HPEC Engineering
Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from HPEC Engineering, Automation service, Khanewal Road Multan, Multan.
We are specialist in repairing, manufacturing, and fabrication.We are skilled in CAD/CAM designing, CNC machining, and precision engineering_ enabling us to create new components, modify existing ones, and deliver high-quality technical solutions.
31/12/2025
As we welcome the New Year, we extend our sincere appreciation to all our valued Followers, Engineers, Technicians, and Professionals throughout world. Your dedication and technical excellence continue to drive progress and quality in Industry.
We wish you a successful, safe, and prosperous New Year filled with growth and achievement.
We automated our customized blow moulding Machine Fixture by using Pneumatic actuators and Valves.Process cycle timing controlled by coded embedded integrated circuit Board at our place . HPEC Engineering Khalid Aslam
CAD /CAM
Computer Aided Design and Computer Aided Manufacturing , It's Miracle of Technology and Engineering as well!
Laser cutting in action 🔥 HPEC Engineering
Portable Fl**ge Facer Machine , A compact tool in field where Line commissioning is done.
HPEC Engineering
Khalid Aslam
12/12/2025
PT Testing (Penetrant Dye Testing) on a critical pipeline section. This method helps to detect even the smallest surface defects to guarantee reliability before further operation.
HPEC Engineering Khalid Aslam
Turning Design Into Reality _at which we are expert !
Metal sheet Work.
SF6 Gas Pressure (Contact) Guage repairing!
Done successfully and Now ready to Dispatch 🔥
HPEC Engineering Ammar Mazhar Ghouri
06/12/2025
SF6 Gas Pressure (Contact) Guage repairing!
Done successfully and Now ready to Dispatch 🔥
HPEC Engineering Ammar Mazhar Ghouri
05/12/2025
Hydraulic actuators Automation Work at HPEC Engineering for Pipe clamp bending.
Steps for Completion of project:
1- Designing
2-Machining the components
3- Fitting The mechanical Parts
4- Schemetic Control Circuit Diagram
5- Incorporating Mechanical & Electrical component
And it's done 🔥
03/12/2025
Fabrication Work in progress !
Plate form work !
Ali Haider RajPoot
Click here to claim your Sponsored Listing.
Category
Website
Address
Multan