Aggregate Engineering Inc.

Aggregate Engineering Inc.

Share

Construction Services Include. General Site Work, Hard Demolition, Excavation, Custom Grading, Integrated Concrete Structures, Footings, Finish Floor.

Soil Grade, Rock Grade, Free estimate / advice

Photos from Aggregate Engineering Inc.  's post 12/19/2025

Bringing shade to the schools who are now utilizing available out door space for students. 800 square feet of seating and gathering. Get the children outside as much as possible.
Send us a note and we will draw up a plan for you and your team.

Photos from Aggregate Engineering Inc.  's post 12/16/2025

Getting good at these shade structures.

Shade and lawns with french drain.
Kindergarten shade and lunch patio.
Upper terrace shade with paver infill.

Send us a message if you want shade on your property. Thx.

Photos from Aggregate Engineering Inc.  's post 10/31/2025

School District- 95% relative compaction. Grade 60 #4’s @/18” O.C.E.W. - 15’ Max Expansion-With Control joint half the distance of each expansion. Snap Caps -1/2”Smooth Dowel. Completion photos to follow. Fun project. Completed and turn over is Monday. .

10/31/2025

School District -Two 4 post shade structures for the elementary school. Preparing grade with Class II aggregate base for new poured in place outdoor seating area. District made good use of available outdoor space for the children.

Photos from Aggregate Engineering Inc.  's post 08/27/2025

Rock grade-15 Mil V***r Barrier- getting tied in-Pour slab on grade. Shout out to Jim at Berkeley pumping for taking care of the 47m pump.

08/19/2025

10 Trucks 2 rounds all starting at 6AM. .

Photos from Aggregate Engineering Inc.  's post 08/19/2025

Perimeter & spread footings set for 6AM - 8/19. Templates & Columns.

Photos from Aggregate Engineering Inc.  's post 08/08/2025

Our team put the finishing touches on the perimeter footings, moment frames and grade beams at The Willows in Concord, CA.

Top & Bottom F6 spread footing tied into a moment frame. Grade beam and spread footing for HSS column. #5’s #6’s and #7’s.. Please comment if you like.

Photos from Aggregate Engineering Inc.  's post 07/16/2025

Let’s go…… at the Willows-Concord, CA. Aggregate Engineering Inc. Structural / non-structural. 705 feet of perimeter footings and 30 spot footings. Shout out to our team for slaying the layout and excavation.

07/16/2025

Ground breaking at the Willows in Concord, CA. the redevelopment has begun. Aggregate Engineering Inc. out of Concord, CA. has been awarded all the structural site work & engineering including the steel reinforcement plan. Soil off-haul by others. Video includes 705 feet of perimeter footing dig out and 30 - F6 spread footings. Hats off to our team for slaying the dig out and lay-out. More to come.

Photos from Aggregate Engineering Inc.  's post 07/02/2025

Another new walk way and 1,400 square foot patio with a 20’X20’ Pyramid shade structure built in school court yard. Includes drilled pier footings, with shade fabric that is 85% water proof and can handle 150 mph wind gusts. Includes walkway. Great way to expand usable out door space for staff or students. Includes (2) hexagon tables that seats 3 with one roll up entry for mobility impaired. Includes perforated pipe tied into catch basin for drainage. Bay Area. 510-750-5955. Text for a free consultation.

Want your business to be the top-listed Contractor in Concord?
Click here to claim your Sponsored Listing.

Category

Telephone

Address


1069 Shary Circle Unit D
Concord, CA
94518