Global Formwork Solutions
GFS is an expert in temporary work. We provide outsourced engineering services, design and drawings. Formwork, Falsework, and other Temporary Works
16/07/2025
Scaffolding and formwork materials for your construction needs
-Ringlock
-Shoring jack / adjustable prop
-H-frame
-Panel formwork for wall
-Plastic board
-Tie rod and accessories
For our Mindanao area customers, pls contact us at
@ 09663675957 / 09615742780
Location: Ozamiz City, Misamis Occidental
01/04/2025
Breaking new ground in sustainable energy! 🌱⚡
Global Formwork Solutions proudly showcases the Construction of Several Structures for a 6-megawatt (MW) Biomass Power Plant in Aurora, Zamboanga del Norte by LPEC—the first biomass power plant in the province! 🏗️✨Completed way back 2023.
With the expertise and dedication of our Project Management Team, we delivered quality and efficiency, ensuring the success of this milestone project. This marks a big step forward in bringing clean, renewable energy to the region. Here’s to building a greener, more sustainable future together! 💚🌍
Build your project with us. Connect with us at [email protected] or visit us at 3/F Infinity Bldg., Don Anselmo Bernad Avenue, Misamis, Philippines.
31/03/2025
Tunnel cross passages (CP) are short tunnels that connect two running tunnels. Their purpose is to allow access from one tunnel to another in an emergency or for maintenance purposes.
Our design engineers, with collaboration to our manufacturing client, were able to devise and deliver purpose-built travelling formwork for wall and crown lining. With numerous CP, this reduces construction hours and allowing reuse of traveller formwork to next CP without dismantling the assembly.
21/03/2025
One of our simple but genuine ways to express teamwork and camaraderie that is led by our hands-on president.
This time, we included our vision to a new level of achievement, to be more successful in the construction industry.
17/05/2023
Design Stage:
This formwork traveler design for Cross Passage (CP) Tunnel was made possible through thorough discussion with client and understanding their need of formwork solution. The traveler has to lower down by more than 1 meter to pass through an overhead cast structure at the end of CP. The solution was to introduce an adjusting leg composed of inner and outer tube fitted with hydraulic jack inside. This allows the operation and moving of the traveler to be quickly executed from one CP to another thus saving cost and time, a significant aspect in a construction world.
02/01/2023
From concept to design and to er****on, GFS successfully provided a solution of steel bracket support during construction of a massive pierhead. The pierhead is located nearby a nullah where erecting a traditional birdcage shoring is prohibited. GFS designed and provided drawings for steel bracket with cantilevers at both ends, supporting weight of pierhead at estimated 600 tons of reinforced concrete. The weight is then transferred from steel bracket into the supporting heavy duty shoring towers. With concerted effort and our engineer’s experience and creativity, we find solutions to challenging construction temporary works.
05/11/2021
Quick tour at M+ Museum
Fly through M+ M+, Hong Kong’s new museum of visual culture, opens to the public on 12 November. Ahead of what promises to be one of the most anticipated events of the year...
16/10/2021
Important rule to live by if you are in this industry: Safety over cost
Scaffolding on the outer wall of building next to Beverly Hill apartment in Happy Valley collapses, two cars trapped (Updated: 10.55am) - Dimsum Daily 8th October 2021 – (Hong Kong) A 10m X 10m scaffolding on the outer wall of a building near Beverly Hill apartment at 4-38, Broadwood Road in Happy Valley just collapsed this morning due to the heavy rain and strong wind. Traffic has been disrupted as a result. According to reports, two cars were ...
16/10/2021
Important rule to live by if you are in this industry: Safety over cost
https://www.dimsumdaily.hk/scaffolding-on-the-outer-wall-of-beverly-hill-apartment-in-happy-valley-collapses/?fbclid=IwAR11iSOwYhWTZHCcGbtBjebreGOqFZqJLTxcTlKKC93Qhaiald4q0dhczms
14/02/2021
Join our team 👍🏽👍🏽
Click here to claim your Sponsored Listing.
Contact the business
Website
Address
3/F Infinity Bldg. , Don Anselmo Bernad Avenue
Misamis
7200
Opening Hours
| Monday | 8:30am - 5:30pm |
| Tuesday | 8:30am - 5:30pm |
| Wednesday | 8:30am - 5:30pm |
| Thursday | 8:30am - 5:30pm |
| Friday | 8:30am - 5:30pm |