FQ SOLAR
Engineering services
22/05/2026
32kw hybrid set up with 60kwhr batttery coming up...
18/05/2026
18kw hybrid on/off grid system paired with 64kwhr back up battery for day and night energy savings. Thank you for trusting us doc
13/05/2026
Up to 12 months 0% interrest. Send us a message for details
01/05/2026
Another solid installation done at Poblacion, Baroy, Lanao del Norte πͺβοΈ
πΉ 7.2kWp Solar PV System
πΉ 6kW Hybrid Inverter
πΉ 20kWh LiFePO4 Battery
From high electric bills to energy independence β‘
Daytime savings + nighttime backup = total control.
Powered by FQ Solar Power Engineering Services.
26/04/2026
β‘ ANOTHER CEBU PROJECT COMPLETED
π Laray, Inayawan Cebu
βοΈ 8.5kWp Solar Panels
π 8kW Hybrid Inverter
π 20kWh LiFePOβ Battery
βοΈ Lower electricity bills
βοΈ Reliable backup power
βοΈ Ready for heavy household loads
βοΈ Made by FQ SOLAR POWER ENGINEERING SERVICES
π© Message us for installation
π² 0905-947-1401
π² 0915-604-1828
17/04/2026
Completed β
3.6kW Hybrid Solar + 6.144kWh Battery + 6kW Inverter β‘
Thank you Perocho Family for trusting FQ Solar βοΈ
Enjoy lower bills and reliable power!
17/04/2026
LUZON GRID ALERT STATUS
as of 16 April 2026, 5PM
πππ₯π₯π¨π° ππ₯ππ«π
4:00PM-10:00PM
Capacity - 12,223MW
Demand - 11,966MW
35 plants are on forced outage; while 14 are running on derated capacities, for a total of 5137.2MW unavailable to the grid.
Factors that contributed to the raising of yellow alert:
- tripping of EERI 1, 2, 3; Ilijan Block A; and Ilijan Block B
- unavailability of hydro plants (Magat 1, 2, 3, 4)
A yellow alert is issued when the operating margin is insufficient to meet the transmission gridβs contingency requirement.
13/04/2026
Weβre thankful to be fully booked this month π
To all confirmed clients, your installations will proceed this month of May as scheduled. We appreciate your trust.
π Our team will be in Cebu on the 3rd week of this month for solar installations.
Feel free to message us in advance if youβd like to coordinate.
07/04/2026
Completed another 6kW Hybrid Solar System π₯
Paired with a 10kWh LiFePO4 Battery for maximum efficiency and backup power.
Donβt wait for rising electricity rates β go solar now.
30/03/2026
THE BEST TIME TO GO SOLAR IS NOW
With easy credit card installment options π³
Start saving today, pay over time.
11/12/2025
Completion of an 18 kW AC-coupled solar system with a 15 kWh backup battery at Lala, Lanao del Norteβ ready to upgrade next year.
Another step toward smarter, more reliable clean energy. Thank you for trusting FQ Solar Power Engineering Services.
Click here to claim your Sponsored Listing.
Category
Telephone
Website
Address
Purok 6
Tubod
9209
Opening Hours
| Monday | 8am - 7pm |
| Tuesday | 8am - 7pm |
| Wednesday | 8am - 7pm |
| Thursday | 8am - 7pm |
| Friday | 8am - 7pm |
| Saturday | 8am - 7pm |
| Sunday | 1pm - 7pm |