Sidetracked Studio finally stepping up the gram game. Come check us out
07/16/2017
Tile install underway at our La Grange Project. Things are moving quickly and construction is nearing completion!
05/19/2017
meanwhile out at the LaGrange Ranch...exterior coming together, interior moving quick. updates to come!
05/19/2017
the devil is in the details. corner details. Tile installation at our Grover Residence.
03/21/2017
Walk-thru at our Preston Ave. remodel/addition yesterday. Up in the trees; no complaints over here.
03/06/2017
Framing underway out at the La Grange ranch. Pretty impossible to have a bad view.
02/07/2017
If we could spend every day out at our La Grange project we would. Even small projects demand big views...and deer, so so many deer. Foundation poured; gearing up for framing.
02/06/2017
framing underway at our Rollingwood Residence!
12/29/2016
29th street project moving along. snapped a shot of the new foundation and storage space below the relocated house and the historic stair leading up to the second floor. lots of paint stripping and tlc in it's future.
11/14/2016
Weekends are for art and architecture. Second round of schematic design with our clients from Kentucky followed by some East Austin Studio touring. Big thanks to Sarah and Harvey for making the trip down.
11/01/2016
Last week was a big week at our 29th street job site. Junior Brown and his crew moved the historic house from Wichita Falls TX. The first floor came in 3 pieces on 3 massive trailers. Here you can see the section of house awaiting placement above the basement. Hats off to the guys making this happen.
11/01/2016
Foundation in full swing at the Rollingwood job site. Garage slab poured; formwork for Garage wall going up. Looking forward to pouring the main level in the weeks to come.