Estimate, Design and Build

08/05/2021

ASTER PHASE 2 BLOCK 3 LOT 11-12 @ 60% TRANSITION

Photos from AMAI Construction's post 08/05/2021

Victoria, San Remegio @ 20% Transition

07/05/2021

HANA PHASE 2 BLOCK 1 LOT 15 @ 30% TRANSITION

07/05/2021

ASTER PHASE 2 BLOCK 2 LOT 1 @ 95% TRANSITION

07/05/2021

ASTER PHASE 2 BLOCK 2 LOT 23 @ 30% TRANSITION

07/05/2021

ASTER PHASE 2 BLOCK 1 LOT 34 @ 90% TRANSITION

07/05/2021

IRIS PHASE 1 BLOCK 4 LOT 1
100% FINISHED

07/05/2021

ASTER PHASE 2 BLOCK 2 LOT 29-30
100% FINISHED

07/05/2021

El Monte Grande @90% Transition

24/02/2021

Anami North Jugan
ASTER 1 P2 BLOCK 2 LOT 1
Transition @50%

24/02/2021

CITAA VILLAGE
Transition @30%