08/14/2025
Westwood project update! π§
Hereβs what weβve accomplished so far:
β
Connected to town water
β
Decommissioned existing water well
β
Poured foundation for the extension
β
Laid down new drainage pipes
βοΈ Framing! πͺπ οΈ
08/11/2025
Making great progress on our luxury condo development in Brighton, MA. ποΈβ¨ From an oversized lot with a single-family home to 6 stunning new condo units - weβre bringing much-needed housing to the market this fall. Stay tuned for updates throughout completion of this project! π‘
07/25/2025
Framing inspection complete! β Next up: insulation and boarding up the walls. One step closer to moving our clientβs into their remodeled & expanded home π‘β¨
07/23/2025
Reconstruction of the back overhang on Beacon St is complete. βοΈβ Added style to this newly framed overhang with sleek black aluminum panels and high quality windows. π₯
07/02/2025
252 Lexington Ave U4 has been approved by the City of Cambridge! β
Back to work framing this new unit π οΈ
+Build
06/20/2025
Progress Update | Pratt Rd, Quincy MA
Check out the progress from the 2nd floor of our project in Quincy. The scope includes a full structural reconstruction of the 2nd floor and roof, including a new floor plan and additional living space.
π MEP Install
π Insulation
π Blueboard
Excited to deliver this transformative home renovation for our clientsπ‘π οΈ
+Build
06/13/2025
Progress Update | 27 Shepard St Brighton
β
Rough Framing 95% complete
β
Rubber Roof
β
Trades working in basement, 1st & 2nd floor
π Window & Siding Arrival and Install
π Finish Metal & Slate Install
π Finish Rough Mechanic Install
We are excited to bring these 6 spacious condos online during early fall! π‘βοΈ
+Build
05/26/2025
This Memorial Day, we honor and remember the brave men and women who made the ultimate sacrifice for our freedom. We are grateful today and every day.
05/16/2025
On 2/20/2025 the Cambridge City Council passed a residential zoning addendum that establishes a new base zoning height for residential neighborhoods of 45β, up from the prior 35β. This addendum is aimed to support housing supply in the 7 sq mi city.
Progress at 252 Lexington Ave Fresh Pond is currently paused pending approval from the Planning Board of an additional 4th floor unit. Below are some photos are the project so far.
1. Start of Project
2. Exterior 1/2β Zip System Support
3. Exterior 1/2β Zip System Enveloping & Pella Windows
4. Roof Replacement
5. I Joist Replacement
6. Basement Underpinning
7. U1 Basement
8. U1 First Floor
9. U2
10. U3
04/18/2025
Project Update | Brighton MA
Concrete slab was poured yesterday and Framing begins today. Progress continues on our six-unit condo project. From demo and excavation to foundation work and underground systems, the site is taking shape. Swipe through for a look at each phase so far, along with final renderings of whatβs to come.
1. Concrete Slab
2. Prior House
3. Site Cleared
4. Shoring Wall, Rebar for Footings
5. Retaining Wall, Footings
6. Partial Foundation, Formwork for Final Foundation Pour
7. Underground Plumbing
8. Closed Cell R14 Insulation, V***r Barrier, Wire Mesh, Rebar for Load Bearing Support
9. Rendering β Front View
10. Rendering β Back View
+Build
04/14/2025
04/08/2025
Kicking off a full home renovation in Quincy!
Scope of Work:
* 900 SF rear addition
* New screen porch
* New 2nd floor porch
* Full interior renovation
* Exterior siding replacement
Next Steps:
* Pour foundation & slab
* Demo existing interior
* Framing commencement
Follow to track progress of this transformation!
Click here to claim your Sponsored Listing.
Category
Contact the business
Website
Address
Boston, MA
01702
Opening Hours
| Monday | 9am - 6pm |
| Tuesday | 8am - 6pm |
| Wednesday | 8am - 6pm |
| Thursday | 8am - 6pm |
| Friday | 8am - 6pm |
| Saturday | 9am - 6pm |