PCAB Registered Contractor: Residential & Non-Residential Building. We also accept home improvement & renovations.

Photos from WH Construction's post 11/02/2026

Rebar Works. Column reinforcements.

To ensure quality of the structures, connect with the right professionals.

Photos from WH Construction's post 17/09/2025

Construction of One-Storey Commercial Building.

On-going activities.

Roofing Works: Laying of 10mm insulation material & multi-rib roofing sheet.

Masonry Works: Laying of chb & plastering.

Concrete Works: Pouring of concrete for
slab-on-fill.

Electrical Works: Installation of rough-ins for electrical lines.

Waterproofing Works: Application of necessary chemicals to ensure water tightness, including application of negative-side waterproofing.

Finishing Works: Application of skimcoat in preparation for painting.

Photos from WH Construction's post 16/09/2025

Prior to concrete pouring of slab-on-grade or slab-on-fill, the following must be checked:

1. Formation Level (must be on its required level as per plan)

2. Area must be well-compacted. (using manual or machine compactor).

3. Ensure that the Polyethyelene sheet covers the entire area subject to concrete pouring (will serve as moisture barrier: nothing will pass through, in or out)

4. Check utility pipes/lines that must be laid prior to pouring.

5. Provision of the required reinforcing bars as per plan, & spacers for enough concrete cover.

6. Presence of Level indicators, could be string or rebar with tape, indicating the required thickness/level of concrete.

And you're good to go.

Photos from WH Construction's post 31/08/2025

Our 3rd commercial building from the same client. Thank you for the trust. 🙏

For your construction needs, contact us!

09/07/2025

From Office renovation, Home improvement, Construction of Residential & Commercial Buildings, Fencing, Waterproofing works, Custom-made furnitures up to Construction of Swimming pool we got you covered.

06/07/2025

A 60-sqm temporary site office mostly made of tubular steel & metal cladding.

05/07/2025

Value Engineering is a process focused on reducing cost, improving functionality without compromising the safety & quality of the project.

Congrats to our client & to the whole team!

video by: Shutterpix Film & Photography

Want your business to be the top-listed Engineering Company in Calapan?
Click here to claim your Sponsored Listing.

Telephone

Website

Address


Atis Street Barangay Lalud
Calapan