Silagy Contracting LLC
Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Silagy Contracting LLC, Edison, NJ.
Saturday haul day
07/31/2020
Pavers done right. 4 1/2” of crushed concrete, 1 1/2 of sand, then the pavers. All elevations screeded and fine tuned with a laser. Here we are installing some pavers from Cambridge. Cambridge Toffee Onyx and Sahara Chestnut. Keeping it simple for this job.
07/30/2020
Pavers done right. 4 1/2” of crushed concrete, 1 1/2 of sand, then the pavers. All elevations screeded and fine tuned with a laser. Here we are installing some pavers from Cambridge. Stay tuned for the finished product unveil tomorrow. @ Edison, New Jersey
06/16/2020
First section of a 4” slab for the new modular units at FDR school. Nearly 13,000 SqFt in total. Under the slab, strip footings have been tied to the new slab with steel, as well as haunches against the walls. Everyone, even the masons are out with the proper PPE. “Safety is no accident”
06/16/2020
A beautiful job by our masonry crew. Here we demolished two old stairways and concrete sidewalks. All new foundations for the stairs. With the experience and knowledge of our crews, we were able to track down a close match to the mortar and brick used originally on the house. This brick was no longer being made as of 1979, an Ohio product. @ Edison, New Jersey
05/06/2020
Another group of photos from our total site development at James Madison Intermediate School. After we poured about 40 yards of strip footings for the mate lines of the modulars, we began the pour of the 13,000 square foot concrete slab @ James Madison Inter
A bit of a to our morning. This Case 590 is just creeping up on 7,000 hours
04/10/2020
More shots from our team on the James Madison Modular build from last year. Here, you can see the laser leveled 3/8 stone for and their foundation walls. Also, the drain tile will be filled with more stone and continue to be rolled in fabric. Next, you can see our team pouring the mate-lines with some rebar on wire chairs. These were left below the slab we completed next. @ James Madison Inter
04/08/2020
A few pictures from our site work at James Madison Intermediate School in Edison, NJ. Here we were the company tasked with underground drainage, foundations, a 12,000 square foot slab, and restoration. The final picture is 3/8 foundation and drainage for our friends at . Contact us for your residential or commercial construction needs today!
@ James Madison Inter
03/19/2020
A bit of a throwback to our foundation work for our long time client, . Here we saw cut, and excavated for foundations that held two pre-fab modular units. Our work scope included utility trenching, concrete/masonry, and a new opening in a masonry wall for a vestibule.
03/17/2020
“Single file”
A client in Heller Industrial Paris needed some protection for their generator. In two work days, from start to finish, we core drilled 14” holes for 6” steel bollards. These bollards were also primed in an effort to prevent future rusting at the top of the concrete. Call us for your next bollard job! @ Heller Industrial Park
02/04/2020
Full depth excavation for an asphalt patch. Replaced with a high grade v***r barrier, DGA, and two layers of asphalt for our long time client, Heller Industrial Parks.
Click here to claim your Sponsored Listing.
Website
Address
08817, 08818, 08820, 08837, 08899