Perfection Done Right

Perfection Done Right

Share

To showcase pictures of work and jobs we've completed to show our commitment to quality, service and

Photos from Perfection Done Right's post 01/21/2024

Making these rocking chairs usable again! Nice matching to the front door for this porch. Always sand, prime and then paint... 2 coats primer and 2 coats of the good paint!

Photos from Perfection Done Right's post 11/14/2023

Installed a 4 foot vinyl privacy fence. The 5x5 posts are in 24 inches of concrete. Removed all the excess dirt and finished with pea gravel.

Photos from Perfection Done Right's post 11/07/2023

Before and after pics in Apache Junction...

New trim, New light fixtures, 10 year paint. New front door combo with storm door.

Photos from Perfection Done Right's post 09/14/2023

Cabins 4 through 6 are now 90% demo.

Photos from Perfection Done Right's post 09/14/2023

Cabins 1 through 3 are 90% demo. The remaining corners will be removed after foundations and cabins set level. Cabins 4 through 6 will be finished tomorrow.

Photos from Perfection Done Right's post 09/13/2023

All cabins are now raised 24+ inches. All windows and doors removed.

Photos from Perfection Done Right's post 09/12/2023

4 cabins raised 24 or more inches in 2 days. I am meeting with a high pressure/vacuum excavating company in the morning. Need 9 holes per cabin...3 feet deep and 2 feet square for the foundations that I'm pouring. They can do it in 2 days and it'll take me weeks to hand dig. Fingers crossed that they have a good price.
Windows and doors have arrived.

Photos from Perfection Done Right's post 09/09/2023

All of these are getting completely remodeled... inside and out starting with raising 2 feet and pouring concrete foundations.

Photos from Perfection Done Right's post 09/08/2023

Raised this cabin 24 inches.

Photos from Perfection Done Right's post 08/28/2023

This cabin is complete. 6 more to go.

Photos from Perfection Done Right's post 08/22/2023

The cabin is finished inside. 10 weeks start to finish. 3 bedrooms, 2 full baths and a great room with a cabinet sink and microwave.
Starting the outside paint next after pressure washing tomorrow.

Photos from Perfection Done Right's post 07/15/2023

My Colorado project repainting the roof on all the buildings is finished.

Want your business to be the top-listed Home Improvement Business in Apache Junction?
Click here to claim your Sponsored Listing.

Category

Telephone

Address


Apache Junction, AZ
85120

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 12pm