Brisk Group

Brisk Group

Share

Brisk Group is the leading Romanian construction consulting company
#weareprojectmanagement

Brisk Group is an independent privately own company delivering high standard consulting services in the construction industry. With a divers experience in many industries and sectors, and proven capability of successful delivery of an array of large to small projects we are quality focused and committed to our client needs. Our creed is based on a spirit of community, trust, quality services and long term business relationships. Brisk Group has a robust set of management principles including strong customer focus, the motivation and implication of top management, a process driven approach and continual improvement. Our approach is focused on professional first class tailored services for individual client needs.Brisk Group is driven by innovation and by inspiring positive change at all levels in our clients organisations and their projects, by bringing in and applying lessons learned from our divers international experience. By applying principles, tools and techniques tried and tested through successful delivered projects on the Global Market we are committed to achieving and exceeding client requirements.

21/09/2026

Ten years. Ten principles. Week five.

Principle 05: Quality cannot be inspected into a building

Every defect list tells the same story: the flaw was born long before the inspection that found it. A specification left open. A detail never coordinated. A trade allowed to build over unverified work. By handover, an inspection can only measure the distance between what was intended and what was built.

That is why assurance runs through a project rather than after it: acceptance criteria fixed alongside the design, benchmarks and sample panels approved before work scales, hold points honoured before anything is covered up. Inspection confirms quality; it never creates it.

Handover should be a confirmation, not a discovery.

We have spent ten years making it exactly that.

18/09/2026

A fitness club is an engineering project wearing a lifestyle brand.

Members at World Class ParkLake now walk into a completely transformed club: reception and changing rooms fully renovated, new furniture, latest-generation Matrix fitness equipment, new accessories in the gym and the aerobics studio, all within a modern design that, in World Class's own words, motivates you to come back, day after day.

Behind the training floor, the studios and the wet areas sit the systems that decide whether a club actually works: air handling for high-occupancy spaces, water and drainage for the wet zones, fire suppression integrated with a live shopping centre, and an electrical backbone built for continuous operation. That is where a refurbishment of this kind is won.

For World Class ParkLake, Brisk Group delivered the full owner-side chain within one team:

→ Project management and cost management services
→ MEP management
→ Certified site supervision (dirigenție de șantier) and health & safety coordination
→ Technical design and as-built documentation for the sanitary, fire suppression, HVAC and electrical installations

Why the integrated model matters: in a refurbishment, cost and time are rarely lost inside a discipline; they are lost between disciplines, at the hand-over points between designer, cost consultant, site supervisor and contractor. When the same team designs the systems, prices them, supervises their installation and documents them as built, those interfaces disappear. Every design decision is costed as it is drawn. Every site decision is recorded before it is closed. And the operator receives an as-built file that serves as the true baseline for facility management from day one.

This is what project management in construction looks like when design capability sits inside the delivery team: fewer interfaces, faster decisions, and a club that works as well behind the walls as it looks in front of them.

16/09/2026

Large infrastructure leaves very little room for assumptions.

Nuclear facilities, airports, motorways, rail networks and ports operate at a scale where a single interface can affect programme, cost, safety and ultimately the performance of the asset itself.

The challenge is rarely one discipline in isolation. It is the coordination of hundreds of decisions, contractors, technical systems, authorities and operational constraints, all moving against a programme that cannot afford ambiguity.

Our teams have been involved in major infrastructure programmes across the UK, Europe, the Middle East and Asia.

Our experience includes:
▸ nuclear infrastructure, including Hinkley Point C
▸ major airport programmes, including Heathrow, Gatwick and Manchester, alongside projects in the Gulf and Asia
▸ motorway and road infrastructure
▸ rail infrastructure
▸ port infrastructure

Across these environments, the same principles matter:

◆ programme certainty is built through disciplined planning and project controls

◆ design interfaces need to be resolved before they become construction problems

◆ operational constraints must shape the delivery strategy from the outset

◆ reporting must support decisions, not simply record progress

◆ risk management has to reflect the real consequence of delay and disruption

◆ handover and operational readiness should be planned from the beginning

The same discipline now travels with us to Central and Eastern Europe and the Gulf, where the next generation of nuclear, motorway and airport programmes is being planned.

Major infrastructure is measured in kilometres, megawatts, passenger flows and decades of operation.

But successful delivery still comes down to something much more precise: clear governance, coordinated information and disciplined decisions.

If you are structuring a programme at this scale, we are happy to share how we set up governance and controls from day one.

14/09/2026

Recepție.

Dintre toate zilele pe care le putea alege, România a așezat Ziua Constructorului pe o zi de recepție. Recepție la terminarea lucrărilor, cm se numește astăzi, în lege.

14 septembrie 1895. Podul de peste Dunăre, între Fetești și Cernavodă: 4.087 de metri, inclusiv viaductele, cel mai lung din Europa la acea dată. Regele Carol I bate ultimul nit, din argint. Un convoi de 15 locomotive trece podul, ca probă de încărcare. Abia după aceea, lucrarea este primită.

Ziua aceea fusese pregătită cu 8 ani înainte, printr-o decizie fără nit de argint. Două concursuri internaționale, opt proiecte, patru țări, niciunul acceptat. În 1887, statul român a schimbat întrebarea. În loc să mai aleagă un proiect, a ales un om care să răspundă pentru întreg, de la planșă la recepție. Anghel Saligny avea 33 de ani.

O construcție este terminată când constructorul spune că este terminată. Este recepționată când cineva a răspuns pentru ea, în numele celui care a comandat-o, în fiecare zi dinaintea probei.

