VPC Development Management Group, PSC
Construction and Program Management
Inspection Services
Smart Development Management
Public-Private Partnerships
Facilities Management
Engineering
VPC Development Management Group, P.S.C. is an advisory and management services company, established in Puerto Rico to actively participate and to serve other participants in the real estate development and construction industries with a comprehensive, integrated and multidisciplinary approach. We create value to our partners by offering project-specific professional teams with the expertise and a
04/09/2020
El descascaramiento o “spalling” en el concreto es un defecto que se observa muy comúnmente en estructuras, usualmente viejas, en Puerto Rico. Esta condición es provocada por la expansión volumétrica por corrosión que sufre la varilla o acero de refuerzo al estar en contacto con humedad de aire o agua por tiempo prolongado. Comúnmente se le llama a esto “varilla explotada”. De no atenderse, esta condición puede degradarse a tal punto que su reparación puede ser muy extensa y costosa y hasta producir fallas estructurales.
La evaluación, diagnóstico y tratamiento adecuados para esta y otras condiciones similares son fundamentales para asegurar la durabilidad de la inversión y el restablecimiento de la capacidad de la estructura que se repara. El uso de materiales adecuados y el entrenamiento técnico correcto, tanto en la identificación de defectos, como en la aplicabilidad y uso de los mismos es muy recomendable para salvaguardar vida, propiedad e inversión.
VPC Construction Group
VPC Development Management Group, PSC
OPORTUNIDAD DE EMPLEO DE VERANO para estudiantes de arquitectura, ingenieria civil, ingenieros o arquitectos recien graduados. Otros profesionales con conocimiento de construcción o facilidades también pudieran ser elegibles dependiendo de su experiencia.
Pueden solicitar más informacion y enviar su resumé a [email protected].
Se les estará contactando para más detalles
14/02/2018
New solar glitter can make virtually anything solar powered Sandia National Laboratories and mPower Technology signed a licensing agreement for microsystems enabled photovoltaics, bringing solar glitter closer to market.
20/10/2017
Opportunities now available for non licensed engineers or architects with experience in construction and/or facilities
Send you resume to:[email protected]
Joaquin Lopez on LinkedIn: "VPC Group is committed and… VPC Group is committed and ready to collaborate in the restoration and rebuild of Puerto Rico We have job opportunities for qualified licensed engin…
11/10/2017
VPC Group is committed and ready to collaborate in the restoration and rebuild of Puerto Rico
We have job opportunities for qualified licensed engineers and architects with experience in construction and/or facilities
Send resume and qualifications to [email protected]
Joaquin Lopez on LinkedIn: "VPC Group is committed and… VPC Group is committed and ready to collaborate in the restoration and rebuild of Puerto Rico We have job opportunities for qualified licensed engin…
07/08/2017
Phase 1 of Combined Heat and Power project completed at Edwards Lifesciences and Technologies in Añasco PR. Very complicated site with existing infrastructure and high water table. A 20,000 gal. gas tank was requested by the owner to be installed underground while generator was installed at existing warehouse site that had to be demolished. VPC provided all permitting, civil and structural design for this engineering challenge. Very happy that we pulled it through without major issues.
26/07/2017
So proud of being invited to speak to the 2017 class of SBA Emerging Leaders. Thanks to the EL Team for your consideration!
12/09/2016
Revisión Operacional de Diseño, cuando y por qué? Uno de los asuntos que más inconvenientes, impases, reclamaciones y costos añadidos afecta a los proyectos en construcción es la necesidad de cambios en equipos, sistemas y muchas veces hasta en
12/09/2016
Operational Design Reviews, the when and the why? One of the issues that creates more inconveniences, claims and added costs to projects already in construction is the necessity of changing specified equipment, systems and in many cases structures
12/09/2016
September 12th, 2016 One of the issues that creates more inconveniences, claims and added costs to projects already in construction is the necessity of changing specified equipment, systems and in many cases...
12/09/2016
Revisión Operacional de Diseño, cuando y por qué? Uno de los asuntos que más inconvenientes, impases, reclamaciones y costos añadidos afecta a los proyectos en construcción es la necesidad de cambios en equipos, sistemas y muchas veces hasta en...
07/09/2016
Muy interesante!
Cost-effective modern home sports an outdoor climbing wall that reaches the roof
Haga clic aquí para reclamar su Entrada Patrocinada.
Categoría
Contacto la empresa
Teléfono
Página web
Dirección
381 Avenue Eleanor Roosevelt
San Juan
00918
Horario de Apertura
| Lunes | 08:00 - 17:00 |
| Martes | 08:00 - 17:00 |
| Miércoles | 08:00 - 17:00 |
| Jueves | 08:00 - 17:00 |
| Viernes | 08:00 - 17:00 |
| Sábado | 08:00 - 17:00 |
| Domingo | 09:00 - 17:00 |