cleaned or inspected, give me a call.

11/10/2021

Outside corners can be hard. A saw that is setup properly and good techniques can make for tight corners

Photos from Edgemont Home Repair's post 11/08/2021

A common mistake with trim work is mitering inside corners. Due to inconsistencies with drywall corners, it is hard to get a tight joint. Coping the inside joint is the beat way to prevent gaps. The coped joint takes about the same amount of time to make, but produces a better corner.

Photos from Edgemont Home Repair's post 11/05/2021

A couple of brisk mornings to install baseboard. Replacing baseboard in a house with 3 different styles of baseboard.

11/02/2021

Today was a prep day. 560 feet of baseboard to be painted in preparation for installation later this week.

11/02/2021

Breaking some ash boards down for a furniture build. I have been a woodworker since I was a teenager. I milled these ash boards up from and they have been drying for 3 years now. They are now destined to become a table. Make sure to follow and like to see the progress.

11/01/2021

Had to go get a new saw for an upcoming trim job. Hopefully get a lot of use out of this saw over the next few years.

Want your business to be the top-listed Furniture Store in Gallipolis?
Click here to claim your Sponsored Listing.

Category

Telephone

Website

Address


19 Edgemont Drive
Gallipolis, OH
45631