CompleteFinished Homes PH
Ph1rst Park Homes by Century Properties
WORK FROM HOMES! GET HIRED TODAY! Full/Part Time!
up to *34K/month allowance +40K/sale minimum!
at least 72 units in college w/TOR!
Tasks: sell 1-3 house units monthly
Package: •*14,000-34,000 monthly allowance
•2.5% commissions on NSP/sale
For interested applicants, you may send your cv/resumé to
[email protected]
18/01/2021
03/01/2021
NSCR PNR Clark Phase 1 Update 🛤️🚊(40.48%)
Partial Operation: December 2021
DOTR: PNR Clark rail project on track to be operational
The Department of Transportation said Thursday the Philippine National Railways Clark Phase 1 is on track to be operational by December this year.
It said PNR Clark Phase 1, or the Tutuban-Malolos line, had a 40.48-percent completion rate as of end-2020 and was scheduled to be partially operational by December 2021.
Phase 1 is a 38-kilometer rail line that will connect Tutuban, Manila to Malolos, Bulacan.. It is projected to reduce travel time from about 1 hour and 30 minutes to just 35 minutes.
The department said the construction of stations and viaducts were ongoing for Phase 1. Also ongoing is the installation of pre-cast segment of the girder.
The procedure includes molding and pre-stressing of segments on the fabrication yard, transport and lifting of precast segments, segment stitching and post-tensioning. This is carried out using a launching girder, winch system, span jack and pre-stressing jack and other heavy equipment.
The pre-cast segment, one of the main components of the rail line construction, is an engineering masterpiece designed and patterned after international railway construction guidelines.
The PNR Clark Phase 2 project, on the other hand, is a 53-km northern segment of the 147-km North-South Commuter Railway System, which will run from Clark in Pampanga to Calamba, Laguna.
The NSCR will have 37 stations, spanning 26 local government units and connecting three regions. The project will feature the country’s first airport express service, which will reduce slash travel time between Clark International Airport in Pampanga and Makati City from more than two hours by car to just under one hour.
The project is expected to be completed by 2024.
The civil works will help the Philippines’ economic revival as it will create about 24,000 local construction jobs in the next three years and 14,000 more jobs related to the railway system’s operations
Photos from
© Railway Journal and Rappler
© Manila Standard
https://manilastandard.net/mobile/article/343372
18/12/2020
WHAT ARE YOU WAITING FOR! GRAB OUR LAUNCHING PRICE BEFORE 12% VAT THIS JANUARY 2021!
SEND MESSAGE NOW!
27/11/2020
Phirst Park TANZA will be 40min DRIVE TO BATAAN! 🚗🏝🏗🏠🛣
No need to go to see the whole subdivision! Watch at home and reserve online by trasnferring funds while we still have few units left ! HURRY!
This month's reservations' gets: FREE FENCE and GATES!
PM us, ask us how
Save as much as 100-200K upon reserving 12,500 THIS MONTH!
HURRY!
15/10/2020
12K MONTHLY! 1.6M!
Tagaytay, Tanza, Calamba, Lipa, SanPablo, Pampanga, Pandi Bulacan
Developed by: CenturyProperties (Azure, TrumpTower)
Complete Homes with ☑️Tiles☑️Gate☑️Fence☑️Rooms ☑️Paint
Amenities: ✔️OutdoorCinema✔️LifeSizedChess Games✔️Outdoor Gym,across the subdivision!
PROMO MONTH is FREE:
✅MOVEIN FEES
✅Electrical Water Application
✅Room Partitions
✅Bank Charges
✅TURNOVER FEES
Call (0905) 643 2040
Click here to claim your Sponsored Listing.
Category
Website
Address
Office #2809, 28th Floor, The Prism Tower, Business Bay, Dubai, UAE
Calamba
2809