Photos from BlueMaxx Contracting LLC's post 05/14/2022

Shower door

Photos from BlueMaxx Contracting LLC's post 04/14/2022

While I'm at it...I finished a bunch of other stuff too...

Photos from BlueMaxx Contracting LLC's post 04/14/2022

Well... it only took me 2 years... and several changes... and a complete redo in the last month... but I finished my bathroom 😆...

Photos from BlueMaxx Contracting LLC's post 01/12/2022

So, now I'm on to all the little stuff... grout, molding etc... this light box was an after- thought though... which in hindsight is the worse kind of idea lol... but I managed to make it work... still has a few more finishing touches to be done.

Photos from BlueMaxx Contracting LLC's post 01/12/2022

Once finished with the floor...I could move on to the tile.

Photos from BlueMaxx Contracting LLC's post 01/12/2022

So... new year and I finally got around to tackling this bathroom floor. Because I'm dealing with a compound slope I had to get creative leveling the surface for the Teak shower floor. My final solution was 3/8 hex lag bolts, bolt wedge anchors, pex tubing... and a whole lot of patience. The result was a perfect fit and level x & y.

Photos from BlueMaxx Contracting LLC's post 12/02/2021

I finally finished the build in cabinet... roughly 200 hrs, some 500 pieces... and lots of elbow grease... pine and cedar with a cognac stain and satin finish.

Photos from BlueMaxx Contracting LLC's post 11/11/2021

Basement update: My father was a career military man...25yrs active service. Extremely proud of him for that. So...this build is dedicated to him for him. Here we will be able to honor and remember his service...I still have some finish work before staining... but I wanted to share it anyway.

Photos from BlueMaxx Contracting LLC's post 10/08/2021

Finally... deck 3 of 3 is finished.

Photos from BlueMaxx Contracting LLC's post 09/22/2021

1 down and 1 to go... all in all not bad for 21hrs.

Photos from BlueMaxx Contracting LLC's post 09/18/2021

A little progress update on the deck...2 days (14 hrs)...tbc on Tuesday...I seriously pride myself on building the safest decks possible for clients... absolutely impairative.

09/07/2021

Permits approved... time to build some decks... oh how I miss these days...