De 10 ani, acesta este locul nostru: între planșă și recepție, de partea celui care primește lucrarea. Sărbătorim în aceeași zi.

La mulți ani constructorilor!

08/09/2026

Ten years. Ten principles. Week four.

Principle 04: Information is a construction material.

Concrete, steel, glass and data. On a project, information behaves exactly like the materials on site: it has a supply chain, a delivery date and a quality standard. It can arrive late, incomplete or defective and when it does, the defect gets built into the works as surely as a flawed pour.

That is why a serious project treats its data with the discipline of a critical delivery: measured more often than it is reported, so trends surface before the meeting rather than in it; verified at the source; presented to decide, not to decorate.

A project is managed only as well as it is measured.

We have spent ten years treating information as structural.

02/09/2026

On 30 September, Mark Brownlee, Partner and UK Director at Brisk Group, will attend the British Aviation Group Annual Dinner at The Brewery, London.

The keynote address will be given by Chris Woodroofe, Managing Director of Manchester Airport. It is a well-timed keynote. Manchester has just completed its decade-long transformation programme, and its Managing Director will speak with the authority of the person who has to run what was built.

That is the perspective that should shape every airport project from the first day: the operator's. An airport is not delivered when the building is handed over. It is delivered when it opens well, and goes on operating well for decades.

As a member of the British Aviation Group, Brisk brings that perspective to airport projects from technical due diligence through to handover: decisions held ahead of the works, and the end state in view throughout.

We look forward to the evening.

31/08/2026

Termen.

În limba română, același cuvânt înseamnă și data-limită a unei lucrări și cuvântul exact al unei profesii. Ambele sensuri vin din latinescul terminus: piatra de hotar.

Un termen fixează o limită. În timp sau în înțeles.

Într-un proiect de construcții, cele două limite coincid. Un grafic este o propoziție despre timp. Un deviz este o propoziție despre bani. Un proces-verbal este o propoziție despre ceea ce s-a decis. Precizia cuvintelor precede precizia lucrărilor.

Vocabularul șantierului românesc a fost adus din franceză, odată cu inginerii secolului al XIX-lea: deviz, antrepriză, șantier, beton. Vocabularul managementului de proiect a venit, un secol mai târziu, din engleză. Limba le-a primit pe toate și le-a făcut ale ei.

Ziua aceasta a fost sărbătorită întâi la Chișinău, din 1990. România a adoptat-o în 2013. Lucrăm în ambele capitale, în aceeași limbă, cu aceeași precizie.

La mulți ani limbii române!

28/08/2026

Ten years. Ten principles. Week three.

Principle 03: Costs are committed long before they are spent.

By the time the first concrete is poured, most of a project's final cost is already fixed, set by the brief, the design, the procurement route. The site is where money leaves the account; the early phases are where it was decided. Industry curves make the point brutally: the same change grows up to a hundred times more expensive between concept and handover.

That is why serious cost management lives upstream: interrogating the brief, pricing options while they are still options, testing the procurement strategy against the market so that value is designed into the project, not reclaimed at the end of it.

Cost control that begins on site begins late.

We have spent ten years upstream.

26/08/2026

Financing in place. Turbines on the road. A date in the calendar.
Văcăreni is moving, and Agenda Constructiilor & Fereastra has the full picture.

Their report on the 102 MW wind farm developed by BIG MEGA Renewable Energy sets out where the project stands: more than €100 million of syndicated financing from Erste Group, BCR, Intesa Sanpaolo and VÚB; the first Goldwind components already en route to Tulcea; commercial operation scheduled for September 2027.

It also sets out who is delivering it. TYPSA as Owner's Engineer. CJR Renewables on Balance of Plant. Brisk Group, subcontracted by TYPSA, on site supervision for MEP and civil works.

Our role is simple to state and exacting to perform: what is built must match what was designed, verified as it happens, across seventeen foundations and the electrical infrastructure connecting them to the 400 kV grid.

Thank you to Agenda Construcțiilor for the precision of the reporting, and to TYPSA for the collaboration on site.

Seventeen turbines. 102 MW. September 2027.

20/08/2026

Somewhere above you, right now, a terminal is being rebuilt.

And if the work is done well, you will never know.

Airports are the only environment where the client's core asset, the passenger journey, runs straight through the middle of the construction site, every single day. There is no pause button. Flights depart on schedule while structures change around them.

Delivering in that environment demands a different calibre of project discipline: works compressed into hours, not weeks; logistics planned to the level of a single tool; coordination between disciplines that leaves nothing open to chance; and a programme that answers, every morning, to a departures board.

Brisk Group has been, and continues to be, involved in airport projects across Europe, the Middle East and Asia, from client-side advisory and design management to planning, project controls and development monitoring.

We are also active members of the British Aviation Group, the UK's leading association of companies delivering airport infrastructure worldwide.

What airports teach, we apply everywhere:

◆ the operation defines the programme, construction adapts to it
◆ certainty is engineered early, in design coordination, not recovered late on site
◆ every stakeholder with the power to affect delivery has a seat and a decision route
◆ project controls are calibrated to the true cost of disruption, not just to budget lines
◆ handover is planned as carefully as construction itself

Some of the most sophisticated project management in the world happens in places built for everyone to pass through and designed for no one to notice.

Want your business to be the top-listed Realtor/realty Service in Bucharest?
Click here to claim your Sponsored Listing.

Telephone

Address


The Mark Tower, 84/98 Calea Grivitei, 3rd Floor, District 1
Bucharest

Opening Hours

Monday 09:00 - 18:00
Tuesday 09:00 - 18:00
Wednesday 09:00 - 18:00
Thursday 09:00 - 18:00
Friday 09:00 - 18:00