Foster Structural Solutions

Foster Structural Solutions

Share

Specializing in glazed wall systems, structural glass components, and metal panel facades.

01/27/2026

Welcome to the FSS team, Austin!

12/23/2025

👀 Check out the stunning new healthcare facility that Foster Structural Solutions completed curtain wall engineering for! A beautiful addition to the Oshkosh area 👏🏼

We’re excited to share that ThedaCare Medical Center–Oshkosh is officially opening its doors.

This new health campus brings convenient, local access to care for families across the region. Care teams will welcome their first patients on Monday, January 19, 2026.

Located at 250 W. 6th Avenue along the Fox River, the campus supports Oshkosh’s ongoing downtown revitalization. With nearly 73% of residents living east of I-41 — and many more than 15 minutes from a hospital — this location helps ensure care is closer to where people live, work and spend their days.

Continue reading: https://thedacare.org/news-and-events/thedacare-medical-center-oshkosh-to-open-in-january-2026/

We look forward to caring for you in our new home.

11/27/2025

Wishing you all a Happy Thanksgiving from Foster Structural Solutions!

08/21/2025

🥳 Foster Structural Solutions LLC is turning 2! 🥳

We’re truly grateful for our amazing clients for trusting in FSS to deliver engineering solutions every day.

Here’s to many more years!

U.S. Soccer Breaks Ground on the Arthur M. Blank U.S. Soccer National Training Center 06/09/2025

The Arthur M. Blank U.S. Soccer National Training Center, set to open in 2026, will serve as an impressive new headquarters and state-of-the-art training facility for the U.S. Soccer Federation. The center will feature more than 12 outdoor soccer fields and 100,000 square feet of indoor courts to support all 27 U.S. Soccer National Teams. Additionally, it will include over 200,000 square feet of facilities, including locker rooms, meeting spaces, and much more.

Foster Structural Solutions contributed to this phenomenal addition to the U.S. Soccer Federation by providing engineering calculations for both the curtain wall and storefront framing of the building on the new campus. This project was especially exciting for FSS, as we spend many hours each week at the soccer field ourselves.

GC: Brasfield & Gorrie
Architect: Gensler
Glazing Contractor: Glass Systems, Inc

U.S. Soccer Breaks Ground on the Arthur M. Blank U.S. Soccer National Training Center Groundbreaking Celebrates Blank and his Family Foundation’s Generous Contribution; World-Class Facility Located at Trilith in Fayette County Expected to Open in 2026

06/03/2025

FSS in the community! Wishing Team FSS a successful soccer season this summer ⚽️

They started the season with a win tonight 👏🏼

04/17/2025

Welcome to the team Dave!

Photos from LeChase Construction's post 03/06/2025

Progress photos from Mohawk Harbor Event Center. Foster Structural Solutions had the opportunity to provide engineering services for the storefront framing on this exciting project. This new facility will have an indoor ice area for the Union College hockey programs, as well as, the ability to host concerts, conventions, and more.

Architectural Glass & Metal Company, Inc.

A look inside the new Appleton library ahead of public re-opening 02/13/2025

PROJECT SPOTLIGHT:
The gorgeous newly renovated, $40.4 million Appleton Public Library will be opening this Saturday. There have been many upgrades and changes to the library, including an updated children's area community gathering rooms, creating rooms, and much more. This renovation will be beneficial to many in the Appleton community.

One of the goals for the renovation was to add natural light to the building. Foster Structural Solutions contributed to that goal by providing delegated design services for the new glazed facade. Additional scope included engineering of the steel structure for the entrance canopy and the attachment to the curtain wall.

GC: The Boldt Company
Architect: Skidmore, Owings & Merrill
Glazing Contractor: Omni Glass & Paint

A look inside the new Appleton library ahead of public re-opening A new chapter is set to begin in Appleton. The grand opening is set for Saturday, February 15th.

12/25/2024
11/28/2024

Wishing everyone a very Happy Thanksgiving!

11/06/2024

The newly created Meritus School of Osteopathic Medicine, located in Hagerstown, MD, will feature a 200,000-square-foot D.M. Bowman Academic Hall as its main academic building. This state-of-the-art facility is designed to support the training of future osteopathic physicians with advanced classrooms, simulation labs, research spaces, and other essential resources.

Foster Structural Solutions provided structural calculations for the aluminum composite panel system including required stiffeners, sub-framing, and attachment to building structure. The panels are Reynobond 4mm F.R. core, and utilize Kanalco's KS3 dry set panel system.

GC: James G. Davis Construction (DAVIS)
Architect: Bushey Feight Morin Architects Inc.
Panel Installer: Service Glass Industries Inc.
Panel Fabricator: Kanalco LTD

Want your business to be the top-listed Contractor in De Pere?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


De Pere, WI