Railhead Corporation

Railhead Corporation

Share

With three divisions, Railhead Corporation is working hard to keep our customers moving both safely & securely. Railhead Corp.

We specialize in safety equipment for the railway & airline industry; mobile video surveillance; and high-quality air tools. was founded in 1964 out of Chicago, IL and today is the parent company of three subsidiaries which serve the industrial marketplace. Our differentiating factor is that we provide product development and equipment design; specializing in customized solutions; concept to produ

07/29/2026

Small gaps start to show mid-year🗓️

🔍Mid-Year Field Check: Where is your crew at today?

1. Visibility at night
Is lighting still consistent across all work zones—or are crews adapting on the fly?

2. Field gear performance
Are headlamps, cameras, and wearable equipment still holding up under heat, dust, and long shifts?

3. Crew fatigue factors
Are tools reducing strain—or adding to it?

Those gaps don’t stay small for long...

Close the Visibility Gap
KE-HLFC625R https://hubs.li/Q04hm-hC0
RH-SSC-200 https://railheadcorp.com/products/switchmans-stick-railhead-logo-clear-4-aaa-batteries-included-8-16-pull-magnet

07/22/2026

👷🔦When visibility in the field drops, everything slows down — and that turns into cost.

Most flashlight failures are actually gradual (fading, battery degradation, dust or moisture shows up).

3 hidden performance losses crews deal with every shift:

-Lumen drop-off (often unnoticed until critical)
-Heat-driven battery degradation cutting runtime short
-Beam distance that underperforms outside lab conditions

These losses compound into real downtime and risk.

The KE-FL1065 and RH-RT1000R are built for that field based reality:
consistent output, heat-dissipating aluminum, and beams designed for actual field conditions,

🔦 https://hubs.li/Q04f7Dwq0

🔦 https://hubs.li/Q04f7v3y0

07/15/2026

Avoid compounded risk this summer.☀️🥵
Heat, glare, long hours, tighter margins—everything stacks.

12-Hour Shift Reality:
0–4 → Low light to glare → stay aligned
5–7 → Heat + fatigue → reduce strain
8–10 → Pressure spikes → stay steady
11–12 → Fatigue peaks → close out safely

RH-PWL450R + M26 Safety Light
Built to hold visibility through it all.

RH-PWL450R: https://hubs.li/Q04f1ddD0

M26: https://hubs.li/Q04f1lNW0

07/08/2026

When temps rise, crews are working in conditions that quietly degrade visibility, equipment performance, and reliability windows.

☀️ Top 5 Field Failures in Summer Operations

1) Dead batteries in extreme heat
2) Glare + low visibility at dusk
3) Equipment overheating
4) Rapid battery drain under continuous cycling
5) Dust + heat-related performance drop

A critical moment exposes them. Summer operations are about about staying predictable.

Built for these conditions:
M18-SOLAR: IP66-rated protection for dust, rain, and harsh field environments. Solar— Night-time operation only https://lnkd.in/eYN_b_mN
KE-501: Fully weatherproof, vibration-resistant design with up to 5 years of battery life for long-duration field use. https://hubs.li/Q04d-J6p0

07/02/2026

Have a Happy & Safe Independence Day! 🎇

🚆Peak travel brings tighter schedules, heavier traffic, and less margin for error.
Extended holiday shifts and increased rail activity make visibility and reliable gear critical.

📅Railhead will be closed Friday, July 3rd and will reopen Monday, July 6th.

Gear up:
RH-HL800R – Long-throw visibility when it counts
https://hubs.li/Q04nd79S0
RH-GS – Durable protection with a secure grip
https://hubs.li/Q04nd4bz0
RH-19X9RSFA.080 – Clear, high-vis communication in the field
https://hubs.li/Q04ncXx60

06/24/2026

Tech Savvy. Safety Ready. Built for This. 🌐🚅

Railhead is headed to the APTA Rail Conference in Baltimore June 28–July 1!
Stop by our booth # 429 to see what’s new—and don’t forget to ask about Railhead giveaways 😉

Our mission aligns with APTA’s focus on advancing rail safety, technology, and operational performance—supporting crews with rugged LED lighting, video systems, and PPE built for the field.

Railhead provides dependable technology designed to improve rail safety and operations such as :

EOT (Rear-End Marking Device) https://hubs.li/Q04mspLY0
Track Clearance Light https://hubs.li/Q04msphX0

06/17/2026

Spot hazards before they become a danger ⚠️

Railroad workers need lighting that reaches farther.

Why beam distance / early visibility matters:
1️⃣ Spot hazards sooner
2️⃣ See track conditions ahead
3️⃣ Stay safer around moving equipment
4️⃣ Improve team awareness

Suggested items that go the distance:🔦
Headlamp – KE-HL1000R- H: 787 ft / M: 558 ft / L: 131 ft https://hubs.li/Q04lg7KG0
Flashlight– RH-RT1000R Beam Distance : 945 ft https://hubs.li/Q04lfy3X0

Seeing farther = reacting sooner. Safety matters.

06/15/2026

Too many incidents in rail are preventable. That's the problem we show up to solve every day. 👷

🗓️June is National Safety Month — and at Railhead Corporation, it's a reminder of why we build what we build: advanced camera systems and rugged LED safety equipment designed for one purpose — getting crews and passengers home safe.

Your crew is counting on it.

How is your team marking National Safety Month? Drop it below. 👇

06/10/2026

Built for Long Days. Ready for the Full Shift. 🔋
When the workday starts early and ends late, your gear can’t quit halfway through.

Long-lasting lighting helps crews stay visible, productive, and prepared through inspections, overnight work, and extended shifts.

Top long run time picks⏰:
KE-FL40 – Up to 20 hours of continuous run time https://hubs.li/Q04bjmYw0
KE-HLFC185 – Up to 87 hours of run time https://hubs.li/Q04bjxx30

06/02/2026

Stop by Booth #2401 and say hello to the Railhead team at Railway Interchange, hosted by Railway Supply Institute (RSI) in Omaha! 👋🚊

We're excited to connect with you!

Want your business to be the top-listed Transport Service in Burr Ridge?
Click here to claim your Sponsored Listing.

Telephone

Address


224 Shore Court
Burr Ridge, IL
60527

Opening Hours

Monday 8am - 4:30pm
Tuesday 8am - 4:30pm
Wednesday 8am - 4:30pm
Thursday 8am - 4:30pm
Friday 8am - 4:30pm