Checking in on the Armenta Water Project. Armando is installing the 2 inch distribution line connection in the main valve box. Posted by Dale R Thomas
11/12/2016
Report by Dale Thomas - I am in Honduras for an assessment team trip by the EWB MN Professional Chapter, but arrived early to check things out in Armenta.
08/22/2016
It is Sunday, so... We're putting the band back together. After some hard work this week, we are listening to the warm up for a concert in Armenta.
08/20/2016
Team 16 has been working up in the mountain this week. There was about 800 feet of 6 inch transmission line left to connect to the upper pipe crossing. Posting by Dale R Thomas - Team Leader.
08/04/2016
There are a few tickets left, grab them while you can!!
5th Annual Engineers Without Borders White Sox Fundraiser EWB White Sox Fundraiser
06/27/2016
EWB-CPC June General Chapter Meeting Conscious Impact volunteers in Nepal.
06/01/2016
Extension for Early Bird ticket price! Grab 'em NOW!
http://www.brownpapertickets.com/event/2533460
And pouring
Shoveling rock
Shoveling sand
05/29/2016
Team 15, Friday: 12 hours, Temps in excess of 116 on the deck. 60 tons of concrete poured ..... one 5 gallon bucket at a time.
05/29/2016
Team 15, Thursday: Half day - got all the rebar placed then went to visit the waterfall at the park.